Presentation is loading. Please wait.

Presentation is loading. Please wait.

Bill White Laser Installation and April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures.

Similar presentations


Presentation on theme: "Bill White Laser Installation and April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures."— Presentation transcript:

1 Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures and Definitions Safety Laser Installation Laser commissioning Injector commissioning

2 Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 2 Definitions and Procedures Pre-Installation Cables Tables Table Covers Racks LSS hardware Cooling Water Infrastructure Responsibility: Kathleen Ratcliffe Laser Installation Temporary SOP Thales on Site Verify specs Training Responsibility: Laser Group Laser Commissioning SOP Characterization Integration Beam Transport Virtual Cathode Responsibility: Laser Group Laser Operation Commissioning Gun Characterization Integration Responsibility: Laser Group IRR CRR ARR Departmental Reviews that follow safety committee and technical reviews: Work Authorization

3 Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 3 Safety Reviews SOC on Feb 22 Laser Safety Committee Temporary SOP SOP Electrical Safety Committee Thales acceptance visit May 15 Earthquake Safety Comm. Tables – done Covers – in process

4 Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 4 Technical Reviews / Milestones Laser Design Review at Thales – Oct 18-19 Progress Review Jan 27 Bi-weekly phone conferences to track progress Transport system FDR - Feb 22 Parts are in procurement Timing Workshop with LBNL – March 10 LLNL Progress Review – April 5 Parts are in procurement Spatial shaping characterization complete Going with Newport shaper Streak Camera Install at LLNL – April 19 Will be used to further characterize LLNL shaping work Laser Acceptance Review – May 15 Milestone 3 TG FROG Installed – End of May PDR for Light path to streak camera – Oct 06 UV on Photocathode – Dec 06

5 Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 5 SafetyReviews PDR Laser Safety System Dec 16, 2005 FDR Laser Safety System April 12 LSC review of Temporary SOP May 2-6, 2006 LSC review of SOP May 30, 2006 Installation Readiness Review for drive laser May 22, 2006 Commissioning Readiness Review for drive laser June 22, 2006 Earthquake review of table enclosures May 1, 2006 Electrical safety review of laser May 15, 2006

6 Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 6 Definitions and Procedures Pre-Installation Cables Tables Table Covers Racks LSS hardware Cooling Water Infrastructure Responsibility: Kathleen Ratcliffe Laser Installation Temporary SOP Thales on Site Verify specs Training Responsibility: Laser Group Laser Commissioning SOP Characterization Integration Beam Transport Virtual Cathode Responsibility: Laser Group Laser Operation Commissioning Gun Characterization Integration Responsibility: Laser Group IRR CRR ARR

7 Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 7 Pre-Installation

8 Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 8 Installation

9 Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 9 Laser Commissioning

10 Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 10 Laser Commissioning

11 Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 11 Issues CF and pre-install is slipping – 1 month Manpower WBS for Commissioning 1040 hrs optical engineer (6 months) 1000 hrs optical tech (5.75 months) 440 hrs physicist (11 weeks) Working with Eric on pre-ops needs Begin in June with Installation through light on cathode Dec 1 (6 months) Laser commissioning will continue beyond Dec1 Multiple Shifts will begin Dec 1 We need to start posting positions 4 Technician/Operator level by Dec 1 Eng/Phys level by Dec

12 Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 12 Issues Interference Virtual Cathode calibration will require very tight coordination with GTL install Downtime Installation through roof hatch Ongoing commissioning beyond December will require close coordination – Paul’s Commissioning schedule

13 Bill White Laser Installation and Commissioningb.white@slac.stanford.edu April 20, 2006 13 END


Download ppt "Bill White Laser Installation and April 20, 2006 1 Laser Installation and Commissioning April 20, 2006 Procedures."

Similar presentations


Ads by Google