1 UKNF/MICE OsC PM report Summary assessment of MICE Risks, pressures and worries Project management Electrical substation, accommodation Redefining the.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
1 UKNF/MICE Oversight Committee Open session Integration of the MICE project Background & local history Progress since 2007 Schedule & planning considerations.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Board Schedule and milestones Reconstructing the schedule Present status Monitoring and feedback Key schedule drivers and concerns Andy.
1 Schedule Discussion Background & aims Major milestones & drivers Summary of important dates Project risks MICE CM26, 24-27th March, 2010.
Project Managers Report Video Conference 172 Roy Preece 11 th December 2014.
1 MICE-UKNF Oversight Committee MICE Project Manager Report Contents: New schedule and its implications Preparations for Steps II & III Spectrometer solenoids.
1 MICE CM28 STEP III or STEP IV? – some practicalities Andy Nichols/Tim Hayler, STFC 4 th October 2010 Considerations Step II Step III Step IV Conclusions.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
1 PM report International & UK programmes Overview Reconstructing the schedule The UK Project Management team Progress with major subsystems Substation.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
Project manager report paul drumm CM16 October 2006.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
1 MICE CMPB Contents: Progress to date Project management things Plans for the May shutdown Steps towards Phase Two Problems and open issues summary Andy.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
1 MICE MPB/RLSR Integration of Step IV Readiness of the major subsystems Installation sequence and schedule considerations Logistics, staffing and local.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 MICE PM Report Outcome of Reviews held at CM22 –Motivation for holding them –Outcomes & actions –Observations & follow-ups MICE Video Conference, 20.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
1 PM report Schedule comment Coupling magnets Major staffing concerns Andy Nichols, STFC, UKNF/MICE PSAG,
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
1 MICE CM27 PM Report Re-defining the UK project this FY Schedule things Apologies and accommodation Andy Nichols, STFC 7 th July, 2010.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 MICE PM report – status of Phase II Target update Spectrometer solenoid FC & coupling coils Schedule considerations Project accommodation & management.
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 MICE CM27 Engineering integration Andy Nichols, STFC 9 th July, 2010.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
Reported by Ron Prwivo for Ian Robson. Overview Response to Recommendations from the RLSR of November 2014 – very good, RF staffing remains an issue Very.
MICE CM28 Engineering Session Summary (On behalf of Wing)
Status of the MICE Construction Project
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

1 UKNF/MICE OsC PM report Summary assessment of MICE Risks, pressures and worries Project management Electrical substation, accommodation Redefining the UK project Andy Nichols, STFC, 22nd June, 2010

2 Present top-level MICE schedule Agreed by iMICE – only reviewed at Collaboration Meetings This version – March, 2010 Credibility of this schedule in some doubt, discussed later......

General progress UK has been ready for Steps II & III for some months now Decay solenoid has just emerged from painful 8K hour service – but now powered to full current Running for Step I commences this week Online (ISIS) target continues to run very well Offline target project (T2r & T3) making good progress Dust catcher sorted out Magnetic/mechanical axes mismatch understood and on way to being corrected Offline-online programme should resume during/after August shutdown First planes of EMR due from UNIGE at end July, 2010, but Step I data collection will take priority PPS is in final stages – implementation by August

General progress UK project was geared (in good faith) towards arrival of spectrometer magnet #1 in mid-May, 2010 and #2 six months later Everything is ready to integrate Steps II & III Problems with spectrometer magnets mean possible delays of min one year Technical/organisational difficulties at ICST/Berkeley still largely unresolved, re coupling coil magnets Presently we cannot predict dates for Steps II onwards Radical change in engineering culture required MICE is at its most vulnerable since

Risks, pressures and worries MICE top level schedule is critically dependent on two out- of-control subsystems This really is our only serious worry Not clear the US collaboration is staffed at the right level Or that QA and design and manufacturing control is rigorous Personal view is that another organisation must step in and apply an ISO 9001 based approach from ground up FNAL have made a critique of the spectrometer magnet project – iMICE and solenoid review committee await their report UK might be able to influence, given successful Mississippi 1.6M$ MRI grant for RF goods Could buy our way into the collaboration to the tune of 1.6M$ as UK now relieved of RF stuff But unfortunately there’s much more to this problem than money

