Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.

Slides:



Advertisements
Similar presentations
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Advertisements

Software Quality Assurance Plan
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Ernest Williams FAC November 2008 Control Systems Software Section 1 Controls System Installation Status Ernest Williams for Controls Department.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Hamid Shoaee Control System Installation 3/16/ Downtime Readiness Review Hamid Shoaee For LCLS Controls Group.
1 Mike Saleski 1 Safety Systems Configuration Control FAC 2009 Safety Systems Configuration Management E. Michael Saleski Control.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
E. M. Saleski FAC 11/11/08 Configuration Control of PPS FAC Review November 2008 E. Michael Saleski Controls Dept Safety.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Hamid Shoaee LCLS Facility Advisory Committee 20 April Plans for 2006 Installation April 20, 2006 Injector commissioning.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Organization & Integration with the rest of the lab, Accelerator.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
Release & Deployment ITIL Version 3
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Controls Organization Overview A Progress Report Hamid Shoaee.
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
From Research Prototype to Production
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
E.Matias Canadian Light Source. Where is Saskatoon?
Important informations
Software Configuration Management Lessons Learned Patrick Bong Safety Systems Group Stanford Linear Accelerator Center.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Ali Pabrai, CISSP, CSCS ecfirst, chairman & ceo Preparing for a HIPAA Security Audit.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Software QA Safety Systems at SLAC Enzo Carrone Controls Department – Safety Systems SLAC National Accelerator Laboratory.
1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Hamid Shoaee Control LCLS ARR Oct 31, LCLS Accelerator Readiness Review Control System for Injector Commissioning.
State of Georgia Release Management Training
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Project management Topic 8 Configuration Management.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
31, LCLS Maintenance Personnel and Procedures Paul Bellomo.
ESS Integrated Control System Software Core Components S.Gysin
Cryoplant Controls Installation
RF Systems and Controls for the LERF CM Tests
Accelerator Operations Department Readiness (Part 2)
Facility for Rare Isotope Beam (FRIB) PLC Control Systems Introduction
The ILC Control Work Packages
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
LTU/Undulator Installation Status
Electron Beam Systems ETC and Methodology
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
2007 Downtime Controls Installation
LTU/Undulator Installation Status
Control System Overview Hamid Shoaee LCLS Control System Manager
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Control System Personnel Linac & BC2 Controls progress
Control System Overview Hamid Shoaee LCLS Control System Manager
Presentation transcript:

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance Plan Hamid Shoaee

Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Management Safety Systems Engineering Support Electronics & Instrumentation Engineering Software, Networks, and Systems Controls Department Organization

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Department Organization

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department support of commissioning and operation Over 20 years of experience maintaining control systems (SLC, PEPII, etc.) Control Room has detailed, up-to-date list of subsystem responders. Controls hardware & software support are on- call. Invasive solutions are scheduled for “Repair” days if not immediately impacting program. Escalating call-in for items with immediate impact (stopping beam delivery).

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Recent Improvement “Controls Deputy” on rotating week-long shift in the control room, paralleling the physics Program Deputy: Primary conduit for all controls issues. Works with operations to get problems categorized and recorded in the maintenance reporting facility (CATER). Notifies section leads when critical problems arise. Present at all maintenance meetings.

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory The department covers all electronics and software areas Hardware: Timing, LLRF, BPMs Profile monitors, Video displays Vacuum, Collimators Movers, Scanners Toroids, Thermocouples Networks Crates, IOC CPUs Software: High-Level applications Networks and computer systems EPICS systems Infrastructure Logging Archiving Alarming Control room GUIs

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Specifically LCLS Timing Beamline Motion Laser Heater OTR Focusing Matlab-based Feedbacks Bunch Length Monitors Injection Laser Special RF Magnets Configurations MPS PPS BCS

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Documentation and Procedures Rack drawings and profiles Cable routing sheets database Electronic chassis schematic diagrams Manufacturer drawings and manuals Safety procedures and work authorization forms

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Rack Population Tracking System Building 24 assembly area

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory The readiness status of all controls racks are reviewed weekly (sheet on SharePoint)‏

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory From the list of devices to be installed… Develop racks layout & cable tray design Generate rack profiles for electronics modules Identify DC & I&C cabling requirements & document in CAPTAR Produce installation bid package from CAPTAR and tray designs Generate installation bid package & award contract Procure trays, cables, connectors, etc. Install cable plant and terminate to beam line components

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 12

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 13 Test Plan and Risk Analysis

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Formal Power up procedures were developed for each controls sub- system to ensure safe turn-on

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Department Practices LCLS Work Authorization AHA Equipment Lockout Procedures Work Authorizations for non-standard work Checkout and commissioning carried out jointly with operations and physicists User interfaces follow best engineering practices Software version controls Software documentation for users and developers Safety systems follow a rigorous set of procedures in all phases of work

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Safety Systems organization ensures independence of Q/C from engineering

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Safety Systems Organizational changes since the last LCLS ARR PPS and BCS Systems combined into a single Section under new management (E. Carrone) Full-time QC Group Leader (M. Saleski) Manages the Review & change order Processes Full-time Documentation Manager (S. Starner). Documentation compliant with DOE Order 414.1C and ISO 9001 New “Backup” PPS Engineer undergoing training to provide additional PPS System Expertise. New Test Leaders have been trained during past IATs. A training tracking procedure (and a registry) is in place.

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Documentation Control A single on-line repository is available for all released documents. Formal Documentation Control is in place. Measures taken to regulate the Preparation, Change, Withdrawal, Review, Approval, Release, Distribution, Access, Availability, Storage, Disposal of documents. Document management Plan, Document Change Control Procedure, design Review Plan, Drawing Management Procedure, Engineering Change Order Procedure.

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Configuration Management Documentation Document Management Plan Document Change Control Procedure Document Change Order Design Review Plan Software Configuration Management Engineering Change Order Procedure Engineering Change Order Drawing Management Procedure

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Internal Design Review Process Relevant SOs informed of projects and intended review scope early in process. Process is tracked with ECO. ECO close-out is contingent on readiness of ‘as-built’ drawings, testing procedures, etc.

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Software Configuration Management Procedure PPS Software is stored in a dedicated PPS repository. Released software always has “N.0.0” version tag. Documented software bench testing is performed prior to deployment.

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Software Configuration Management Support Software versions are checked during annual certification. Written procedures exist for extracting PPS code from CVS and for uploading it to PLCs. A documented training program tracks personnel PLC qualifications in the Section.

Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Conclusions Controls Department is prepared and ready to support and to maintain the LCLS facility