Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 1 BC2/Linac Installation Status & Schedule Jose Chan.

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

Kathleen Ratcliffe BC2/Linac Installation April 16, BC2 / Linac Installation Coordination Kathleen.
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
RF Waveguide & Structures Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
Jose Chan and Kathleen Ratcliffe FAC Review- LTU/DUMP installation Status & 6/16/08 1 Linac Installation Status, Schedule.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
Kathleen Ratcliffe LTU Installation October 30, LTU Installation Coordination Kathleen Ratcliffe.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Richard M. Boyce FAC April 16, LCLS Installation & Planning Integration process – IMT 2007 Installation Planning BTH.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Safety Oversight for SLAC Accelerator Department Operations
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Bill White Laser Installation and April 20, Laser Installation and Commissioning April 20, 2006 Procedures.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
Jose Chan FAC Review- Injector Laser Heater 6/16/08 1 Injector Laser Heater Undulator Jose Chan.
E. Michael Saleski PPS and April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Baseline Change Request BCR Title: EBD New 6 Ton Bridge Crane Installation BCR #: N/A Presenter’s Name: Robert Law CCB Presentation Date:
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Jose Chan 2007 Downtime PMOG 5/16/ Downtime PMOG Review Jose Chan.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
Accelerator Readiness Review October 31, 2006
Shielding Design for LCLS Injector Operation – Phase one
CBETA Technical Review
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
2K CB FDR Overview:  Agenda, Charge, Review Process
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
e-Beams Systems Update
Installation of Photon Beam Transport to FEH
Electron Beam Systems ETC and Methodology
Injector / Linac Installation Current Status
Shutdown Planning & Installation Schedule
LCLS Personnel Protection System and Beam Containment System
E-Beams Systems Manager
LCLS Injector System Overview D. H
Installation Status & Operational Readiness Process
DOE Review of the LCLS Project October 2006
Electron Beam Systems ETC and Methodology
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
BC2 / Linac Installation Coordination Kathleen Ratcliffe
LINAC System Engineering / Design Status C.E. Rago
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS e- Beams Systems Manager
Injector/Linac RF Status
Presentation transcript:

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 1 BC2/Linac Installation Status & Schedule Jose Chan

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 2 Objective Linac system for 2007 downtime installations Starts in September 4, 2007 thru December 3, weeks minus 2 weeks for PPS checkout and few days of power outages in sectors Divided in three areas L2 – sector 21 to sector 24 Modifying girders 24-3,4,5 & 6 BC2 – last 3 girders of sector 24 Modifying girders 24-7, 8 & 9 L3- sectors 25 to 30 Modifying girders 25-1,2,3 & 9; 27-6 & 9; 28-5 & 7; 29-4 De-scoped four wire scanners for sector 24

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 3 Objective BC2 Sector 26-7, 8 & 9: removing all components and DLWG from sectors 26-7, 8 & 9 to make room for BC2 L3 Sector 25-1: removing all NPI components from exit of 25-1b DLWG to upstream of Q25701 and install two DLWG from sector 24; reconfigure waveguides to feed all 4 accelerators Sector 25-2: removing 25-2d DLWG and installing a toroid and T-Cav. (from sector 29-4d) Connect waveguide from penetration penetration (KLY 24-8) to sector 25-2 transverse cavity

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 4 Objective L3 (cont.) Sector 25-3: removing 25-3d DLWG and installing a X-Kicker Magnet Sector 25-9: removing all components and install OTR TCAV Sector 27-6: removing 27-6d DLWG and install wire scanner from sector 27-9 Sector 27-9: installing drift tube Sector 28-5: removing 25-5d drift and wire scanner; install DLWG from 28-7d and reconfigure waveguides Sector 28-7: removing 28-7d DLWG and install wire scanner from 28-5d Sector 29-4: removing 29-4d DLWG and install drift section and movable collimator Water work: redistribute water to accelerators, magnet water and transverse cavity water

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 5 Schedule P3 downtime schedule P3 Installation Schedule is being updated to integrate with other installation schedulesP3 Installation Schedule Using Microsoft Project to track status, we’ll be tracking design and fabrications and kit assemblies for installation Design to Installation ScheduleDesign to Installation Schedule MFD will staff up two shifts, four crews for 2007 LCLS installation LCLS 2007 downtime planning schedule Ponciano’s cable installation plan Cable Installation ScheduleCable Installation Schedule Meetings Bi-weekly meeting with MFD to discuss 2007 downtime installation status Weekly meeting with MDF to discuss parts status Weekly meeting with engineers and designers to discuss design schedule and issues Weekly meeting with cable plant engineers to discuss 2007 cable installation Weekly 2007 installation meeting

