DI conference – 28 May 2008 (Pre-)SIEF in practice Jack Wille - Cefic.

Slides:



Advertisements
Similar presentations
From the eyes of an Administrator A general overview of e-CFunds Administrative Site, including navigation and exploring the features of this powerful.
Advertisements

Rightsrouter and DOI Presentation to IDF Members Meeting 22nd June 2004 Gordon Rintoul - Director of Operations.
Chit Fund Company Flowchart.
Business Development Suit Presented by Thomas Mathews.
A university wide electronic research ethics review system?
Copyright Hub Software Engineering Ltd 2010All rights reserved Hub Document Exchange Product Overview Secure Transmission for Transaction-based Documents.
CCH Practice Management & Beyond CCH Central Lee Bennett Nikki Ledic Liz Waterson.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Enabling Responsible International Workplaces New FFC Partnership Model.
Federal Acquisition Service U.S. General Services Administration Contract Payment Reporting Module (CPRM) Advanced Instruction on Workflow and System Access.
Identity Management Based on P3P Authors: Oliver Berthold and Marit Kohntopp P3P = Platform for Privacy Preferences Project.
Cefic model SIEF Agreement: benefits and practical aspects CEFIC Legal Aspects of REACH Issue Team (LARIT) June 2009.
REACH: data sharing and SIEF (RIP 3.4) WERCS 2007 US User group Albany 27/06/2007 Dr. Erwin Annys Sr. Advisor Product & Innovation Policy.
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
An Introduction to the Hennepin County Hennepin County GIS Technical Advisory Group (eGTAG) 10/20/2009.
Employee Central Presentation
Lexmark Print Management
E-Business: Intra-Business E-Commerce
Turning our REACH expertise into practical help for industry A PRACTICAL GUIDE FOR THE 2013 REGISTRATION AND OTHER REACH ONGOING DUTIES On the REACH road.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
State of Indiana Business One Stop Process Storyboards To support RFP and Requirements As of September 13, 2013 Prepared by: RFP Attachment L.
REACH: Protecting Your Supply Chain Georjean L. Adams EHS Strategies, Inc. November 17,
Confidential Crisis Management Innovations, LLC. CMI CrisisPad TM Product Overview Copyright © 2011, Crisis Management Innovations, LLC. All Rights Reserved.
How could industry make best use of the guidance? Johan Nouwen Guidance and Helpdesk (A.1) REACH Workshop - Brussels 18/09/2008.
ArcGIS Workflow Manager An Introduction
Solution Overview for NIPDEC- CDAP July 15, 2005.
Pre-registration, data-sharing and SIEFs Geert Dancet REACH Workshop – Brussels 18/09/2008.
What is SMEcollaborate Primarily developed for Small and Medium Companies who wish to collaborate together. It is a:- A resource center for collaborating.
Experiences with registrations - 5 years on the road On the REACH Road 23 November 2011 Kevin Pollard ECHA – Dossier Submission and Dissemination.
MyFloridaMarketPlace MyFloridaMarketPlace User Meeting September 6, 2006.
1 The role of the only representative Simona Fajfar.
July 2010 Staffing Release Friday, March 5, 2010.
May 16, 2007 Enterprise Content Management- Paperless Government: Association of Governmental Accountants Enterprise Content Management- Paperless Government:
Budget Module For Sage MIP Fund Accounting. Sage Requirements Fund Accounting 10.0 or higher Budget Module optional but required for multiple budget versions.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
U.S. Department of Agriculture eGovernment Program July 15, 2003 eAuthentication Initiative Pre-Implementation Status eGovernment Program.
© TIAC group, IPA Information System [case study] Vojvodina Investment Promotion Fund.
Georgia Gateway– Integrated Eligibility System (IES)
Part 3 RIP 3.4 – DATA SHARING Alan Eastwood, Economic Advisor, CIA.
October 3, 2002Initial Proposal - Board of Directors1 SYSTEM-TO-SYSTEM WORKGROUP.
1 Pre-registration and support to industry Doris Thiemann September 2008 Iceland.
CHEMSTEWARDS SOCMA COMPLIANCE MORE FOR MEMBERS - VISIT SIEF and Consortium Management Issues under REACH Dr. C. T. Helmes Senior Director.
REACH Activities in progress in ITALY UNICHIM - Milano
Credit Management Services
WERCS REACH Initiatives Geoff Brooks Chief Software Architect The WERCS,Ltd.
Authorized economic operator Minimizing risks, optimizing flows.
AR350: Maintaining Customers Welcome to AR350: Maintaining Customers.
MCSE Guide to Microsoft Exchange Server 2003 Administration Chapter One Introduction to Exchange Server 2003.
SWIMMING 1 ACTIVEWORKS SELF-SET UP ONLINE TEAM REGISTRATION Changing the way Swim Teams offer Team Registration.
D EMO W IND 2 – Delivering Cost Reduction in Offshore Wind ERA-NET Briefing Event 1 December, 2015 Sally Fenton, DemoWind Co-ordinator For further information,
The overview How the open market works. Players and Bodies  The main players are –The component supplier  Document  Binary –The authorized supplier.
Upay User Guide WELCOME TO UPAY This guide is aimed to help you to use the Upay website. To launch Upay you will need to navigate to
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
Increase the value of Accounts Payable Presenter: Daniel Kimpton.
Ron Johnson, CFA Litman/Gregory Asset Management.
Introduction to REACH Flavie Guérin U.S. Mission to the EU 15 November 2011.
2echa.europa.eu/reach-2018 Purpose of this presentation This presentation, with notes, was prepared by ECHA, the European Chemicals Agency, to assist.
REACH 2018 Find your co-registrants and prepare to register jointly.
Global Grid Forum GridForge
Intercompany Project Time and Expenses Scenario Overview
R12 Shared Services Support Multi Org Access Control - MOAC
REACH 2018 Get organised with your co-registrants –
Electronic Manifesting (e-Manifest)
Registration deadline has passed, what now?
Manufacturers Webinar
Contract Payment Reporting Module (CPRM)
State of play of B2G eInvoicing in public procurement
Business Document Platform
Presentation transcript:

DI conference – 28 May 2008 (Pre-)SIEF in practice Jack Wille - Cefic

DI conference – 28 May page 2 SIEFreach Agenda: –Introduction / Background –System overview The overall process Data transfer from ECHA REACH-IT system into SIEFreach Setup company structure / User accounts –How work inside a SIEF –Payment of fees –Beyond the SIEF: Joint Submission

DI conference – 28 May page 3 SIEF IT system project - Background The obligation to share animal study data in SIEFs (Substance Information Exchange Fora) and Submission of a Joint Registration: –is industry’s responsibility –the European Agency (ECHA) will not be involved –therefore industry has to find a solution Cefic initiative: IT platform giving service to all industry, providing for: –Collaboration of companies in SIEF formation & sharing of data, identification of data gaps, cost sharing, etc. –Secure communication inside and between SIEFs Benefits for companies of a SIEF IT platform: –Consistent processes and procedures –No need for individual solutions (reducing complexity) –Reduced investment and lower operational cost per company What if not such a system…….: –Multiple other (independent) SIEF IT systems by industry sector, for consortia, etc. – communication for SIEF communication less efficient / more time consuming

DI conference – 28 May page 4 SIEF IT system Project – Timing –Project kick-off (Requirements Definition)31 July 2007 –Start Build-phase 8 Jan –User Acceptance test-121 May 2008 Test-1 with ECHA REACH-IT system22-23 May 2008 –User Acceptance Test – June 2008 –Implementation: Release 1.0Early July 2008 Release 2.0 (Invoicing, reporting)August 2008 Release 3.0 (Splitting / Merging SIEFs)1 Dec. 2008

DI conference – 28 May page 5 Central IUCLID5 database Pre- Registration Registration SIEFreach ECHA Industry (Joint) Dossier Preparation SIEF IT system project Pre-Registration data IUCLID5 system ECHA Pre-SIEF data is the source for SIEF REACH-IT system

DI conference – 28 May page 6 SIEFreach – Key components A common system for SIEF participants (consistency) Used across different industries (chemical, cosmetics, paper, etc.) Based on ECHA Pre-SIEF data: –Enable Pre-SIEF / SIEF discussions using collaboration tool features Free access area vs. ‘paid’ area Predefined roles / privileges: –SIEF Formation Facilitator, SFF, Lead Registrant –Legal Entity Group Administrator –Legal Entity User (one primary user per LE / Substance) –Invited Expert –Data Holder

DI conference – 28 May page 7 SIEFreach – IT Infrastructure Robust, scalable system configuration (servers, database, network) IT Service Provider: IBM Sub-systems designed under ‘umbrella’ of Portal software Redundant installation to limit system downtime (max. 24 h.) (Disaster recovery site) Service Desk to resolve problems 3 main sub-systems: –Legal Entity / User Management –SIEF collaboration / processing (based on Lotus QuickR software) –Invoicing (fee collection)

