Spallation Neutron Source Safety Program Overview

Slides:



Advertisements
Similar presentations
SNS Experimental FacilitiesOak Ridge Target Systems for the Spallation Neutron Source Presented by John R. Haines at the High-Power Targetry for Future.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
CONTROL OF HAZARDOUS ENERGY “LOCKOUT/TAGOUT” (LOTO)
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
Take 5 for Safety E. Lessard May 5, LANL Electrical Accident May 3, 2015  LOS ALAMOS, N.M. —Los Alamos National Laboratory workers were injured.
FIRE PREVENTION AND SAFETY PRACTICES Health Science.
Experimental Facilities DivisionORNL - SNS June 22, 2004 SNS Update – Team Building Steve Miller June 22, 2004 DANSE Meeting at Caltech.
THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program Lockout / Tagout Policy.
Lock-Out/Tag-out.  What is lock-out/tag-out (LOTO)?  The proper procedure for installing locks and tags.  The proper procedure for removing locks and.
Workplace Safety and Health Program
JOB HAZARD ANALYSIS Example Guide.
Evolution Industries Jan A Lockout/Tagout (LOTO) program ensures that energized equipment or machines are not started or used while they are being.
Instrument Safety Design At The Spallation Neutron Source Greg Rowland, ORNL.
/0203 Copyright ©2002 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Safety and Health Program.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Lali Tchelidze Safety work package leader
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
Process Safety Management
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
HYBRIS: R. Keller Page 1 A Hybrid Ion Source Concept for a Proton Driver Front-End R. Keller, P. Luft, M. Regis, J. Wallig M. Monroy, A. Ratti, and.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Experimental Facilities DivisionOak Ridge SNS INSTRUMENTS OVERVIEW R. K. Crawford Instrument Systems Senior Team Leader September 10, 2004 HYSPEC IDT Meeting.
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Client Site Evaluations and Touring Potential Job Sites
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Update T. E. Mason Oak Ridge National Laboratory Associate.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Unit 4: General Safety Practices
OFFICE OF SCIENCE The Making of the Spallation Neutron Source A 25-Year Journey Patricia Dehmer Deputy Director for Science Programs & Acting Director.
Division of Risk Management State of Florida Loss Prevention Program.
The SNS Second Target Station and Instrument Optimization Across ORNL Neutron Sources K. W. Herwig Instrument and Source Division Oak Ridge National Laboratory.
Alexander Aleksandrov Oak Ridge National Laboratory
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Lockout/Tagout.
1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Proton Beam for PRISM Keith Gollwitzer Accelerator Division Fermilab 5 th Workshop Project X Physics – Muons November 8, 2010.
EliminationSubstitutionEngineeringAdministrationPPE Incident Reporting.
September 10, 2004 Experimental Facilities Division SING Project Status HYSPEC IDT Meeting John Haines SING Project Manager September 10, 2004.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY The Spallation Neutron Source Project: Update T. E. Mason Oak Ridge National Laboratory.
1 BROOKHAVEN SCIENCE ASSOCIATES 2009 DOE Accelerator Safety Workshop BNL S-band LINAC Fire Safety Concerns August 19, 2009 A. Ackerman.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
1 BROOKHAVEN SCIENCE ASSOCIATES Summary of Shielding Calculations for NSLS2 Accelerators P.K. Job Radiation Physicist Peer Review 2007 March
Standards for Technical Educators Occupational Safety & Health.
HYSPEC IDT HYSPEC: Our Instrument at the Spallation Neutron Source. Outline Spallation Neutron Source (SNS) and the BNL Overview of the SNS instrument.
An introduction to… Lockout Tagout. Aim Every year thousands of workers get killed or injured while performing repairs or maintenance on industrial equipment.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Overview of FESHCom Subcommittees Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
The ESS Target Station F. Mezei ESS target division NPPatLPS, 2013.
Lockout/tagout for authorized employee
The Control of Hazardous Energy (Lockout-Tagout)
Making Difficult Decisions in a Transparent Way –
Mangan Inc. Hazard Communication 11/15/2012
The Control of Hazardous Energy (Lockout-Tagout)
Safety is part of our culture at Halliburton
EPICS Meeting March 12 – 14, 2008, Shanghai, China
Ian Evans SSRL Safety Office
Test Beamline System Requirements and Charge to PDR Committee
SNS-PPU upgrades the existing accelerator structure
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Spallation Neutron Source Safety Program Overview Samuel McKenzie ESH Coordinator Accelerator Systems Division April 13, 2005

Spallation Neutron Source SNS Site – 2004 The SNS will begin operation in 2006. At 1.4 MW it will be ~8x ISIS, the world’s leading pulsed spallation source. SNS will be the world’s leading facility for neutron scattering. It will be a short drive from HFIR, a reactor source.

