Light Frame Construction

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Common Components of a Traditional Wood Framed Building
6. WOOD LIGHT FRAME CONSTRUCTION
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Exterior Walls- Framing & Structural Components
Competency: Draw Wall Sections
5. HEAVY TIMBER FRAME CONSTRUCTION
Residential Framing Prints Unit 14.
Architectural Drawing
Class Day Seventeen.
Skilled Trades 1201 Floor Framing
10 Chapter Floor Framing. 10 Chapter Floor Framing.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
Wood Frame Construction Common Components of a Traditional Wood Framed Building Gateway – Unit 7 – Green Architecture © 2012 Project Lead The Way, Inc.Green.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
Chapter 19 Floors.
Michelle Perticarari Rebeca Peña
BUILDING CONSTRUCTION V ARCHITECTURAL FINISHING SYSTEMS
ASSIGNMENT Begin on page 197 “The Foundation”.
Balloon Frame North-American invention, 1833
Wall and Ceiling Construction
Structural Components
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
Sill and Floor Construction
Choose a category. You will be given the answer. You must give the correct question. Click to begin.
Common Components of a Traditional Wood Framed Building
Light Wood Frame Construction
Residential Construction Mr. Todzia
BUILDING THE FRAME Walls are constructed in sections, lying down on the floor platform and then tilted up into position. Fundamentals of Building Construction,
Wall Framing Grimsby Secondary School Technology Dept.
Ag Construction Studs Vertical framing boards are called.
Wood Construction CTC-375.
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Residential Construction
Framed Structures Luisana Hernández.
House Construction.
APPLICATIONS OF TECHNOLOGY
CONSTRUCTION OF AGRICULTURAL STRUCTURES Mrs. Bagley.
Drafting 2 (Arch) Quiz Review #5
Competency: Draw wall sections and details
Floor System Sizes and Materials
Common Components of a Traditional Wood Framed Building
Warm-up 9/20/16 What is the underlayment called below the shingles?
Common Components of a Traditional Wood Framed Building
Framing Vocabulary Stud: upright beams in the framework of a building
OBJ: SWBAT create a CAD Rendering of a Utility shed.
APPLICATIONS OF TECHNOLOGY
Do Now #7 What are the dimensions of the footing?
Wood Frame Systems Civil Engineering and Architecture®
Competency: Draw Wall Sections
Use of Cantilevered Sill Plates with MPCWT to Align with Varying Thicknesses of Exterior Sheathing Overview Revised 3/22/2017.
Competency: Draw wall sections and details
Warm-up 9/19/16 What template are we using?
Drafting 2 – Honors Architecture Ardrey Kell High School
Objective 6.02 part 1: Recognize components of construction
Competency: Draw wall sections and details.
•Connecting to the Foundation & Bearing
Wood Structures Topic 8 Quality Workmanship
Competency: Draw wall sections and details
Common Components of a Traditional Wood Framed Building
Components of Construction
Unit 8 Floor Framing.
Common Components of a Traditional Wood Framed Building
Utility Shed Construction
Competency: Draw Wall Sections
Common Components of a Traditional Wood Framed Building
Utility Shed Construction
Information related to Chapter 7 in the textbook
Common Components of a Traditional Wood Framed Building
Presentation transcript:

Light Frame Construction

History Light wood frame construction invented in 1830 in Chicago by George Washington Snow He recognized that closely spaced vertical members used to fill space in walls of heavy timber was strong enough to carry weights Small boards and framing members became inexpensive due to new milling practices Machine made nails became cheap compared to hand forge nails Called balloon frame because it seem so thin

Balloon Frame Joist – Floors Studs – Walls Rafters – sloping roofs Disadvantages Fire strips required Studs are to long to be erect efficiently

Platform Frame Floor Wall – Load bearing Attic/roof Advantages Short studs Automatic fire stops Convenient working surfaces Disadvantages Each platform constitutes of a thick layer of wood whose grain runs horizontally Leads to vertical shrinkage –leads to distress in exterior or interior finish surfaces

Platform Frame Sheathing Is the key component for platform framing The end nails that connect the plates to the studs have little holding power against uplift of the roof by wind but the sheathing connects the frame into a single strong unit from foundation to roof. The rectilinear geometry of the parallel framing members has no useful resistance to wracking by lateral forces such as wind, but rigid sheathing panels or diagonal sheathing boards brace the building effectively against a surface to which shingles boards and flooring are nailed for finished surfaces.

