DIRECTORATE GENERAL OF SYSTEMS & DATA MANAGEMENT www.icegate.gov.inwww.cbec.gov.in CENTRAL BOARD OF EXCISE & CUSTOMS Local Area Network (LAN) Project Testing.

Slides:



Advertisements
Similar presentations
Remote Monitoring System 90% of organizations dont know: – # of devices in population – # of model numbers – # of pages printed – Toner levels in each.
Advertisements

TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
The Complete Visitor Management System
Print Job Tracker 5.0 For Windows XP/2000/2003 Service/Vista/Cluster/2008 Server/Windows 7.
P3, M2,M3,M4.
Networking By: Matt Motl… Programmer Brent Everson… Programming Mentor.
Service Manager Service Desk Overview
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 IT Essentials PC Hardware and Software 4.1 Instructional Resource Chapter.
Advanced Workgroup System. Printer Admin Utility Monitors printers over IP networks Views Sharp and non-Sharp SNMP Devices Provided Standard with Sharp.
July 11 - September FFIEC Central Data Repository Bank Enrollment.
COMPUTER CONCEPTS Computer Information Systems. COURSE COMPETENCIES Explain the functions of computer system components. Describe the information processing.
ITS Offsite Workshop 2002 PolyU IT Security Policy PolyU IT/Computer Systems Security Policy (SSP) By Ken Chung Senior Computing Officer Information Technology.
1 Technology Readiness Maryland /2015 Admin Schedule 2 AssessmentOnline/CBT Testing Dates PARCC - PBAMarch 2 – May 8 MSA ScienceApril 13.
MCTS Guide to Microsoft Windows Server 2008 Network Infrastructure Configuration Chapter 8 Introduction to Printers in a Windows Server 2008 Network.
CEO Juice Process for Sales Orders: Paperwork to Delivery Equipment Sales Order Process.
A+ Guide to Software, 4e Chapter 11 Supporting Printers and Scanners.
Designed By: Technical Training Department
Meditech Remote Access Training September 2011 Page 1.
Managing a computerised PO Operating environment 1.
Network security policy: best practices
Computer… An electronic machine Monitor Mouse Printer (Inkjet) Key Board Cabinet UPS PPT
TAX-AIDE Network Router Setup Network Printer Setups July SMT/TCS Training - Dallas1.
Name: Rafael Eduardo Barrios navas
G4 Control and Management Solution for Data- Centers and Computer Rooms.
Guide to MCSE , Second Edition, Enhanced 1 Objectives Understand and use the Control Panel applets Describe the versatility of the Microsoft Management.
Purpose Intended Audience and Presenter Contents Proposed Presentation Length Intended audience is all distributor partners and VARs Content may be customized.
ITimpulse NOC process This is an interactive, detailed, step wise guide explaining how alerts are managed at our NOC. This document contains information.
This presentation will guide you though the initial stages of installation, through to producing your first report Click your mouse to advance the presentation.
LGC Website and Customer On-line Tools LGC RESOURCE 2014.
Web Development Process Description
NV V5.7 Product Presentation. Brand New Professional GUI  Multiple User Interface for different look and feel  Audio indicator on camera (play audio.
1 QUICK TECH HELP HARDWARE. 2 HARDWARE TROUBLE SHOOTING. S. no. PROBLEMSREMEDY 1Non start of Computer  Check whether Floppy is left in Floppy drive Check.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Managing Computerised Offices Operating environment
Module 4: Add Client Computers and Devices to the Network.
Concepts of Database Management Sixth Edition
TERMS TO KNOW. Desktop This does not mean a computer desktop vs. a laptop. You probably keep a number of commonly used items on your desk at home such.
BASIC COMPUTER CONCEPTS What is a computer? An electronic device, operating under the control of instructions stored in its own memory unit, that can.
Installation And Troubleshooting Guide. PHONE REQUIREMENTS High Speed Internet Connection Using DSL Modem, Cable Modem or Wireless Canopy With a minimum.
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
Keeping you Running Part I Experiences in Helping Local Governments Develop Cyber Security and Continuity Plans and Procedures Stan France & Mary Ball.
Chapter 16 Designing Effective Output. E – 2 Before H000 Produce Hardware Investment Report HI000 Produce Hardware Investment Lines H100 Read Hardware.
 Maintains the Instrument Database  Generates the Calibration Schedules  Maintains Calibration Records  Provides Facility to enter All types of.
Module 10: Monitoring ISA Server Overview Monitoring Overview Configuring Alerts Configuring Session Monitoring Configuring Logging Configuring.
National Scholarships Portal
Systematic Alien Verification for Entitlements (SAVE) Program 2013 AAMVA Annual International Conference.
Hello We are looking for a coder to code the following We have a network that has different sites: we need an application that will scan the network and.
Existing Solution 1 Proactive – SLR 6 hour schedule activities for managed services Stop light report is posted and reviews any open tickets for.
California State University, Northridge Certification Process Team B Carlos Guzman John Kramer Stacey LaMotte University of Phoenix.
I.Information Building & Retrieval Learning Objectives: the process of Information building the responsibilities and interaction of each data managing.
Pack Company Procedures. Accepting a HIP request from a supplier Allocating the Component Providers Sending the instruction through to the Component Providers.
Training Role Module 8 – User Admin Ver. 10 Oct 2009.
Cctv Management Solution - CMS From – Intelitech Solutions Pvt. Limited. [ ITSPL Group ]
NETWORKING FUNDAMENTALS. Network+ Guide to Networks, 4e2.
Chapter 12 Implementation and Maintenance
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Remote Access Using a Netgear DG834 Router 1http://
STUDY RESOURCES 1. OVERVIEW OF STUDY RESOURCES Study documents Study overview documents (project overview, data requirements.
Run the on your PC to start the firmware configuration process Run IP Config Tool.
Proctor Caching and System Check September 4, 2014 Becky Hoeft Conference Number: (877) Conference Pin:
Technology Coordinator Training. Agenda Getting Started Using SystemCheck Technology Configurations Infrastructure Trial Proctor Caching Overview Managing.
CACI Proprietary Information | Date 1 PD² v4.2 Increment 2 SR13 and FPDS Engine v3.5 Database Upgrade Name: Semarria Rosemond Title: Systems Analyst, Lead.
Welcome.  Henrietta TurnerManager, License Administration Colorado Parks & Wildlife (CPW) IPAWS Project Sponsor  Ken ThomSenior IT Project Manager Governor’s.
Computer Information Systems
How to Fix HP Printer Server Connection Error 403
Unit 27: Network Operating Systems
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Chapter 11 Supporting Printers and Scanners
Preparing for and ADMINISTERING the ABMGG IN-TRAINING EXAMINATION
Presentation transcript:

