Recent PTAGIS Accomplishments and Future Direction John Tenney, Nicole Tancreto, Craig White, Don Warf Pacific States Marine Fisheries Commission A presentation.

Slides:



Advertisements
Similar presentations
ISO Adult PIT Interrogation System Installations BPA Project Number July
Advertisements

Columbia Basin Pit Tag Information System BPA Project Number July
GENERAL SERVICES DEPARTMENT Risk Management Division Risk Management Information Systems Project Certification - Implementation Phase April 22, 2009.
LeadManager™- Internet Marketing Lead Management Solution May, 2009.
Growth and Development of the Columbia Basin PIT Tag Information System Growth and Development of the Columbia Basin PIT Tag Information System Overview.
P4 Tagging Software and MRR Data Model Preview John Tenney, Nicole Tancreto and Craig White Pacific States Marine Fisheries Commission A Presentation for.
NMFS, PTAGIS, SNKTRP, CJS and SURPH Steven G. Smith Northwest Fisheries Science Center National Marine Fisheries Service 2004 PIT Tag Workshop.
PTAGIS Program Review and Roadmap Focused on Portland Team for the 2014 PIT Tag Steering Committee Annual Meeting.
A partnership of Truman Presidential Museum & Library, Truman Institute, and the MU Design Team at CTIE Project Whistlestop.
Emerging PIT-tag Technologies Presenter: Sandra Downing Ideas and information supplied by numerous people For NPCC Fish Tagging Forum – March 22, 2012.
1 Arizona Grade 8 Science Online Field Test Test Administrator Training March 23 – April 2, 2007.
Network Redesign and Palette 2.0. The Mission of GCIS* Provide all of our users optimal access to GCC’s technology resources. *(GCC Information Services:
New Mexico Taxation and Revenue Department GenTax® Version 8 Upgrade Proposal. History: TRD implemented the GenTax system as the integrated tax system.
Software Testing and Quality Assurance Testing Web Applications.
An Overview of the REMS TA Center’s EOP ASSIST Software Application.
New PIT-tag Technologies Presenter: Sandra Downing Ideas and information supplied by numerous people (fortunately, I am sure there are a lot more new technologies.
Agile Testing with Testing Anywhere The road to automation need not be long.
Kaspersky Lab: The Best of Both Worlds Alexey Denisyuk, pre-sales engineer Kaspersky Lab Eastern Europe 5 th April 2012 / 2 nd InfoCom Security Conference.
Module 3: Business Information Systems Enterprise Systems.
PC Manager Meeting January 25, Today Updates –Next Meeting –Meeting Maker Upgrade –Windows Policy –Training –Licensing –Security –Tool Of The Month.
#acquia Commons The Open Alternative for Social Business Software Name Title Acquia Month XXth, 2011.
C A S E S T U D I E S—S T R A T E G I E S F O R S U C C E S S November 7 - 9, 2002.
Blackboard Next Generation (Version 9.1) Introduction to New Features Coming Summer 2011.
PTAGIS System Review and Roadmap for the 2013 PIT Tag Steering Committee Annual Meeting.
Using the WDK for Windows Logo and Signature Testing Craig Rowland Program Manager Windows Driver Kits Microsoft Corporation.
Development of Weir-Wall Contour-Matching PIT Tag Antennas for John Day Dam Adult Ladders PTAGIS Field Office Kennewick, Washington April 2015.
SharePoint and SharePoint Online: Today and what's next? Presented by Luke Abeling – IT Platforms.
OFC 200 Microsoft Solution Accelerator for Intranets Scott Fynn Microsoft Consulting Services National Practices.
November 27, 2007Pebble Project Agency Meetings Pebble Project Data Management Data Management Responsibilities Ensure complete and accurate field and.
GRIN-Global a global plant genebank management system Update for ARS Administrator’s Council December 5, 2012.
Tutorial 121 Creating a New Web Forms Page You will find that creating Web Forms is similar to creating traditional Windows applications in Visual Basic.
PTAGIS - TDS Tag Distribution System Doug Clough 2 December 2008.
PERSONALIZED SEARCH Ram Nithin Baalay. Personalized Search? Search Engine: A Vital Need Next level of Intelligent Information Retrieval. Retrieval of.
SMS 2003 Deployment and Managing Windows Security Rafal Otto Internet Services Group Department of Information Technology CERN 26 May 2016.
OEI’s Services Portfolio December 13, 2007 Draft / Working Concepts.
