US Army Corps of Engineers BUILDING STRONG ® Military Programs Update Great Lakes and Ohio River Division US Army Corps of Engineers Don Johantges, PMP.

Slides:



Advertisements
Similar presentations
AFCEC Execution & AFIMSC Future
Advertisements

1 U.S. Army Corps of Engineers – Environmental Community 4/27/2015 USACE PERSPECTIVES ON CONTRACTING PROGRAMS FUDS FOCUS Robert F. Lubbert, P.E. 14 April.
1 U.S. ARMY CORPS of ENGINEERS BALTIMORE DISTRICT MILITARY PROGRAM TRI-SERVICES INDUSTRY OUTREACH FORUM 5 December 2006.
Army Implementation of Performance-Based Contracting 29 Jun 05 Mr. Jim Daniel Chief, Cleanup Division, USAEC.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
2013 ADC INSTALLATION INNOVATION FORUM | PAGE 2 Legal Authorities for Partnerships and Shared Services Jennifer Curtin January 16, 2013.
2011 ADC WINTER FORUM | PAGE 1 Developing Renewable Energy Projects on DoD Land Mr. Alan D. King Assistant Secretary of the Army for Installations, Energy.
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers (USACE) South Pacific Albuquerque (SPA) Daniel Curado Small Business Deputy Albuquerque.
The Natick Soldier Center Matthew Hill | Bret Richmond Polina Segalova | David Yoshida Franklin W. Olin College of Engineering 3 November 2003.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 “To BRAC or Not to BRAC” What happens if there is not a BRAC? ADC.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Society of American Military Engineers Northern Virginia Chapter.
U.S. Army Corps of Engineers Tulsa District
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers SAME DC Post Briefing SAME DC Post Briefing Mohan Singh, P.E. 25 March 2010.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
 Preparing Your Community for Defense Cuts and BRAC A Presentation to the Association of Defense Communities.
The Challenge of Excess Defense Facilities:
DESC Small Business Forum Newport, RI Installation Energy September 10, 2009.
The Military Health System: Orientation and Overview Dr. William Winkenwerder Jr, MD Assistant Secretary of Defense for Health Affairs 29 June 2005.
UNCLASSIFIED “It’s All About the Soldier” Net Zero – Energy Initiative Prepared by: Todd A. Dirmeyer Energy Manager 7 August 2012 Thanks to: DASA- I,E&E.
INTRODUCTION Mr. Benjamin W. Lawless NGB/A7O Chief, Operations Division Installations and Mission Support Directorate.
USACE South Atlantic Division (SAD) Central & South America
COL Mark UNCLASSIFIED 13 August 2013 US Army Environmental Command SAME Presentation 20.
UNCLASSIFIED Mission and Installation Contracting Command FOUO Cathy Bella PARC February 2012 Contracts or Agreements with Municipalities.
1 of 19 ASSOCIATION OF THE UNITED STATES ARMY INSTITUTE OF LAND WARFARE “INSTALLATION CAPABILITIES FOR A TRANSFORMED ARMY” October 3, 2005 Joseph W. Whitaker.
NAVAL FACILITIES ENGINEERING COMMAND 13 July 2015.
BUILDING STRONG ® US Army Corps of Engineers – Norfolk District SAME Industry Day Richard Klein Chief, Programs Branch Norfolk District 21 October 2010.
Marine Air Ground Task Force Training Command Marine Corps Air Ground Combat Center 1 MCAGCC Future Plans and Development.
BRAC: Using Lessons Learned to Address the Resource Challenges of Today August 7, 2012 Dr. Craig College, Deputy Assistant Chief of Staff for Installation.
UPDATE ON ARMY MILITARY MUNITION RESPONSE PROGRAM (MMRP) Mary Ellen Maly / SFIM-AEC-CDP / / DSN / 1.
US Army Corps of Engineers BUILDING STRONG ® The Baltimore District Society of American Military Engineers DC POST American Council of Engineering Companies/
Femp.energy.gov 1 US DOE Perspective on Deep Energy Retrofits Cyrus Nasseri US Department of Energy Annex 61 Technical Day April 13, 2015.
Cultural Resource Management in the Department of Defense September 29, 2005 Maureen Sullivan Federal Preservation Officer.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Engineering and Support Center, Huntsville Executive Order 13693: Federal Sustainability in the.
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Integrated Energy TrackIntegration of the Energy Industry.
A Culture of Sustainability NDIA 30 th Environmental & Energy Symposium Hank Habicht Chief Executive Officer Global Environment & Technology Foundation.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
0 This document is confidential and is intended solely for the use and information of the client to whom it is addressed. Public-Public and Public-Private.
Acquisition, Technology and Logistics The Department of Defense: Transforming the Business of Military Cultural Resource Data Brian Michael Lione Deputy.
US Army Corps of Engineers ® Southwestern Division Pacesetters – Army Strong – Engineer Ready! The U.S. Army Corps of Engineers and its Southwestern Division.
Phoenix Convention Center Phoenix, Arizona Life-Cycle Cost Analysis for large projects Agency Energy ManagerLife-Cycle Cost Methodology Jeanette Fiess,
VALUE ENGINEERING FORT BLISS, TX MILCON Transformation A Strategy to Support Army Basing Initiatives Jack Shelton PE, CCE Cost Engineer/Value Engineer.
Office of the Assistant Secretary of the Army Installations and Environment Our Installations Supporting the War: Relevant and Ready “Installation Transformation.
North Carolina Military Business Center August 19, 2009.
Slide 1 Fort Detrick Sustainability Planning Workshop #1 – Out Brief 1 Jul 08.
11/21/2015 8:15:59 AM11/21/2015 8:15:59 AM1 Installation Sustainability: Envisioning the Army’s Future LTC DAVE JONES Office of the Director of Environmental.
2004 DoD Standardization Conference Product/Process Certification Panel Bldg. 33 Washington Navy Yard Federal Bldg. Oakland, CAU.S. Courthouse Las Vegas,
Public Private Partnerships July 28, 2014 Joe Corrigan Barnes & Thornburg.
0 FEMA Region 6 Floods: The Response and the Costs Bob Bennett Response Division FEMA Region 6.
1 Defense Standardization Achievement Award Defense Logistics Agency Standardization of Fuels Equipment, Training, and Laboratory Operations Panel Presentation.
Brownfields 2004 September 2004 NTC Orlando Using All the Tools.
Charleston District US Army Corps of Engineers BUILDING STRONG ® 2016 SAME Savannah Post Annual Program Review.
Budget Study Sessions Strategic Support Proposed Operating Budget OUTCOMES: - A High Performing Workforce that is Committed to Exceeding.
US Army Corps of Engineers BUILDING STRONG ® Capital Investment Strategy (CIS) to Achieve Total Netzero Energy, Waste, and Water Porscha Porter USACE Engineering.
US Army Corps of Engineers BUILDING STRONG ® Military Programs Outlook American Council of Engineering Companies 2014 Annual Convention, Washington, D.C.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
Louisville District Overview
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
2016 ADC TRANSITION POLICY DOCUMENT FORUM. Key Policy Issues.
Energy Huntsville Opportunity Report April 2017
SAME Industry Day Richard Klein BUILDING STRONG®
USACE-Fort Worth District
Air Force Construction Management
U.S. Army Corps of Engineers Directorate of Contracting
Army Engineer Association Engineering & Energy Track 16 June 2015
Dr. Vida G. Wright, P.E., F.SAME Southwest Region Vice President
Mirko Rakigjija, PE (256) Dr. Michael E. Stovall, PE (256)
Justification = elastic clause Functions Control?
Society of Military Engineers Monthly Meeting, October 11, 2018
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Military Programs Update Great Lakes and Ohio River Division US Army Corps of Engineers Don Johantges, PMP Chief, Military Integration Division 20 March 2013

