Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

4 th DataGRID Project Conference, Paris, 5 March 2002 Testbed Software Test Plan I. Mandjavidze on behalf of L. Bobelin – CS SI; F.Etienne, E. Fede – CPPM;
Management’s preliminary comments to the ERC Report.
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
A Methodology that is PROVEN PRACTICAL EFFECTIVELY INTEGRATED SCALABLE CUSTOMIZABLE.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Controls renovation WorkshopFE Software 1 Front-end software C.H.Sicard.
Copyright © 2004 Sherif Kamel Information Systems Planning Sherif Kamel The American University in Cairo.
The Issues of Budgetary Reform Unit 3. PFM Reform – Change Management Module 3.2. Preparing and managing a reform programme.
111 Notion of a Project Notes from OOSE Slides – a different textbook used in the past Read/review carefully and understand.
Object-Oriented Software Engineering Practical Software Development using UML and Java Chapter 1: Software and Software Engineering.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Object-Oriented Software Engineering Practical Software Development using UML and Java Chapter 1: Software and Software Engineering.
Stephane Deghaye (AB/CO) ATC/ABOC days.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
AGM-2011 On behalf of CO/FE F.Locci - December 15 th, 2011.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Me thodology for mo dern bu siness st atistics = Memobust Leon Willenborg (Statistics Netherlands)
Systems Development Life Cycle
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Debriefing of controls re-commissioning for injectors after LS1 TC 09 October 2014.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
CERN Raul Murillo Garcia BE-CO LS1 review – TE-EPC feedback BE-CO LS1 review TE-EPC feedback Raul Murillo Garcia on behalf of TE-EPC Daniel Calcoen Stephen.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
U.S. Grid Projects and Involvement in EGEE Ian Foster Argonne National Laboratory University of Chicago EGEE-LHC Town Meeting,
Jan 23rd, 2008M.Vanden Eynden on behalf of the AB-CO Group1 AB-CO MTTR & Spare Part Policy for the LHC Injectors, Experimental Areas & other Facilities.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
BE-CO Presentation FESA and O/S Support Post-ACCOR renovations until LS2 Front-End Platforms BE-BI TB, May 21 st, 2015 M.Vanden Eynden on behalf of BE-CO.
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Stephane Deghaye (AB/CO) The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
HLTC 28 th June Aim and expected results The aim of the workshop was: To create a CERN wide survey of all needs in the mentioned domain To collect.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
The OP Viewpoint on the Accelerator Complex Controls Renovation R. Steerenberg on behalf of the OP group Accelerator Complex Controls Renovation Workshop.
Follow-up to SFT Review (2009/2010) Priorities and Organization for 2011 and 2012.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
CS223: Software Engineering Lecture 32: Software Maintenance.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
PFM reform – change management Module 3.2 Preparing and managing a PFM reform programme 1.
Rob Connatser NSS Instrument Work Packages and XLPM.
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
Chapter 25 – Configuration Management 1Chapter 25 Configuration management.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
Software Development Module Code: CST 240 Chapter 6: Software Maintenance Al Khawarizmi International College, AL AIN, U.A.E Lecturer: Karamath Ateeq.
TK2023 Object-Oriented Software Engineering
Accelerator Controls Renovation Project “ACCOR”
“Self-Sustaining Innovation Ecosystems for European Leadership”
CONS and HL-LHC day Analysis of needs from BE-CO
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Status and Plans for InCA
Chapter 18 Maintaining Information Systems
Kickoff close-out Joerg Jaeckel, Mike Lamont, Claude Vallée.
Critical Factors in Managing Technology
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Drivers of Change Challenges and Consequences
Regional Operations Forum Setting the Stage
Presentation transcript:

Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop2 Agenda Purpose –Outline of the main technical and organizational motivations Scope – Outline of the technical work packages Summary

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop3 Agenda Purpose –Outline of the main technical and organizational motivations Scope – Outline of the technical work packages Summary

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop4 Purpose Organizational –The benefits of the co-operative LHC model –Time to end the PS Complex legacy situation –AD, CTF, REX ISOLDE Technical –Critical Front-end Hardware and Software situation –Application Software rationalisation

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop5 Purpose Organizational –The benefits of the co-operative LHC model –Time to end the PS Complex legacy situation –AD, CTF, REX ISOLDE Technical –Critical Front-end Hardware and Software situation –Application Software rationalisation

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop6 Purpose - Organizational The benefits of the co-operative LHC model –The organizational model used for the construction of the LHC control system is recognized as a solid basis in terms of: Budget, Planning, Field coordination, Responsibilities –The control system was built on the basis of agreements (CO3) and better balanced sharing of responsibilities between the EQ.Groups and CO CO provides core controls hardware reference platforms and modules CO provides core software frameworks (FESA) Eq.Groups develop their systems with these building blocks Eq.Groups have a first-line responsibility for their Front-ends, in particular for the software and its evolution –The exploitation responsibilities are clear, decisions and evolutions are made in common (CO3)