Foundation for light Frame Structures Foundations for light framing originally made of stone or brink – are now made in most cases of site cast concrete, concrete block masonry or preservative treated wood Concrete and masonry foundations are highly conductive of heat and usually must be insulated to meet code requirements concerning energy conservation. Wood foundation is easily insulated in the same manner as the frame of the building it supports Further advantages claimed for wood foundations are that they can be constructed in any weather by the same crew of carpenters that will frame the building and they allow for easy installation of electrical wiring plumbing and interior finish materials in the basement.

Establishing the position, shape and size of building

Details of Foundations

Planning the frame Architectural floor plans serve to indicate the locations and dimensions of all walls, partitions and openings Exterior elevations are drawings that show the outside faces of the building with vertical framing dimensions indicated as required. Sections are also drawn that cut completely through the building showing the

Erecting the Frame Notice the basic simplicity of the building process A platform is built walls are assembled horizontally on the platform and tilted up into place and another platform or a roof is built on top of the walls Work is accomplished without the use of ladders or scaffolding and temporary bracing is needed only to support the walls until the next level of framing is installed and sheathed.

Attaching the frame to the foundation The sill preferably preservative treated or naturally decay resistant wood is bolted to the foundation as a base for the wood framing . A single sill is all that is required by most codes but in better quality work the sill is often doubled for greater stiffness The top of the foundation is usually somewhat uneven, so at low spots the sill must be shimmed with wood shingle wedges to be able to transfer loads from the frame to the foundation A compressible fibrous sill sealer should be inserted between the sill and the foundation to reduce air infiltration through the gap. The normal foundation bolts are sufficient to hold most buildings on their foundations, but tall frames in areas subject to high winds or earthquakes may require more elaborate attachments.

Floor Framing and Bridging The standard joist spacing are 16 or 24 o.c., measuring from center tot center of the joists Any of these spacing automatically provides a joist at every panel end Sub flooring should be glued to the joists to prevent squeaking and increase floor stiffness Plywood and OSB panels must be laid with the grain of their face layers perpendicular to the direction of the joists because these panels are considerably stiffer in this orientation Sheathing and sub flooring panels are normally manufactured 1/8” Bridging which is cross bracing or solid blocking between joist at midspan in a tradional feature of floor framing

Floor Framing and Bridging 2 Its function is to hold the joists straight and to help them share concentrated loads Although many building codes no longer require bridging, it should be used on better quality buildings because it makes a noticeable difference in the rigidity of a floor. Where needs of joists butt into supporting headers as around stair openings and at changes of joist direction for projecting bays end nails and toe nails cannot carry the full weight of the joists and sheet metal joist hangers must be used. Manufactured I joists and floor trusses are increasingly used in place of sawn joist because they can span farther between supports and they tend to be straighter.

Wall framing Sheathing and Bracing Some building codes require blocking to be installed at the mid height of the studs in wall frames that are taller than 8 ft. The purpose of this blocking is to stop off the cavities between studs to restrict the spread of fire. Headers over window and door openings must be sized in accordance with building code criteria. Typically, a header consists of two nominal 2 inch members standing on edge separated by a plywood spacer that serves to make the header as thick as the depth of the wall stud.

Roof Framing Pitch is specified as a ratio of rise to run Rise is the vertical dimension and run is the horizontal In the united states pitch is usually given on the architects drawings as inches of rise per foot of run

Prefabricated framing Assemblies Roof trusses and floor trusses find widespread use in platform frame buildings because of their speed of erection, economy of material usage and long span. Most are light enough to be lifted and installed by two carpenters Manufactured wall panels have been adopted more slowly than roof and floor trusses, except by large builders who mass market hundreds or thousands of homes pre year.