1 E. Carrone 1 FEE PPS Status FAC FEE PPS Status Enzo Carrone June 8, 2009
2 E. Carrone 2 FEE PPS Status FAC 2 PPS FEE Schedule
3 E. Carrone 3 FEE PPS Status FAC FEE/NEH Schedule
4 E. Carrone 4 FEE PPS Status FAC Critical Path “Enhanced” QA/QC activities
5 E. Carrone 5 FEE PPS Status FAC 5 FEE PPS Cold Checkout Cold Checkout Verifies Hardware and Cable Plant is installed and wired correctly Verifies No Ground Shorts in the Cable Plant EEIP Hardware and Racks 95% Complete
6 E. Carrone 6 FEE PPS Status FAC 6 FEE PPS Hot Checkout Hot Checkout Verifies Functionality of Hardware, Devices, and PLCs Hi-Pot Cable Plant Invasive to LCLS Undulator Complex Operations (2-3 Hours)
7 E. Carrone 7 FEE PPS Status FAC 7 PPS Review Status Final Design Review #2 (April 22, 2009) Initial Acceptance Test Review Internal Review (May 15, 2009) - Complete External Review (near completion)
8 E. Carrone 8 FEE PPS Status FAC 8 FEE Initial Acceptance Test Schedule IAT Validation June 17 – June 19 Invasive to Upstream LCLS Operations IAT Certification June 22 - June 26 Invasive to Upstream LCLS Operations