Presentation is loading. Please wait.

Presentation is loading. Please wait.

WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.

Similar presentations


Presentation on theme: "WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology."— Presentation transcript:

1 WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology –Need to examine installation, integration & interface issues

2 Civil Eng Cryo. System Beam DAQ ECAL TOF …. PID H System RF System tracker Solenoid Absorber & Coils CHKov Coils etc Detectors Coupling coil Cavity & Coil Tracker Module MICE Integration Infrastructure

3 WBS Scheme MICE –MICE modules –Integration of Experiment –Integration into infrastructure

4 WBS Scheme MICE Modules 1 Beam & Infrastructure 2 RF Power System 3 Absorber & Focus Coil Module 4 Cavity & Coupling Coil Module 4.1 Cavity 4.1.1 Specification 4.1.2 Design 4.1.3 Tender 4.1.4 Construction 4.1.5 Acceptance Tests 4.1.5.1 Preparation 4.1.5.2 Tests 4.1.6 Completion – Mile Stone 4.2 Coupling Coil 4.3 RF Power Interface 4.4 Installation & Interface 5 Detectors & Measurement

5 WBS Information At the higher levels: –Break the work into its major components At the intermediate level –Break the components down into logical components/steps At the lowest level: –Identify a task –.. who will do the work – names – skills –.. how much work is needed & how long it will take –.. how much the work will cost Cost of staff Cost of materials What other resources are needed (particularly installation) Milestones

6 Work package Managers Proposal –Integration of MICE Experiment (EB) –Integration of MICE into Infrastructure (II) –MICE Modules Beam & I (II) RF (RC) A&FC (MZ) C&CC&RFI(DL) D&M (AB)

7 Responsibilities –Delegate –Get & monitor - time & cost schedules –the module integration happen –Liaise - the module to module interface –Liaise - the integration in the hall


Download ppt "WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology."

Similar presentations


Ads by Google