SNS will be World-Class!

SNS Accelerator Complex Front-End: Produce a 1-msec long, chopped, low-energy H- beam LINAC: Accelerate the beam to 1 GeV Accumulator Ring: Compress 1 msec long pulse to 700 nsec H- stripped to protons Deliver beam to Target Chopper system makes gaps 945 ns mini-pulse Current Current 1 ms macropulse 1ms

SNS High Level Baseline Parameters Proton beam energy on target 1.0 GeV Proton beam current on target 1.4 mA Power on target 1.4 MW Pulse repetition rate 60 Hz Beam macropulse duty factor 6.0 % H- peak linac current 38 mA Ring fill time 1.0 ms Ring beam extraction gap 250 ns Protons per pulse on target 1.5x1014 Proton pulse width on target 695 ns Linac length 335 m Total Beamline Length 903 m

Facility Parameters Area size of construction site 86 acres Access and service roads 5 miles Quantity of excavation at completion 1.5 MCY Concrete 88,000 CY Structural Steel 4,870 T Electrical power (connected load) 78 MVA Electrical power (operational demand) 49 MVA Cooling water (heat load rejection) 37.4 MW Cooling Tower water peak flow rate 21,000 gpm Size of buildings and structures 616,000 sq ft Site occupancy, including users, up to 500 persons

Target Systems Converts up to 2 MW of 1 Gev Protons at 60 Hz into useful short neutron pulses. Major Subsystems Mercury target. 3 Supercritical hydrogen moderators with associated cryogenic systems and one ambient water moderator. Beryllium reflector system. Core vessel for target, moderator, reflectors. 10 m diameter iron shielding with shutters for neutron beams. Utility systems including heavy and light water. Remote Handling systems. Instrumentation and controls. Linac, Ring Injection and Ring Extraction beam dumps.

Target Building and Instrument Layout 18 - Wide Angle Chopper Spectrometer – IDT DOE Funded – Commission 2007 17 - High Resolution Chopper Spectrometer – DOE Funded (SING) – Commission 2008 13 - Fundamental Physics Beamline – IDT Funding TBD – Commission TBD 11A - Powder Diffractometer – SNS Funded – 12 - Single Crystal Diffractometer – Commission 2009 9 - Engineering Diffractometer – IDT CFI Funded – 6 - SANS – 5 - Cold Neutron Chopper Spectrometer – 4A - Magnetism Reflectometer – Commission 2006 3 - High Pressure Diffractometer – 2 - Backscattering Spectrometer – 1B - Disordered Mat’ls Diffractometer – Commission 2010 PROTONS 4B - Liquids Reflectometer – 14B - Hybrid Spectrometer – DOE Funded (SING) – Commission 2011 15 – Spin Echo ? – Chemical Spectrometer 60 m

Target Region Within Core Vessel Target Module with jumpers Outer Reflector Plug Target Inflatable seal Core Vessel water cooled shielding Core Vessel Multi-channel flange

History of SNS In 1998 DOE Broke Ground on the SNS with Critical Decision 4 (end of Project) in 2006 In 2000 the University of Tennessee and Battelle Teamed to win the Contract to Manage Oak Ridge National Lab. Later that Year a “New” SNS Project Director was Hired and given Equal Status with the ORNL Lab Director. A Stream-Lined Safety Program was Envisioned with Little if any ties to ORNL. In 2002 a “New” Project Director was Hired and placed SNS Back Under the Direction of ORNL.

Standards Based Management System (SBMS) A Proven System That Both PNNL and BNL Utilizes. Additionally INL will soon begin their Implementation Process. Creates “One Stop Shopping” for Work Control and the Standards that the Work Shall and/or Should Follow Clearly Defines ALL the Necessary Steps Needed to Perform a Certain Task.

