Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.

Slides:



Advertisements
Similar presentations
Module Production T. Bowcock. News Since Last Meeting Engineering Design Review (20-21 st April) –Mechanics including module and fixtures –Components.
Advertisements

LHCb Velo Electronics PRR
Tony Smith LHCb Velo EDR Liverpool 20-21/04/05 1 HYBRIDS EDR LIVERPOOL APRIL 05 Tony Smith.
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Module Production T. Bowcock. Substrates Twist problem –Further understanding of the warp/weft and layup problem Chirality of the twist –Looks like it.
LHCb Velo Construction Authorisation steps Tony Smith.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
SMG facility – 24k Square Feet. Drilling We have 7 fully automated Excellon Drilling/ Routing machines. The drilling program is generated from the customer.
EELE 461/561 – Digital System Design
Manufacturing Processes for a 4 Layer Multi-layer PCB Section through PCB Via hole SMD Pad The following presentation covers the main processes during.
OMG Fidelity ELECTROLESS NICKEL IMMERSION GOLD
Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
© Learning and Teaching Scotland 2006 Processes Methods of joining Click on appropriate star Higher Product Design Processes.
One Way Circuits Limited Printed Circuit Board Manufacturer A Guide To Manufacturing Multilayer PCBs Use Left and Right Cursor keys to navigate ESC to.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Printed Circuit Board Design
Tony Smith LHCb Velo EDR Liverpool 20-21/04/05 1 HYBRIDS- construction CONSTRUCTION of composite SUBSTRATE - many lay-ups tried – best flatness obtained.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
GCSE Valley College Name: Applying New Technologies: Investigating Engineering Products How is a Casio watch in manufactured: Materials.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Atsuhiko Ochi, Kobe University 18/03/2015 RD51 CERN.
Atsuhiko Ochi Kobe University 28 August 2012 ATLAS muon chambers R&D on micromegas meeting.
Electronics Miniaturization using Fine-Feature Nanosilver conductors
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
System Test Status Report R. D’Alessandro 1 TIB System Test Report Where were we ….., Mechanics (layer 3 prototype) Mother Cable & Interconnect Board System.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Multilayer thin film technology for the STS electronic high density interconnection E. Atkin Moscow Engineering Physics Institute (State University) –
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
PS Module Gluing Tests USCMS Outer Tracker Workshop Ulrich Heintz, Meenakshi Narain, Bill Patterson, Sinan Sagir, Adam Lanman, Eric Spencer, Juan Trenado,
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Interconnection in IC Assembly
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
GEM Foil Development at ECIL
AIDA FEE64 production report January 2011 Manufacturing Power Supply FEE64 revision A “3 hour test” 19th January
Status of GTK_CARRIERS_2015 NA62 GTK WG meeting Michel MOREL October,
WP3 Meeting 8 th October 2015 Power Boards for TM stave status 30 boards received and tested – targeted for TM modules Testing communication with 1-wire.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Electronics for CEDAR Cristina Lazzeroni, Marian Krivda, Richard Staley, Xen Serghi, Karim Massri University of Birmingham, UK 3/5/
Stave Tooling & Plans for Future Stave-building (Tim)
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
 A PCB is printed circuit board, also known as a printed wiring board. It is used in electronics to build electronic devices. A PCB serves 2 purposes.
To Panelize or Not to Panelize
SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.
Transmission Line Studies Need to understand data transmission at 640 Mbps along bus tape. Analytic formulae FEA calculations from Roy. Network analyser.
Workshop How to make a PCB
LHCb PRR - Girish D. Patel1 QC and Process Control G. D. Patel.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
FED Front Panel Hole Size Problem
Rev:A ( check-->19 pages document)
T. Bowcock University of Liverpool
Printed Circuit Board Design
Are there better ways to build a stave?
Hybrid Issues.
ob-fpc: Flexible printed circuits for the alice tracker
Studies of Quad Pixel Module assembly using paper laminate
Presentation transcript:

Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core 400um woven layer of CF prepreg each side oriented +-45 degrees 125um nominal woven layer of CF prepreg each side oriented 0,90 degrees 125um nominal Total thickness ~900um Two Lamination methods tried: in vac bag and autoclave at Liverpool - some voids and Flat to 200um Thickness 900um +- 30um randomly distributed in PCB press at Stevenage Circuits – very flat*, still some very small voids* Thickness 870um at centre – 40um at edges but smooth taper Obvious loss of epoxy at the edges – not considered a problem * small voids could be filled with epoxy *flat to the extent that it floats on air when placed on a flat surface on either side.. SUBSTRATES

Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 2 VELO HYBRID STATUS LAMINATION of circuits Two Adhesives tried: STAYSTIK um 130 degs BONDPLY (polyimide used for PCB lamination) 35um 160degs Staystik sample dished ~500um but good surface finish – good adhesion but circuit peels easily at the edges Thickness 1.38 – 1.47 It is not known if substrate contributed to dishing. Bondply sample good flatness but surface finish shows voids in substrate - good adhesion Thickness 1.35 – 1.36 BUT the sample showed delamination of the TPG SUBSTRATES 2

Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 3 VELO HYBRID STATUS DELAMINATION of TPG considered a serious problem Note that the failures at the edges all appeared to be due to laminar cracks in the TPG rather than a failure of the bond between the tpg and the CF facings New substrates made with a CF frame approx 4mm wide around TPG TPG is cut to a smaller size and CF prepreg strips placed around the edges This bonds the CF facings at the edges and relieves the outward stress on the TPG. Lamination was done in vac bag and autoclave at Liverpool Circuits were bonded using Bondply and there were no signs of delamination at the edges. Unfortunately the cutouts in the side were not machined out so the lamination pressure would not have been even. There is a small area on one side where the circuit has obviously been pressed hard, as seen from its taking up the pattern of the holes in the substrate however there is a failure of the adhesive at this point. Given that this is a localised problem and all other areas seem to be bonded very well it is thought that it is possible that there was some contamination from the profiling process. Substrates will be thoroughly cleaned before lamination in future SUBSTRATES 3

Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 4 VELO HYBRID STATUS The two substrates laminated at Stevenage will be sent back to them and laser cut rather than using CNC milling. One will have holes filled with BN loaded Epoxy to planarise it. Need to create CAD data for profiling –Monday 2 nd August These will be laminated with good K04 circuits on one side and failed circuits on the other side. 4 more prepared for lamination by wed 11 August INVENTORY of parts 2 laminated substrates 4 TPG cores in stock, 100 On order for delivery by end October Sufficient CF prepreg for many Substrates but will be past use date for main build 9 good K04 circuits and 3 failed ones at Stevenage Population

Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 5 VELO HYBRID STATUS Population of circuits Final pop will be done using solder paste stencilled onto circuit and reflowed setup for this will take too long to use this method for beamtest (Will need some iteration with the company to get jigging right they normally silk screen full panels populate them and then cut/ break out individual boards. ) For October beamtest components will be soldered in house. Standard solder paste and indium solder paste will be tried. Components available for population of 4 + single sided modules (connector limited – lots of other comps) One more set of short tails available. Population

Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 6 VELO HYBRID STATUS Fanout designs for Phi and R both completed All locations are different, drawn in sets of 4 Fanouts Rfanout detector end One complete set of Phi and R on one sheet Will make 6 sheets by 20 th August Gold on copper on upilex 22um min T&G

Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 7 VELO HYBRID STATUS Hybrid + short cable tested together in Vac Tank Hybrid populated with decoupling caps (2*500v 10nf to Gnd) Guard and HT shorted together All lines except HT and Guard on HT connector shorted to ground (includes Power) 1meg ohms in both HT and return lines volts leakage current steady at 0.2nA (temporary 0.3 at 90V) Discharges observed at 430V (2.3nA typical – several seconds period) Baseline =0.2nA 440V – 500V discharges of up to 15nA almost every reading above 460V Back down to 430 then up onset of discharges at 480V Regular discharges at 520V and baseline = 0.5nA Down to 510 no discharges, baseline back to 0.2nA Up to 550 –discharges of 6nA down to 530 no discharges Baseline 0.3nA Left at 500V and after 1 hour baseline 4nA no discharges Up to 510V (discharges) and back down baseline returns to 0.2nA SEEMS TO RESPOND TO TRAINING – NEED LONGER TESTS HT TEST