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 6 STATUS DESCRIPTIONDESIGNCOMPONENT L2WIRE SCANNERDONEMFD BC2QEDONERFI BC2QM21DONERFI BC2IMBC 21DONERFI BC2BX2 FAB in EVERSON TESLA (6/30/07) BC2CQDONERFI BC2BPMS21DONERFI BC2CEDONEIN FINAL ASSY (6/21/07) BC2OTR21DONERFI BC2CERAMIC GAPCOMMERCIAL order in May ‘07 BC2BL21 (BL11?)DONE submit input to MFD in April ‘07 BC2BPMDONEIN FINAL ASSY (5/7/07) L3TOROID (IMBC20) RFI L3T-CAVDONERFI-LINAC L3WAVEGUIDEDONEMFD L3BXKIKIN DESIGN submit input to MFD in May’07 L3OTR T-CAVDONE RFI – except optics L3WIRE SCANNERSDONERFI-LINAC L3MOVABLE COLLIMATORDONERFI-LINAC L3DLWGSDONERFI-LINAC

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 7 Documentation Status BC2 Status Completed PDR on 12/14/07 Design is 70% complete FDR- in April & May April 2007, BC2 Support Tables Installation 2 May 2007, BC2 Vacuum Chamber Installation 9 May 2007, BC2 Vacuum Supports Installation 23 May 2007, BC2 Magnet and Support Installation Drift chambers in fabrication Everson Tesla is fabricating bend magnets Support stands released to fabrication

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 8 Documentation Status (BC2)

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 9 Documentation Status (BC2) End Start Mid

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 10 Documentation Status (BC2) BC2 installation drawings Supports InstallationVacuum Chamber Installation

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 11 Documentation Status (L3) L3 Status Completed PDR on 12/19/2006 FDR in May Completed preliminary installation drawings Completed all waveguide designs for Linac and request have been submitted to MFD (except long waveguides which were made in 2006) Kicker Magnet in design, identified commercial ceramic chamber, will order magnet in May

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 12 Documentation Status (L3)

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 13 Documentation Status (L3) Typical installation drawings (sector 25-2)

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 14 Product Assurance & Safety May require lead shielding around BC2 collimator Using existing shielding in sector 29-4 for the movable collimator Hoisting & Rigging bend magnets ( lbs) in BC2 Hoisting and rigging for other components (>40 lbs) are similar to 2006 installation Completed seismic calculations for BC2 supports, also a peer reviewed Magnets will be reviewed by electrical safety officer

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 15 Product Assurance & Safety Following safety documents are required prior to installation or operation Safety Overview Approval Penetration permits Work authorization approval from LCLS and AD Earthquake approvals Building inspection approvals Electric safety approvals RP approvals Non-ionizing approvals

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 16 Issues & Concerns Presented 2007 Installation Readiness Review in March Committee’s concerns If the linac installation tasks identified as “low priority” are not implemented then the maximum achievable energy from the Linac will be reduced, this may affect non-LCLS programs. This will also limit or delay the commissioning of systems through BC2 Readiness of hardware needs to be tracked to ensure availability by the downtime. Components like the kicker magnet, whose design is not yet complete, has no fabrication schedule input by MFD, and the ceramic chamber may have a long lead time. Pre-installation readiness and component testing should be a high priority to reduce in-field interferences. Space for BC-2 mock-up and testing could help identify technical issues before devices are installed in the tunnel. Scope definition is vital to a successful installation and the work required for the water system and BSY was not clear. Develop a clear and concise plan for the downtime work. Integrated schedule is required to determine if scope of work can meet the downtime constraints

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 17 Issues & Concerns Engineers and coordinators Some of mechanical engineers are still involved in commissioning of LCLS injector system Depend our commissioning success, if does not go well then is likely more resources brought back into injector L2 De-scoping wire scanners “will impact the commissioning significantly - P. Emma” BC2 design New articulation and support designs Not enough time or space to test completed installation assembly in the lab. Plan to test sub-assembly in building 26. Bend magnets are substantial larger than BC1 bend magnets L3 design Designs for BXKIK and OTR-TCav not completed

Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 18 Issues & Concerns 2007 downtime installations 2006 commissioning encountered a few problems with diagnostic components 2007 new components will be verified and signed off by design engineer, control engineer, alignment group and physicist before installation Post installation sign off 2007 downtime 10 weeks vs downtime 17 weeks Reconfiguring 13 Linac girders vs 3 in 2006 More waveguides in Linac housing Longer distance from equipment lowered down to installation areas Davis Bacon Linac installations maybe competing with LTU installations Water work less than 2006 installation Hardware and cable installations co-habitat in same area Not much time for control to check out hardware