Military Missions Program Trends FY01-16 Program ($Millions) Fiscal Year As of 16 Apr 12

What is Changing in Military Programs?  Reduction in MILCON program and number of projects ► Significant reduction in the Army and the Air Force programs. DOD programs reduce but not as great as Schools and Hospitals are being funded  Increased potential requirements for Restoration and Modernization of existing facilities  Emphasis on design and material requirements for reduced energy demand and sustainability due to Executive Orders and Human Resources Command at Ft Knox VA Center in Ann Arbor, MI

BUILDING STRONG ® ASHRAE is our standard. (version 2009) LEED Certification – FY 12 NDAA prohibition on expending appropriated funds for anything above LEED silver. We believe AHRAE will get us to the LEED silver level. A Life Cycle Cost Analysis, (LCCA) is required for all energy enhancement measures exceeding ASHRAE Tri-service initiative underway for design proposals to include a LCCA for evaluation Energy and Sustainable Design 4

BUILDING STRONG ® Provides a holistic approach for ENERGY, WATER, and WASTE at Army installations Enables the Army to appropriately steward available resources, manage costs and provide Soldiers, Families and Civilians w/sustainable future Net Zero approach is comprised of five interrelated steps:  reduction  re-purpose  recycling and composting  energy recovery  disposal Each step is a link towards Achieving Net Zero. Army Net Zero Initiative 5

BUILDING STRONG ® 6 Renewable and Alternative Energy Production for Federal Installations HNC IDIQ Supports the DOD goal to produce or consume 25 percent of its total energy use from renewable sources by year 2025 Purpose is to procure reliable, locally generated, renewable and alternative energy through power purchase agreements or other contractual equivalents Intent of the government to purchase energy produced; not to acquire generation assets Allows for the purchase of energy up to $7B total over a period of 30 years or less from renewable energy plants that are constructed and operated by contractors using private sector financing

Look into the Future  FY14 Facility Investment Strategy  Sufficient facilities to meet mission at least cost with acceptable quality and quantity  Adjust Grow the Army mindset to a more constrained resource environment  Provide basis for future MILCON by f ocusing investments of reduced resources on leadership priorities  ACSIM controlled Sustainment, Restoration and Modernization (SRM) Program of ~$500M/year 7

What does that mean to us?  Installations will need support to develop project proposals that show Life-Cycle Costs that meet or beat new construction  Retrofit facilities to support functional changes – Flexible Use  Reduce reliance on national grid utilities  Reduce Demand  Use on-site renewable energy source 8

