1 E. Carrone 1 FEE PPS Status FAC FEE PPS Status Enzo Carrone June 8, 2009.

Slides:



Advertisements
Similar presentations
Status Report Presentation. Is this initiative ahead of schedule (why – explain)? Is this initiative on schedule (why – explain)? Is this initiative.
Advertisements

Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
LCLS Beam Parameters, Status and Run Schedule Rick Iverson for the LCLS team 1 R. Iverson ESTB Workshop SLAC, March 2011.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Stephen Norum LCLS FAC April 16, LCLS Machine Protection System Overview Interim MPS Full LCLS MPS Design Schedule.
Ernest Williams FAC November 2008 Control Systems Software Section 1 Controls System Installation Status Ernest Williams for Controls Department.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
K. Long, 13 June, 2015  Target K. Long, Friday, 24 th April 2009.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
1 Arturo Alarcon 1 Undulator Controls Status FAC Undulator Controls Status Arturo Alarcon June 9, 2009.
Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 1 BC2/Linac Installation Status & Schedule Jose Chan.
Richard M. Boyce FAC April 16, LCLS Installation & Planning Integration process – IMT 2007 Installation Planning BTH.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
Bob Law FAC Review April 14, 2007 LCLS Conventional Facilities Construction Field Change Orders Bob Law.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Michael Scharfenstein FAC October 30, LCLS CONSTRUCTION SAFETY Michael Scharfenstein.
E. Michael Saleski PPS and April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
NEH ARR PPS 11AUG09 LCLS NEH Hutch Protection System E. Michael Saleski; QC Manager Michael G. Harms, Patrick Bong, James Murphy, Alan Hill; Engineers.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
Project Status Update Mark Petree LCLS Self Seeding Status: Management put it on hold. – Preliminary conceptual design completed – Interference.
T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 1 LCLS Undulator Undulator Network.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Communications & Computer Networks Resource Notes - Network Hardware
1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
Friday Field Stables is a 5 star full, part and training livery yard near Sittingbourne, Kent, with excellent facilities for both horse and owner. A small,
GeoMesh Blockchain Networking - Slide Presentation
Undulator System Installation
LTU/Undulator Installation Status
Peripheral Devices
Communications & Computer Networks Resource Notes - Network Hardware
Magnet PS Controls Hardware Status
Undulator Vacuum System
Testing Plan and Status
e-Beams Systems Update
Test Process “V” Diagram
Undulator Vacuum System
Conventional Facilities Status
LTU/Undulator Installation Status
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS e- Beams Systems Manager
Presentation transcript:

1 E. Carrone 1 FEE PPS Status FAC FEE PPS Status Enzo Carrone June 8, 2009

2 E. Carrone 2 FEE PPS Status FAC 2 PPS FEE Schedule

3 E. Carrone 3 FEE PPS Status FAC FEE/NEH Schedule

4 E. Carrone 4 FEE PPS Status FAC Critical Path “Enhanced” QA/QC activities

5 E. Carrone 5 FEE PPS Status FAC 5 FEE PPS Cold Checkout Cold Checkout Verifies Hardware and Cable Plant is installed and wired correctly Verifies No Ground Shorts in the Cable Plant EEIP Hardware and Racks 95% Complete

6 E. Carrone 6 FEE PPS Status FAC 6 FEE PPS Hot Checkout Hot Checkout Verifies Functionality of Hardware, Devices, and PLCs Hi-Pot Cable Plant Invasive to LCLS Undulator Complex Operations (2-3 Hours)

7 E. Carrone 7 FEE PPS Status FAC 7 PPS Review Status Final Design Review #2 (April 22, 2009) Initial Acceptance Test Review Internal Review (May 15, 2009) - Complete External Review (near completion)

8 E. Carrone 8 FEE PPS Status FAC 8 FEE Initial Acceptance Test Schedule IAT Validation June 17 – June 19 Invasive to Upstream LCLS Operations IAT Certification June 22 - June 26 Invasive to Upstream LCLS Operations