Presentation is loading. Please wait.

Presentation is loading. Please wait.

PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.

Similar presentations


Presentation on theme: "PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power."— Presentation transcript:

1 PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power supply Control system –Seek help for installation at a later stage PSI have the experience Augments UK installation effort (for free) –Ownership status of equipment Disposal issues MoU between CCLRC & PSI ?

2

3 ASTeC Discussions with ASTeC RF group Will take over in next 6 mo overlap Equipment form LBNL –Ship to DL –Strip down –Technical assessment –Plan for a test stand at DL

4 Shutdown work plan Prior: –Contract to cut hole (KP to sign job order) –ISIS Synchrotron Beam Components –Beam plug (concrete filled steel tube) During cool down period: –Clear MICE side of wall –Tent and prepare During: –Clear Synchrotron side of wall –Tent and prepare –Pilot hole –Circular aperture –Clear up Post: –Install plug –Reinstate shielding

5 Shutdown Planning