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop7 Purpose - Organizational Time to end the PS complex legacy situation –The PS Complex (1/2) The PS Complex control system was designed and operated under the responsibility of the “PS-CO” group The emergence of LHC brought another magnitude of controls complexity and diversity, making the PS-CO approach not applicable in the future The remaining number of PS-CO engineers in a position to fix or improve the current control system runs under the critical mass (loss of competence) Responsibilities for a number of systems is unclear

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop8 Purpose - Organizational Time to end the PS complex legacy situation –The PS Complex (2/2) Recent renovation of the application software layer highlighted severe shortcomings at the front-end level CO presents today a vision for renovation but a global strategy approved by all parties (EQ.Groups, OP, CO) is mandatory Current Budget evaluations for the PS controls infrastructure is difficult without this strategy Using the LHC co-operative model would improve the situation

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop9 Purpose - Organizational AD, CTF, REX ISOLDE Lots of unsupported technical solutions (external collaborations) Partially renovated but with PS-CO legacy solutions –same technical problems problems as for the PS complex –Same “centric” role of CO, as opposed to the LHC model Evolution on a “day-by-day” basis, making hardware procurement, software support and responsibilities unclear Declared as “lower priority” but in reality require a very high support effort from AB-CO The future evolution is only possible through a close collaboration and involvement of the EQ.Groups and CO Here again, using the LHC co-operative model would improve the situation

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop10 Purpose Organizational –The benefits of the co-operative LHC model –Time to end the PS Complex legacy situation –The case of AD, CTF, REX ISOLDE Technical –Critical Front-end Hardware and Software situation –Application Software rationalisation

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop11 Purpose - Technical Critical Front-end Hardware and Software Situation –Most of the low level control system Hardware infrastructure, in particular the front-end VMEBus processors and crates are running out of date: No commercial support, no possible evolutions, performance problems –Already some major impact on operations –Severe difficulties to deploy the LHC front-end software solutions (FESA) –Impossible to evolve the application software layer without a consistent renovation plan for the front-end part –New front-end platforms, including more “cost-effective” ones, are proposed by CO –Large Contracts have been prepared, approved by CERN Finance Committee and signed with European manufacturers (IT 3527 and IT 3557) –Orders for VMEBus processors should be placed in the coming weeks, as no new installations nor upgrades are possible anymore (only LHC spares available) More Details during the talk on « Front-End Hardware » by N.de Metz-Noblat

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop12 Purpose - Technical Critical Front-end Hardware and Software Situation –Most of the Front-End software (GM classes) is under “corrective maintenance” support ONLY by AB-CO –GM is abandoned and FESA has emerged, thanks to a very close collaboration with the Eq.Groups, as the unique RT software framework that will be supported –Full re-engineering of about 125 GM classes is out of reach by AB-CO only –A clear evaluation of the situation will be presented during this workshop More Details during the talk on « Front-End Software » by C.H.Sicard

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop13 Purpose - Technical Application Software Rationalisation –Reduce duplication of efforts Homogenise solutions accross Accelerators Reduce number of specific applications –Reduce maintenance cost Suppress Legacy PS applications –Improve performance Tackle performance, scalability and reliability problems experienced on PS complex More Details during the talk on « InCA » by S.Deghaye

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop14 Agenda Purpose –Outline of the main technical and organizational motivations Scope – Outline of the work packages Summary

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop15 Scope - Work Packages DOMAINResponsibility Material Budget Human Resources Front-End Hardware Platforms and Form Factors AB/CO++++ Generic Front-End Hardware Modules AB/CO++ FESA FrameworkAB/CON/A++ Front-End software (+ specific Hardware) ATB, BI, BT, CO, PO, RF,… ++++ InCA AB/CO AB/OP N/A++ Specific High Level ApplicationsAB/OPN/A++

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop16 Scope - Work Packages The aim of this workshop is to provide, for each work package: –General Description –Proposed Time Table (synchronized) –Material Budget –Resources

December 3rd, 2008M.Vanden Eynden - Accelerator Complex Controls Renovation Workshop17 Summary A solid co-operative model for developing Accelerator controls has been applied with success to the LHC and should be generalized to all machines The control system of the PS complex and other machines (AD, REX ISOLDE, CTF) requires urgent renovation from the technical perspective, as well as from the organizational point of view As it will take several years of efforts, a decision is needed rather soon Orders for VMEBus processors are urgent (IT-3527) AB-CO proposes a vision with estimates but a global strategy and organization must be defined with the support of the management