Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

EMMA Magnet Design Ben Shepherd Magnetics and Radiation Sources Group ASTeC STFC Daresbury Laboratory.
US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 1 CMS Si Tracker: Breakout Session Dept.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
Status Update on Mechanical Prototype in Rome November 6,
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
Spacecraft Stereo Imaging Systems Group S3. Variables Separation of the cameras Height of the cameras – relative to the bench Angle – The direction cameras.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
TP4-ENERSOL-TD/PV double function
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Status of the Alignment 17/12/04 Dario Autiero. Measurements taken so far: 13/9 TT8 On the mounting arch 12/11 TT7 Standalone in the target 19/11 TT7.
Brussels Gantry Ê Problem with vacuum chambers in plate 4 leaks in plates with gives communication between positions Ë Problem with rotation motor (U-motor)
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Status Brussels GANTRY Ê New measurements of pin positions 4 using short pins rather than long ones 4 improved the precision Ë Cross-check of precision.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
Paul Rubinov on behalf of Gene Fisk, Kurt Krempetz 22 Aug 2012.
Measurements of DB supporting systems Fiducialisation Sylvain GRIFFET, 21/03/2011 Measurements performed in February and early March /13 EDMS n°
Best Practice T-Scan5 Version T-Scan 5 vs. TS50-A PropertiesTS50-AT-Scan 5 Range51 – 119mm (stand- off 80mm / total 68mm) 94 – 194mm (stand-off.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Phase 2 Outer Tracker Module analysis
Status Brussels GANTRY
Status Brussels GANTRY
FNAL Production Experience
US Module Production Status
Vienna Module Production
University of Wisconsin-Madison
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
OGP Surveying & DB Entry
L.Fiore Gantry Meeting during the CMS TK week
Module Production in Brussels
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
TOB Module Production Overview and Plan
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
FNAL Hybrid Testing Status
Presentation transcript:

Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White

Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 2 Assembly Plate Pins Just completed recessing and re-measuring the module mounting pins on all 5 TOB R-phi assembly plates that we currently have. The problem: In the process of re-measuring 3 modules on one of our assembly plates we found large overall shifts (50-75 micron) and angles (10- 30) in two of them. Sensor to sensor alignment and angles were unchanged and within specification, but with respect to the module mounting pins there were large differences. After discovering this, we took 3 modules that were <10 microns off in all their fiducial specifications and re-measured them on all 5 TOB assembly plates in all 3 positions on our OGP machine. The results of this showed, 1 position on 2 separate assembly plates that had obvious problems with the position of the pins. This also turned out to be the positions where the two modules, in our original re-measure with large overall shifts, had been built. This suggested that the pins at these locations were not straight or some how damaged.

Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 3 Assembly Plate Pins The solution: At the 2 bad positions, we found one had a bent pin and the other had a large angle and was protruding 3mm past the module mounting clip. We then decided to check and recess all pins as far as possible to eliminate any offset from the top of the pin and where the module clip rests on the pin. These distances ranged from 1- 3mm. Then we re-measured our 3 “test” modules on all positions on all plates(5) after the pins had been checked, recessed and re- measured. Results – all re-measurements were within specification for individual and sensor to sensor angles. 6 re-measurements our of the 45 done had 1 or 2 fiducials at the far end of the module that were out of the 30 micron x position specification. I think this will be hard to avoid with the large aspect ratio between the pins and the length of the modules in the y direction.

Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 4 Assembly Plate Pins Conclusions: 1.We need to double check that the assembly plate pins are put in straight and to max depth possible. This is a good time to find this out since we have 12 new plates just about ready to be commissioned. 2.We will check all new plates by re-measuring “test” modules on them to make sure we are getting consistent measurements. We had re-measured a few modules in the past without seeing a problem, but had not tested all plate positions. 3.During production, we plan to do weekly re-measurements of our assembly plate pin positions with respect to the plate fiducials. This will be to make sure we catch any change in a pin position before many modules have been made on it. This only takes a few minutes to do on the OGP. 4.I will present the module re-measure data in more detail with graphs etc. in the future, but wanted to alert people at Tracker Week to the problem we found in a couple of our assembly plates. Our TEC R6 plate looks fine. We still need to double check our TOB stereo plate.