1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

“Aggressive schedule” seen by MJPB (just for WP1) (incl. VAT) Needed to be aggressive to meet 2005/6 shutdown….
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
1 MICE phase I - Project Status Richard Apsimon (Project Manager) & Andy Nichols (Technical Coordinator) … with considerable help from Ken Long! MICE Video.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
Paul drumm; 3rd December 2004; AFC MM 1 Why? Goal: Ultimate (CCLRC defined) Safety & Design Review –How do we get there? We need a Process –What is needed?
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
1 paul drumm; ; FAC-PR MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
CMPB Alain Blondel 14 April STATUS OF MICE.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Project manager report paul drumm CM16 October 2006.
K. Long, 14 October 2003 MICE-UK: progress report Progress: WP1: B&I: Target u/g (Sheffield) … PD Focus coil assembly Spectrometer Software Issues: Scientific.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
1 pd, PAC 2005 MICE Muon Ionisation Cooling Experiment Paul Drumm Rutherford Appleton Laboratory 19 th May 2005.
K. Long, 10 October 2015 Project Manager’s report Status/progress since CM18 Looking forward Organisation Conclusions.
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Design & Safety Review Work Group meeting 10 March 2005 Progress update Wing Lau, Oxford.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
MICE CM31 Schedule summary
Paul Drumm VC 14th September 2005
10/month is the present production rate 2 FTE + sporadic contributions
Particle ID Diagnostics in the MICE Beamline
Daresbury ESS In-Kind Contributions
Presentation transcript:

1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance is important; purchases for TOF prototype may soon start with financial help of UniGeneva –Inaugurated Design & Safety Review (Wing…) Beam line first pass… Tracker first pass… PID starting… –DAQ group – Edda… KEK test will be important model for tracker & DAQ –Notice of available height in entry to MICE hall – 3.2m module width & height limit (

2 MICE Project Report, paul drumm, 9 march 2005 Project news –Tracker prototype is “almost ready” for assembly –RF equipment is being stripped down Burle tubes sent to ISIS for testing (looks hopeful) –PSI solenoid MoU is ready and can be signed as soon as official announcement is made finalising shipping arrangements with PSI Environment agency case for importation to be made Notice to tender has gone out for the cryogenics (OJEU + response) –Sorting out resources for beam lines tasks Analysis so far: –Reasonable amount of time to do the work for the “conventional” elements –Schedule: Long delivery on cryogenics for decay solenoid Installation before & during the 2006 long shutdown –Late 2006

3 MICE Project Report, paul drumm, 9 march 2005 Schematic Schedule: AMJJASONDJFM.. AMJJASONDJFM ? Task Shutdown Beam line Design/Procure Muon Solenoid Import/Deliver/install Rail system Shielding Cryo Tender/Deliver/install Installation Pre-shutdown Shutdown Post-shutdown Beam Available? 2005/62006/7 Opportunities for a target test - In negotiation We are here! review

4 MICE Project Report, paul drumm, 9 march 2005 UK Financial news –RCUK, PPARC & CCLRC have all agreed funding for MICE phase 1 –Waiting for formal approval: back to OST for final approval and a ministerial announcement (still not done-deal) –If all is well hope to have funds by beginning of FY05 (April) for two years US news ?