Tom McMullen Week 3 25/2/2013 – 1/3/2013. LETI wafer thinning project flow Phase 1 IDProject NameOwnerDaysStartEnd 3-Feb10-Feb17-Feb24-Feb3-Mar10-Mar17-Mar24-Mar31-Mar5-Apr12-Apr19-Apr26-Apr.

Slides:



Advertisements
Similar presentations
Context Diagram Yong Choi BPA CSUB.
Advertisements

How Your Research Administration Team Supports You From Start to Finish Michelle Melin-Rogovin, Manager of Research Administration Research Administration.
Waiving Known DRC Violations from Layout IP
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
What is a System? Admissions Educate Graduation.
IBC Update Governor Update 4 December Invoicing: 20 Octdedicated team of 12 FTE commenced to clear backlog 21 Octpayment released for all invoice.
1 Payables Efficiency Through… Access Online PAYMENT PLUS.
April, 2003CMS tracker electronics1 APV25 Production Testing Status Mark Raymond, Imperial College Outline Yield studies current status of ongoing investigations.
Tom McMullen Week 5 4/3/2013 – 8/3/2013. LETI wafer thinning project flow Phase 1 IDProject NameOwnerDaysStartEnd 3-Feb10-Feb17-Feb24-Feb3-Mar10-Mar17-Mar24-Mar31-Mar5-Apr12-Apr19-Apr26-Apr.
Tom McMullen Week 9 1/4/2013 – 5/4/2013. LETI wafer thinning project flow Phase 1 IDProject NameOwnerDaysStartEnd 3-Feb10-Feb17-Feb24-Feb3-Mar10-Mar17-Mar24-Mar31-Mar5-Apr12-Apr19-Apr26-Apr.
Tom McMullen Week 6 11/3/2013 – 15/3/2013. LETI wafer thinning project flow Phase 1 IDProject NameOwnerDaysStartEnd 3-Feb10-Feb17-Feb24-Feb3-Mar10-Mar17-Mar24-Mar31-Mar5-Apr12-Apr19-Apr26-Apr.
Status and outlook of the Medipix3 TSV project
3D chip and sensor Status of the VICTOR chip and associated sensor Bonding and interconnect of chip and sensor Input on sensor design and interconnection.
Algorithms A Central Heating system Start Is temp <19
Plans for Demonstrator Flip Chip Bonding GTK meeting 9/12/08 1.
Tom McMullen Week 3 18/2/2013 – 22/2/2013. LETI wafer thinning project flow Phase 1 IDProject NameOwnerDaysStartEnd 3-Feb10-Feb17-Feb24-Feb3-Mar10-Mar17-Mar24-Mar31-Mar5-Apr12-Apr19-Apr26-Apr.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
STAR Microvertex Upgrade Meeting, Strasbourg, April Status of sensors from the engineering run AMS-035 OPTO Wojciech.
Chart Your Course to Business Success On Target Business Intensive: Session 7 May 8, 2012 Advisors On Target 1.
Tom McMullen Weeks 1 and 2 4/2/2013 – 15/2/2013. LETI wafer thinning project flow Phase 1 IDProject NameOwnerDaysStartEnd 3-Feb10-Feb17-Feb24-Feb3-Mar10-Mar17-Mar24-Mar31-Mar5-Apr12-Apr19-Apr26-Apr.
On Target Contractor’s Blueprint Chart Your Course to Business Success On Target Business Intensive: Session 8 November 14, 2013 Advisors On Target 1.
G. Parès – A. Berthelot CEA-Leti-Minatec GU project status.
Wimberley Market Days Progress Report Site Addressing and Management Analysis.
SHPE Jr. Chapter Training: Deliverables Maria Lopez Program Manager SHPE Foundation.
Meeting the donor. General rules All meetings with donors should respect the following rules : a) each meeting is well prepared in advance: you know exactly.
Report on TIPP D-IC Satellite Meeting Carl Grace June 21, 2011.
CERN November 2008 Marcello Mannelli CMS SLHC Tracker Thin Sensor R&D with HPK CMS SLHC Tracker Thin Sensor R&D with HPK.
CMS Phase 2 Tracker R&D R. Lipton 3/27/2014 Module R&D Allocation: Requested ~ $320k, received ~160k – Eliminate VICTR testing (continue with FNAL funds.
TPAC1.1 Progress JC: Dec 8 th. Laser No further investigation of odd scans on V1.1 De-ionizing filter needs replacing – On order… Bulb needs replacing.
Tom McMullen Period 3 Week 9 8/4/2013 – 12/4/2013.
© ABB Group November 12, 2015 | Slide 1 ICV Implementation in Region ERP- Status update March 2011 & Plan for Go-Live REMSC, 2011.
July, 2002CMS Tracker Electronics1 APV25 wafer testing Outline Mark Raymond, Imperial College Wafer test procedure speed improvements.
SOME COMMENTS Ulrich Heintz Brown University 7/23/2015Ulrich Heintz - HF plan 1.
Tom McMullen Week 7 18/3/2013 – 22/3/2013. LETI wafer thinning project flow Phase 1 IDProject NameOwnerDaysStartEnd 3-Feb10-Feb17-Feb24-Feb3-Mar10-Mar17-Mar24-Mar31-Mar5-Apr12-Apr19-Apr26-Apr.
MIT Lincoln Laboratory kickoff-1 PWW 4/7/2000 Via Topology for 3-D Integration 7 April 2000 Peter W. Wyatt and Paul V. Davis
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Tom McMullen Week 8 25/3/2013 – 29/3/2013. LETI wafer thinning project flow Phase 1 IDProject NameOwnerDaysStartEnd 3-Feb10-Feb17-Feb24-Feb3-Mar10-Mar17-Mar24-Mar31-Mar5-Apr12-Apr19-Apr26-Apr.
Application guidelines, Forms and evaluation criteria CBO Window Fannie Nthakomwa December 2015.
INFSO-RI Enabling Grids for E-sciencE NA2 Dissemination and Outreach Joanne Barnett, EGEE External Relations Officer, TERENA Secretariat.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
The medipix3 TSV project
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
CERN Scientific Information Service Open access to literature and data Joanne Yeomans (using Jens Vigen’s slides) Induction Course 30 th March 2006.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
How Will Work Be Assessed?
REPORTING THROUGH THE EMS
CallTower Implementation Process Overview
Identify and construct enlargements using fractional scale factors.
Year End Preparation June/July 2017.
REPORTING THROUGH THE EMS
Customer Online Ordering
Alternative process flows for reduction of steps
iKnow OSFC’s 1-stop Search tool
Sensor Wafer: Final Layout
Database requirements from ITk-Strips for DAQ loads
Micro-cooling devices for LHCb Velo CERN
2S module geometry updates Module positioning concepts
CERN & LAL contribution to AIDA2020 WP4 on interconnections: Pixel module integration using TSVs and direct laser soldering Malte Backhaus, Michael Campbell,
Multiple Documents Document Management Multiple Documents.
Scientific Panel Study Approval Process
Joint Research Centre (JRC) Product Bureau
European Statistical System Network on Culture (ESSnet Culture)
Purchase Order for Services
Important Information Before you Start
Presentation transcript:

Tom McMullen Week 3 25/2/2013 – 1/3/2013

LETI wafer thinning project flow Phase 1 IDProject NameOwnerDaysStartEnd 3-Feb10-Feb17-Feb24-Feb3-Mar10-Mar17-Mar24-Mar31-Mar5-Apr12-Apr19-Apr26-Apr 1.0Thin Wafer AssembliesT. McMullen01-Feb30-Sep Week 1Week 2Week 3Week 4Week 5Week 6Week 7Week 8Week PHASE 1 - Layout and mask production, first 2 wafers with microbumps delivered to AdvacamLETI - 3D101-Feb29-Mar LETI accpets CERN proposal 1.1.1Send gds to LETIT. McMullen51-Feb8-Feb Send 2 FEI4b wafers to LETIR. Bates51-Feb6-Feb Confirm step size on wafer and centre ofset variation on waferLETI51-Feb6-Feb Layout and mask productionLETI101-Feb11-Feb Deliverable 1: Microbumb gds files First 2 wafers with micro bumps delivered to AdvacamLETI4912-Feb2-Apr Deliverable 2: First 2 wafers with micro bumps delivered to Advacam Current Deliverable Target not met

Action List Phase 1 and 2 ActionWhatWhoWhenComment 4Top metal align key informationTMcM22/5/2003Alignment key config taken from FEI4 CAD – now with LETI 5CERN purcahsing info for STFCTMcM14/2/2013Confirmed to be ok by Richard 6Further funding for flip-chip processRbates\Cbuttar31/3/2013 Richard awaiting information back from Hienze regarding this 7Bow measurement set-upTMcM31/2/2013visit SMC and set up program for bow measurement 8Sensors for flip chippingAll31/3/2013Sensor availablilty for flip-chip process - Meeting rqd 9Assembly probe test solutionTMcM19/3/2013Pobe test solution for flip-chipped assemblies - yield maps 10FEI4B probe card and probe set-upRbates/TMcM19/3/2013FEI4B test solution for assembly testing yeild maps

Highlights and issues 1  Cash for flip-chip bonding We have the funding for the thinning work with LETI but will need further funding for the flip-chip process at Advacam Richard has contacted Heinz regarding this and awaiting feedback. Didier and Peppe have declined to contribute at this time as they have already submitted their proposals for the next 2 years We will need this further funding by the end of phase 1 (week 9 from Gant on previous slide) to test the LETI micro-bumps  Receipt of purchase CERN feedback on receipt of purchase prior to the end of March was not possible with a DAI. An invoice can be created using EDH and needs to be confirmed if this will suffice. Richard has confirmed with STFC that their will be no issues with a receipt of purchase prior to the end-of-March deadline  Top Metal layer gds information is required for the alignment scheme. Richard is trying to source this information but its painfully slow and holding up progress. Deliverable 1 has been missed due to this. LETI are still confident on meeting deliverable 2 provided we get this information ASAP. Alignment key configuration taken from FEI4 and ‘instanced’ into FEI4B. 120nm offset in y-axis, this is a little above 1% of the smallest CD of the alignment marks and should be well within alignment tolerance. Gds sent to LETI and awaiting information if it’s ok and final layout configuration.  Micro-bumps are designed and wafer mapping completed

Highlights and Issues 2  Meeting required to discuss sensor availability for the flip-chip process Amount of sensors for flip-chipping – good statistical analysis required for micro-bump yield. LETI input required We will need to resolve funding for the flip-chip process prior so we know how many we can process for the whole project  FEI4b Assembly testing FEI4b probe card required Test equipment/apparatus required Semi-auto testing solution required for assemblies

Alignment key proposal -Rectangle entourant le motif  alignement grossier -Alignement fin Croix / carré

Photos wafers

LETI wafer thinning project flow Phase 2 To be published in next report