DI conference – 28 May page 8 SIEF IT system – Company launched Dedicated company established (ReachLink) Shareholders: Cefic + National Federations: –Germany – VCI –France – UIC –Italy – Federchimica –UK – CIA –Spain – FEIQUE ReachLink owns and manages the system Management Board (Shareholder representatives) User Committee and Steering Committee Managing Director hired Marketing / Communication campaign started 2H-May 2008

DI conference – 28 May page 9 SIEF IT System Benefits: –Streamlined transparent communication between parties –Consistent processes and procedures –Tracking of all discussions / decisions during SIEF life time –Designed in collaboration with major players in the Chemical Industry –ECHA pre-SIEF data is the basis for the SIEF –No need for individual solutions (reducing complexity) –Lower operational cost per company –Controlled access & Secured communication –Guaranteed platform till at least 2018

DI conference – 28 May page 10 SIEFreach Agenda: –Introduction / Background –System overview The overall process Data transfer from ECHA REACH-IT system into SIEFreach Setup company structure / User accounts –How work inside a SIEF –Payment of fees –Beyond the SIEF: Joint Submission

DI conference – 28 May page 11 Registration SIEF IT system Agency Industry (Joint Submission) Dossier Preparation Pre-Registration / SIEF / Registration process IUCLID5 ECHA Pre-SIEF data is the basis for SIEF-IT system Other source (e.g. Excel) Plug-in XML conversion Pre-SIEF SIEF Data Holders Pre- Registrants Data Holder Submission Procedure Registrants Early Registrants Cefic / Concawe developed standard based on Excel – free of charge for all companies

DI conference – 28 May page 12 This slide is copied from ECHA presentation 15 Feb Pre-SIEF web page (ECHA REACH-IT system)

DI conference – 28 May page 13 Export to SIEF-IT system Pre-SIEF data are the basis for SIEF-IT system SIEF participants Read- across Data Holders Designation of SFF Sameness LR Designation Classification & Labeling Cost sharing Testing proposals Dashboard ECHA Pages (cannot be updated) Data Availability Data Holder pages Data gaps SIEF Member Pages Substance description After Company Available data (studies) Free access ECHA REACH-IT system – Pre-SIEF SIEF-IT system Data export from Pre-SIEF (ECHA REACH-IT system) to SIEF-IT system

DI conference – 28 May page 14 SIEFreach – Information Folders SIEF participants Read- across Data Holders -Designation of SFF -Sameness -LR Designation -Classification & Labeling -Cost sharing -Testing proposals -SIEF Status page ECHA Pages (cannot be updated) -Data Availability Data Holder pages -Data gaps SIEF Pages Pre- SIEF data Substance description After Company Available data (studies) Free access Note: Consider a SIEF as a set of ‘Information pages’ on relevant topics

DI conference – 28 May page 15 SIEFreach - SIEF Page composition 4 different Body types, i.e. maintained by: - Synchronisation with ECHA - Maintained by SFF / LR (most pages) - Maintained by SIEF User (Studies pages) - Maintained by Data Holder Threaded discussion: - Any SIEF LE User who has write access Attaching documents: - Any SIEF LE User who has write access SIEF Name, SIEF Nickname, Sub-SIEF Name Body Forum Attachments Header

DI conference – 28 May page 16 From REACH-IT system to SIEFreach 1. SIEFreach - preparation: –Setup Legal Entity structure and create User Accounts –Legal Entity Group Administrator (First user to sign up for a company): –Creates Legal Entity Group –Creates Legal Entities –Creates User Accounts 2. REACH-IT system - Data transfer: –ECHA Pre-SIEF data is the basis for the SIEF –Pre-Registrants access ECHA Pre-SIEF web page to view pre-registrants, including Potential Registrants, (Early)-Registrants, Data Holders –Data transfer from ECHA system to SIEF IT system triggered by a Pre-SIEF participant 3. SIEFreach - SIEF activation: –‘Handshake’ ECHA data and SIEF LE data –Assigns Users to SIEFs (allocate to SIEF slot)

DI conference – 28 May page 17 Substance Legal Entity Legal Entity Group 1 2 Legal Entity Legal Entity Legal Entity Substance Legal Entity Legal Entity Legal Entity ECHA REACH-IT system SIEF Substance Legal Entity Legal Entity Substance Legal Entity Legal Entity Legal Entity SIEF 4 SIEFreach system 1 - Setup your company SIEF structure (Legal Entity Group, Legal Entities, Administrator, User Accounts) - Data transfer from ECHA - Handshake / activate in SIEFreach - Allocate Users to SIEF / SIEF Role - Collaborate with other SIEF participants Legal Entity 3 5 Legal Entity Pre-SIEF 1 Pre-SIEF 3 Pre-SIEF 2 Pre-SIEF … Pre-SIEF Legal Entity Group Admin. (LEGA) User Account SIEF Folder E.g. - Substance Sameness - Studies - Data Gaps - C&L 5 Pre-SIEF data Steps to go through: From REACH-IT system to SIEFreach