LRD Military Integration Division Mission Areas  Military Construction (MILCON) - $450M-$550M/yr ► Army/Army Reserve ► Air Force/Air Force Reserve ► Other DOD Agencies (DoD Med, DoDDs, SOF, …)  Installation Support – up to $200M/yr  Environmental - ~$110M-$140M/yr ► Formerly Used Defense Sites Program (FUDS) ► IRP/MMRP* - Active Sites ► Environmental Quality (EQ) – Active Sites ► Base Realignment And Closure (BRAC) – Legacy/2005 ► Formerly Used Sites Remedial Action Program (FUSRAP- Civil) ► Superfund/Environmental IIS (Civil)  Interagency and International Services (IIS) - ~$100M/yr *IRP = Installation Restoration Program/MMRP = Military Munitions Response Program 9

LRD Military Outlook: Total Military Program 10 $M

Michigan Indiana Kentucky Illinois Lake Michigan Lake Superior Lake Huron Lake Erie Ohio River N Ohio 15 Installations Scott AFB Fort Campbell Fort Knox Wright-Patterson AFB DSCC Anchor Installations Other Installations Rock Island Arsenal C.M. Price Center Newport AAP Grissom ARB Bluegrass Youngstown ARB Detroit Arsenal Selfridge ANG (BRAC05) Lima ATP Crane Naval AD LRD MILCON Programs 11 Army Air Force Other DoD

Army Reserve MILCON Program Puerto Rico USARC HQ Fort Bragg, NC 81 st RSC HQ Fort Jackson 99 th RSC HQ Fort Dix 88 th RSC HQ Fort McCoy 63 rd RSC HQ Moffett Field 12

13 FY13 MILCON from President’s Budget LRD Total LRD (26) : $552M PROGIDStLocationDescription MCAKYFort KnoxAutomated Infantry Squad Battle Course* MCAKYFort CampbellBattalion Headquarters Complex* MCAKYFort CampbellLive Fire Exercise Shoothouse* MCAKYFort CampbellUnmanned Aerial Vehicle Complex* SpecOpsKYFort CampbellHangar Addition Spec OpsKYFort CampbellGroup Support Battalion ECIPILRock IslandSolar Wall ECIPILRock IslandFactory Lighting Improvements MCA/SpecOps/ECIP (8) PROGIDStLocation Description MCARCATustinArmy Reserve Center MCARILFort SheridanArmy Reserve Center MCARNVLas VegasArmy Reserve Center/AMSA* MCARWIFort McCoyCentral Issue Facility* MCARMDAberdeen Proving GroundArmy Reserve Center MCARWAJoint Base Lewis-McChordArmy Reserve Center* MCARMADevens RFTAAutomatic Record Fire Range* MCARMDBaltimoreAdd/Alt Army Reserve Center MCARCAFort Hunter LiggettORTC* MCARNJJoint Base McGuire-Dix-LakehurstAutomated Infantry Squad Battle Course* MCARMADevens RFTACombat Pistol/MP Firearms Qualification* MCARWIFort McCoyDining Facility* MCARWIFort McCoyECS TEMF* MCARCAFort Hunter LiggettUPH Barracks MCAR (14) PROGIDStLocationDescription Health AffairsILScott AFBMedical Logistics Warehouse* Defense LogisticsINGrissom AFBHydrant Fuel System* DOD Educ Act.KYFt CampbellReplace Barkley Elem School DISAILScott AFBConstruct New DISA Facility * Already Advertised. All others imminent.Other DOD (4)

14 FY14 MILCON Projected within LRD President’s Budget is Not Yet Released. Total Projected for LRD ~$575M

Joliet Army Ammunition Plant (IRP) Military Environmental

Environmental Workload Trends ($ M) Steady next few years but declining as program goals met 16

Lake Erie Lake Ontario OH PA NY Luckey Niagara Falls Seaway Bliss & Laughlin Painesville Guterl Linde Bliss & Laughlin Ashland1/Seaway D/ RS Creek & Ashland 2 PA/SI RI/FS RD/RA COMPLETE Harshaw Shallow Land Disposal Area (Located in Parks Township) IN Joslyn Superior Steel LRD FUSRAP Program

Interagency and International Services Program  USACE provides 100% reimbursable support and technical assistance to non-Department of Defense (DOD) Federal, State, and Local agencies and organizations  Provide planning, engineering design and construction management, environmental services, and technical assistance related to water, natural resource, buildings and infrastructure  All seven LRD Districts are currently providing IIS support  LRD has identified 4 Strategic IIS Customers & Regional Accounts: ► EPA ► VA ► DOE ► DHS Interagency Agreements Customer Relationship Management 18

Interagency Support Program FY10 $111.2MFY11 $120.5M 19 Top Ten IIS Customers in FY12 Environmental Protection Agency Department of Veterans Affairs Department of Energy Department of Homeland Security Department of Agriculture State/Local/Private Department of Interior General Accounting Office Tennessee Valley Authority Department of Commerce FY12 $116.3M

QUESTIONS