Risks, pressures and worries The foregoing has had a negative effect on the domestic MICE team Motivation of the installation and design team has suffered Vital that we hold the team together Hope that re-definition of UK activities works – see later 6

Project Management Chris Bulloch of Magna Parva is now well established: Visits once a week Chairs weekly cost & schedule review meeting Has produced affordable costed project plan for FY10/11 Schedule/milestones table substantially ready Roy Preece of PPD will take over from Chris later this year Roy has taken SSC Oracle course for Project Managers Need to work out a way of importing UK methodology to international project – will be floated at CM27 7

Electrical substation progress The problem: The electrical supply in R5.2, the MICE Hall, needs to be upgraded to 2MVA, certainly to run at Step IV and probably at Step III Most of the power is required for CCR compressors, latest predictions are (5+1)x2 for spectrometer solenoids and 3x2 for coupling coils The present layout in R5.2 gives 1.25MVA and is based on fifty-year old equipment that has not been used to full capacity for many years The ingoing cable to R5.2 has adequate capacity and does not require any work Historically, this has been treated as a host-lab contribution and has never appeared MICE’s costed plan But we understand the need for a discussion 8

Schedules and costs summary 9 VersionCapital (K£)Effort (K£) BPG BPG BPG DL Note, costs are based on reasonably detailed effort estimates and Budget estimates from manufacturers Detailed costing will be re-visited when sufficient guidance on what plan to follow Is received – a lot of work otherwise, for which we do not have funding All the schemes depend on major bought out components that have lead times of 8-18 months – this really defines the schedule, again no detail schedule Planning will be done until chosen route identified MICE’s schedule for Step III is (very) arguably Q3-4, 2011 So we should aim for that

Latest news Met with STFC Management the other day More detailed costing of BPG1 requested, also assessment of development potential Description of costed risks of DL1 scheme also requested – the cheapest, but not necessarily best value solution Meet again on 8 th July MICE hopes to be pushed in the right direction on that day! MICE considers it unacceptable that the cost should come from project funds If we are forced to take the cheapest option of using the existing old infrastructure: Major risk that it won’t work on the day Preventing our collaborators’ equipment from working Would make STFC look pretty bad 10

Project accommodation Some success recently: –Have moved into half of R9 –Work on compressor supports and CCR hose spools underway there –Has already proved useful as base to work in parallel when MICE is running in R5.2 –Plans for simple 12 tonne A-frame and rails underway –Negotiations for rest of building continue –Not on critical path anymore, but will keep up pressure 11

Re-defining the UK project Steps II & III are delayed for at least one year UK installation team and infrastructure construction were very carefully geared towards spectrometer solenoid #1 arriving at May 15 th We want to hold the team together, so: Advance work on the LH2 system – See Matt’s talk in open session Hydride bed Vent system Civil engineering Pipe/valve & gas panel work Ongoing safety case RF power work Design of waveguide/power/cooling infrastructure Hands on work at DL with RAL team – second amplifier Project plan has been re-costed and is affordable 12

13 LH2 system is at advanced design stage major components are ordered hope to have enough detail done to start hands on work mid-late July much work to do/parts to order The LH2 system should be viewed as the major UK undertaking for FY10/11 – should not be underestimated – and this is only The R&D phase

RF power work Separates into three discrete activities: 1.Powering the first amplifier at DL –Electrical support work is making good progress at DL 2. Stripping and reconditioning the second LBL amplifier at DL –Two RAL (Merit-Merrell) installation staff can work at DL to support DL technicians. Exploratory meeting scheduled for th July – plenty of space at DL! Can also help with pre- assembly of two CERN amplifiers 3.Advancing work on RF power hardware design in R5.2 –Andy Moss and Tim Hayler have begun consulting, for this year it’s primarily a design exercise – need meeting with US on how to interact with US MRI grant 14