DIRECTORATE GENERAL OF SYSTEMS & DATA MANAGEMENT CENTRAL BOARD OF EXCISE & CUSTOMS Local Area Network (LAN) Project Testing of Equipped LAN at other than Stand-alone Ranges & Operational Training on installed LAN equipment

PricewaterhouseCoopers Directorate General of Systems & Data Management 2 Slide Aug-15 Contents ATP Roles Process and Support Product Testing

PricewaterhouseCoopers Directorate General of Systems & Data Management 3 Slide 3 ATP and Roles ATP (Acceptance test process) : This process involves series of standard agreed tests to establish the following with respect to the LAN infrastructure deployed at CBEC offices : Verification of BoM Installation Quality Checks Functionality Check of the equipment installed LAN connectivity and integration with WAN, (if installed)

PricewaterhouseCoopers Directorate General of Systems & Data Management 4 Slide 4 Roles HP: Hewlett-Packard is the Lead Service Provider implementing the CBEC LAN Project PwC: PricewaterhouseCoopers is the Project Manager for the project and would carry out the Acceptance Test process. PwC/their outsourced representatives from CMS would be visiting all sites to conduct the tests. Lead Nodal Officer ( in charge of the building) is expected to facilitate the acceptance process and sign off on the Acceptance document immediately after completion. He would coordinate with other co-located CBEC offices to facilitate ATP on scheduled dates.

PricewaterhouseCoopers Directorate General of Systems & Data Management 5 Slide 5 Process and Support  Prior information would be provided to lead Nodal Officer ( 3 days in advance) regarding scheduling of ATP. Changes in the proposed dates may be minimised to enable overall adherence to project schedule.  ATP would be carried out by PWC and HP representative in presence of Lead Nodal Officer or his nominee (s) ( since adherence to schedule is necessary).  The team visiting for ATP from PWC and HP would brief the lead nodal officer / nominee (s) about processes, documentation and steps.  Any queries or clarification by CBEC officer during ATP process would be answered by local PWC and HP teams.Other queries may be escalated immediately to central teams of M/s PWC/ HP.  ATP activities may take one day or more ( according to the size of the location). Local assistance would be requested accordingly.

PricewaterhouseCoopers Directorate General of Systems & Data Management 6 Slide 6 Process and Support contd….  During ATP operations of various products would be demonstrated and on-site training provided by HP.  IT in-charge of the building should also be part of the process. If possible electrical in-charge may also be included.  Lead Nodal officer needs to sign-off on the test results and ATP documents. Any minor observations may be noted at time of sign off on the ATP document itself.  A copy of ATP report would be provided to Nodal officer for his reference and records.