Safety Overview Since 2000, SNS (Non-Construction) has had 15 Recordable Injuries and Illnesses (RIIs) Cases and 1 Day with Restrictions Case (2002). Additionally, ASD has 3 situations where there were violations of Internal Posting and/or Procedures (i.e. Lock Out Tag Out, Internal Parameters, etc.). The injury rate at SNS remains exemplary (1.2 per 200,000 hours), and we must continue to strive for a continued safe work environment. In the coming months, we (SNS) will assume responsibility for the craft labor contract from Knight-Jacobs. This means we will be directly responsible for their attitude of, and commitment to, safety.

Safety Chain

Electrical Systems By far our most dangerous activity is working on de-energized electrical systems, circuits and panels. ASD has systems in every facet of its operation that utilizes high currents, voltages and/or capacitances! A rigorous Lock Out Tag Out (LOTO) program is a must. Our LOTO program serves us well and each group has a Safety Officer responsible for compliance with both NEC and SNS rules. Additionally, we have offered over 10 Electrical Safety Classes that deal with the various aspects of our electrical equipment.

Research Safety Summaries Research Safety Summaries (RSSs) are prepared at the Group and Lab Level. Identify hazards a particular group is exposed to in their work. Assist the Group Leader in determining the appropriate training and controls that need to be in place prior to performing work. Defines the complete list of SBMS requirements for that Group.

Job Hazard Analysis Job Hazard Analysis (JHA) - lynchpin of our Safety Program process CLEARLY understood by all ASD employees and is the basis of Integrated Safety Management (ISM). Work is defined in well understood steps. Associated hazards determined at each step. Action(s) established to mitigate hazards (i.e., safety glasses, erect a scaffolding, etc.). Perform work within JHA guidelines. JHAs are routinely reevaluated for completeness and enhancement. Worker driven program with constant feedback on how we can continue to make the work safer.

ASD Example 1 Hoisting and Rigging On Nov 5, 2001 An Employee at our old Receiving Facility was in the process of Lifting a Dipole Magnet when One of the Eye Bolts Failed. As a Result of this Event we (ASD) instituted a Formal Process of Developing a Lift Plan for all our Lifts. A detailed JHA is Prepared and the Documentation is reviewed by one of a Select Group of Mechanical Engineers The Lab’s Program is Modeled after ours and Our External Accelerator Review Committee has made several statements complimenting us on the rigor and completeness of our Hoisting and Rigging Program

ASD Example 2 Lock Out Tag Out On Nov 22, 2002 An Employee was inspecting a Lock and Tag applied to a Circuit Breaker in the Klystron Building when the tag came off in the employee’s hand. The incident was not properly reported. As a Result of this Event we (ASD) immediately provided a LOTO Practical Factors Training Program for all Affected Employee. As a result of finding additional deficiencies we provided LOTO Verification Training. ASD has always employed the OSHA Required Equipment Specific LOTO Process. The lab’s program now employs this process as well.

Where There’s Smoke…..There’s not ALWAYS A Fire! On Sept 9, 2004 An Evacuation of the Linac Tunnel, Klystron Gallery and Front End Building Occurred while we where Commissioning our Warm Accelerator (~150 MeV). This evacuation was due to Our Early Detection Smoke Alarm System.

Smoke Event Cont’ This evacuation occurred due to a Cryogenic Gas System heater being in close Proximity to Canvas Bags containing Steel Shot that is used for shielding Purposes. The 2 kW Heater is normally used during the Initial Cryomodule fill process. For our 4 Kelvin cool down the system remained in place ~1 month. Due to Thermocouple Placement and other factors the system did not respond properly and cause the pipe to Overheat.

Smoke Event cont’ This Overheating never caused an open flame fire but did burn several Canvas Bags that Held the Steel Shot.

Conclusion SNS has done a wonderful job of developing a concise system embracing SBMS and ISM to build a world class accelerator facility! We have to continue to learn from our own mistakes and from others. We have to be open and honest about our mistakes as well as our successes. We must Continue to understand what we want to do before we perform the Work (ISM). We have to recognize that the hazards within our divisions continue to increase as we go into operation with more and more very powerful equipment We have to be aware, that we share issues. Perform work in offices, storage buildings etc that carry their own risk, which usually is not as obvious as the technical ones.