DI conference – 28 May page 18 SIEFreach Agenda: –Introduction / Background –System overview The overall process Data transfer from ECHA REACH-IT system into SIEFreach Setup company structure / User accounts –How work inside a SIEF –Payment of fees –Beyond the SIEF: Joint Submission

DI conference – 28 May page 19 Pre- SIEF Administrative Tasks SIEF Status Page - User Admin - Security - Assign Lead Registrant SIEF Formation Cost sharing C&L Subst. Id. Card Data Exchange Maintain Information Pages SFF* responsibility Lead Registrant responsibility * SFF = SIEF Formation Facilitator Prepare Joint Submission Administrative Tasks SIEF Status Page Joint Submission Member Submission - Discussion Forum - Collaboration Tool - SIEF changes Registration SIEF IT system - Overview Potential Registrants ‘Invited Users Page’ SIEF System boundary SIEF system changes SIEF Database

DI conference – 28 May page 20 SIEFreach – System overview SIEF updates Updates at ECHA system during / after Pre-Registration phase, e.g.: –Name, Address, Contact person –Cancel Pre-registration (inactivate in system – no physical delete) –Late Pre-Registrant –Add Read-across Substances –Add Data Holder Synchronisation with SIEF by ‘ refresh’, triggered by an active SIEF User In addition, SIEF updates will be possible in SIEF IT system, e.g.: –Splitting / Merging of SIEFs

DI conference – 28 May page 21 SIEFreach – screenshot-1

DI conference – 28 May page 22 SIEFreach – screenshot-2

DI conference – 28 May page 23 SIEFreach Agenda: –Introduction / Background –System overview The overall process Data transfer from ECHA REACH-IT system into SIEFreach Setup company structure / User accounts –How work inside a SIEF –Payment of fees –Beyond the SIEF: Joint Submission

DI conference – 28 May page 24 Fee Payment: –Payment options: Credit card (CC) orders and Purchase Order (PO) / Sales Order (SO) / Invoice process –Legal Entity Group Admin (LEGA) is contact for PO / Invoice –LEGA sends Purchase order for SIEF participations by Legal Entities –After payment, credit amount is stored at LEG level –For each SIEF participation, credit amount will be deducted –Reporting will provide details on spent amount per Legal Entity SIEFreach – Invoicing process

DI conference – 28 May page 25 SIEFreach – Fee payment Fee payment to be paid in order to cover the cost for the system ‘One time fee’ for each SIEF participation for 11 yrs.: Base fee: 300 € by SIEF / by Legal Entity / Substance Payment required to obtain access to SIEF (However, a ‘non paying area’ is available to view limited information) Payment mode: –Credit card (for one SIEF): direct access –Purchase order / Invoicing: Pay in advance for multiple substances (Credit amount managed by the system) ‘Early birds’ – PO before 1 July 2008 (tbc): Discount if Purchase Order >= 3000€ Discount for SMEs will be reviewed by end 2008 User RoleBase Fees Pre-registrant Additional person for a Legal Entity /SIEF 300 € 150 € Registrant Additional person for a Legal Entity /SIEF 300 € 150 € Invited Expert150 € Data Holder150 €

DI conference – 28 May page 26 SIEFreach Agenda: –Introduction / Background –System overview The overall process Data transfer from ECHA REACH-IT system into SIEFreach Setup company structure / User accounts –How work inside a SIEF –Payment of fees –Beyond the SIEF: Joint Submission

DI conference – 28 May page 27 Registration SIEF IT system Agency Industry (Joint Submission) Dossier Preparation Pre-Registration / SIEF / Registration process IUCLID5 ECHA Pre-SIEF data is the basis for SIEF-IT system Other source (e.g. Excel) Plug-in XML conversion SIEF Data Holders Pre- Registrants Data Holder Submission Procedure Registrants Early Registrants

DI conference – 28 May page 28 SIEF IT system project After SIEF: Registration (Joint Submission): –Lead Registrant (LR) submits Registration Dossier first –Receives ‘Joint Submission token’ (ticket number) –LR distributes JS token to other JS members –JS members submit their registration dossier –Dossiers are processed at ECHA (using REACH-IT Workflow system)

DI conference – 28 May page 29 Thank you