PricewaterhouseCoopers Directorate General of Systems & Data Management 7 Slide 7 General Instructions regarding Product Testing ( Details as per ATP document) Thin Client Check for Physical damage, if any and record. Switch “ON” the thin client Enter User Name and Password provided by HP Personnel Check for application access e.g. ACES. Printing through Network laser/line Printer and/or directly connected printer (deskjet) Check for physical damage, if any and record Switch “ON” the Printer Create a test page in Open office installed in Thin Client Fire a Print out on the Printer configured

PricewaterhouseCoopers Directorate General of Systems & Data Management 8 Slide 8 Scanner Check for Physical damage, if any and record Switch “ON” the Scanner Take any document scan and save the document Open the document to verify if the scanning was performed properly Print Server Check for physical damage if any and record. Switch “on” the server Check general functionality Simultaneously Fire Printouts from more than one Thin Client to test the functionality of Print Queue. Product Testing contd….

PricewaterhouseCoopers Directorate General of Systems & Data Management 9 Slide 9 Power Equipment Different sets of acceptance process has been formulated for sites -With DG and UPS -With UPS only The appropriate test process is to be chosen and conducted. The test process is designed to establish the following : Out put voltage of DG and UPS at various stages. UPS Battery backup time of 15 minutes. Un-interrupted power supply change over. Auto start/shut down of DG in case of power failure. Manual start/shut down of DG. Product Testing contd….

PricewaterhouseCoopers Directorate General of Systems & Data Management 10 Slide 10 Contact Details of Central Teams HP Landline: for the ATP and training period For Hardware : -Akshat Sinha : -Suresh Lodhi : For Networking: -Ravinder Kumar : For UPS and Diesel Generator sets: -Debashish Dutta : PWC -Landline : Abhik Chopra : -Tripti Batra : -Cdr Deepak Uppal (Retd) : Directorate of Systems Central Excise & Service Tax Formations: Shri Suresh Kumar Additional Director Customs Formations: Shri Yogendra Garg, Additional director

PricewaterhouseCoopers Directorate General of Systems & Data Management 11 Slide 11 Operational Training The objective of this training is to familiarize users with the products installed and its usage This training would go hand in hand with the ATP drill. Audience: Thin client/ Printer/Scanner – All application users Diesel Generator/ UPS – Admin office or Electrical Vendor in- charge of Electrical system for the building Print Server/ Switch – Nodal Officer / Officer(s) familiar with IT

PricewaterhouseCoopers Directorate General of Systems & Data Management 12 Slide 12 Operational Training – Thin Client Thin Client How to switch “ON” and “OFF” Login into Thin Client Launch Applications – Firefox (Web Browser)/ Citrix client/ Open office Login in to application Take Printouts Basic Troubleshooting Power and LAN cables Monitor (TFT)/Mouse and Keyboard cables Powering Issues/ Keyboard or Mouse detection Check for Internet Protocol (IP) address LAN Connectivity testing

PricewaterhouseCoopers Directorate General of Systems & Data Management 13 Slide 13 Operational Training – Network Printer Network Printer How to switch “ON” and “OFF” Loading of Paper Take Test Printouts Basic Troubleshooting Power and LAN cables Check for Internet Protocol (IP) address Removing Paper Jam Toner replacement

PricewaterhouseCoopers Directorate General of Systems & Data Management 14 Slide 14 Operational Training – Deskjet Printer Deskjet Printer How to switch “ON” and “OFF” Loading of Paper Take Test Printouts Basic Troubleshooting Power and Universal Serial Bus (USB) cables Removing Paper Jam Toner replacement

PricewaterhouseCoopers Directorate General of Systems & Data Management 15 Slide 15 Operational Training – Scanner Scanner How to switch “ON” and “OFF” Loading of Paper Scanning a document Basic Troubleshooting Power and Universal Serial Bus (USB) cables Removing Paper Jam

PricewaterhouseCoopers Directorate General of Systems & Data Management 16 Slide 16 Operational Training – Print Server Print Server How to switch “ON” and “OFF” Login Scanning a document in case Scanner is connected to this Print Server Basic Troubleshooting Power and LAN cables Monitoring print queues Test printout to check Print queue

PricewaterhouseCoopers Directorate General of Systems & Data Management 17 Slide 17 Operational Training - Switch Switch Bring to notice of Nodal officer the location of switches Handover the Rack Keys Identify a switch Basic Troubleshooting Call Helpdesk for troubleshooting Power and LAN cables connection Login in to Switch Identification of what is Console Cable and what purpose it is to be used How to switch ON and OFF switch in case instructed from Helpdesk

PricewaterhouseCoopers Directorate General of Systems & Data Management 18 Slide 18 Operational Training – Diesel Generator Diesel Generator How to switch between Auto and Manual mode Manual Starting procedure How to check for Diesel (Fuel Tank) available status Oil status How to read Voltage and Current meter reading; Basic Troubleshooting Call Helpdesk for Troubleshooting

PricewaterhouseCoopers Directorate General of Systems & Data Management 19 Slide 19 Operational Training – UPS UPS Identify Input and Output Isolators ON and OFF position of Isolators How to read errors or notification on UPS LCD (there is a display on the UPS) screen Basic Troubleshooting Call Helpdesk for Troubleshooting and narrate the error on the display If Electrician is present: Check for Input and output voltage