Presentation is loading. Please wait.

Presentation is loading. Please wait.

Joint Research Centre (JRC) Product Bureau

Similar presentations


Presentation on theme: "Joint Research Centre (JRC) Product Bureau"— Presentation transcript:

1 Joint Research Centre (JRC) Product Bureau
State of play and next steps Bed Mattresses and Sanitary Products

2 EU Ecolabel criteria revision for Bed Mattresses
Timeline: Start of the project on criteria revision – Sep, 2011 1st AHWG Meeting – 23rd Feb, 2012 2nd AHWG Meeting – ? Deliverables: 1st consultation questionnaire – Sep, 2011 questionnaire for LCA info – Dec, 2011 Background Report and Proposal for Criteria Revision – Feb, 2012 Presentations from the 1st AHWG – Feb, 2012 Deadline for feedback: 19th March Available at:

3 EU Ecolabel criteria revision for Bed Mattresses
Key environmental impacts are related to Sourcing, production and use of components (further elements to be gathered) Regulation complicated but still under evaluation - Disposal of the product itself in landfill Regulation apparently feasible but still under evaluation - Energy issues associated with the storage and delivery of the Product Regulation apparently feasible and supported

4 EU Ecolabel criteria revision for Bed Mattresses
Scope and definition: - Scandinavian bed mattresses and Upholstered bed bases out… or in? - To be adsorbed by furniture? - Better definitions to be provided Existing criteria: Materials: hazardous substances, metal processing, wood Product: hazardous materials, durability, packaging Information appearing in the Ecolabel Main critical points for the criteria revision: 1. Environmental considerations on materials, product and final disposal – understanding what new elements to address 2. Limitation in the use of hazardous materials and substances – aligning with the horizontal approach on substances 3. Alignment with the EU Ecolabel criteria for textiles - Understanding what criteria to take on board

5 EU Ecolabel criteria development for Sanitary Products
Timeline: Start of the project on criteria revision – Dec, 2011 1st AHWG Meeting – week 24, 2012 ? Deliverables: Scoping document – Feb, 2011 Working documents – week 20, 2012 Deadline for feedback: 1st March Available at:

6 EU Ecolabel criteria development for Sanitary Products
Scope and definition: Proposed scope: Baby diapers Feminine sanitary protection products Adsorbent hygiene products for incontinence ??? 4. Breast pads ??? Others ???

7 Contact


Download ppt "Joint Research Centre (JRC) Product Bureau"

Similar presentations


Ads by Google