IV-3.1 JCOMMOPS SOT Technical Coordinator. 2 JCOMMOPS structure Programmes currently supported –Ship Observations Team (30% Mathieu Belbeoch) –Argo Profiling.
PTAGIS Field Operations Antenna and Gate Efficiencies Antenna efficiencies at all PTAGIS maintained sites remained near 100% (except for the BCC.
Lecture 3 Strategic E-Marketing Instructor: Hanniya Abid
P4 and Refining PTAGIS Data Model Presented at the 2014 PIT Tag Steering Committee Annual Meeting.
M4 Alpha Release August 9 th February 8th, 2006 M4 Alpha Release Modified Agenda Review M4 Objectives, General Concepts and Design Review M4 Development.
Copying distribution or use of the contents of this document is prohibited without written authorization from SafeHarbor Technology Corporation. Maximizing.
Development of Bolt-on Low Profile Overflow / Orifice PIT Tag Antennas for John Day Dam Adult Ladders PTAGIS Field Office Kennewick, Washington November.
Internet Organization Structure
Supporting NCCU’s Educational Mission – with “Real-Time” Energy Measurement & Reporting.
Performance Testing Test Complete. Performance testing and its sub categories Performance testing is performed, to determine how fast some aspect of a.
How Are Customers Using Opalis? Automate provisioning, resource allocation and retirement Extend virtual machine management to the cloud Virtual Machine.
Service Pack 2 System Center Configuration Manager 2007.
TM Vienna v2.0. TM An Overview of Vienna v2.0 Vienna 2.0 was designed to address issues that exist with test management and execution software available.
Proposed PIT Tag Antenna Arrays for Bonneville Dam PH1 Ice and Trash Sluice Way PTAGIS Field Office Kennewick, Washington June 2015.
Sprint 2 Goal Collect enough log files for calculation Automate processes to extra data (user, session, byte, and error counts) and convert them into excel.
Content Management: What Is It and Why Should You Care?
E-Marketing Strategic E-Marketing and Performance Metrics 2-1.
Parameterization is Used Consist of Loadrunner. Loadrunner allows any portion of a string to get replaced with the aid of a parameter. Parameters may.
Learn Mercury Load runner as an Online Training. The advanced reality of a digital transformation in the digital world always been on a threshold in terms.
Digital Campus: Foundation Projects
Service Delivery Dashboard: FY17 Overview
Interset Support Overview March 2017
Carleton Content Management System (CCMS)
IBM Tivoli Web Site Analyzer Training Document
Microsoft SharePoint Server 2016
ASP.NET developing web applications based on Microsoft.NET Framework.
SharePoint Essentials Toolkit
Division of Air AirCom DARM’s New Compliance and Enforcement Database and Field Inspection Tool.
External Collaboration
11/23/2018 3:03 PM © Microsoft Corporation. All rights reserved. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN.
ISI Web of Knowledge update: April 2009
Website Testing Checklist
Executives & Management
Rollout Guide Day 1 to 10 Day 11 to 20 Day 21 to 30 Day 31 to 40
AUC’s Role In Facilitating Access To Knowledge In The Arab World
Presentation transcript:

Recent PTAGIS Accomplishments and Future Direction John Tenney, Nicole Tancreto, Craig White, Don Warf Pacific States Marine Fisheries Commission A presentation for the 2015 PIT Tag Workshop

New Database Server and File Processing System Multiyear Development and Evaluation Ensure Data Continuity and Integrity Legacy System Retired October 2013 Enhanced Validation, Feedback, Performance Data loaded every 20 min In 2014 processed: ~570 thousand files 126 million rows of data

New Reporting System

Business Intelligence Platform Enhanced Reporting Features, Data and Performance Provided training, webinars and online tutorials Upgraded Internal O&M Reporting In 2014: Over 900 registered users Executed 242 thousand reports Returning 5 billion rows of data

New PTAGIS.ORG Web Site Production as of April 2013 Web Applications Tag Distribution Requests Separation-by-Code Requests PIT Tag Forecaster Integrated Analytics Usage: 12 thousand visitors 55 thousand visits thousand page views

New M4 Interrogation Software Developed exclusively for PTAGIS mainstem sites Performs Data collection and Separation-by-Code (SbyC) Evaluated in-situ 2012; Production 2013 In 2014: Operated at 27 sites (410 transceivers) Captured 9 million Observation Records 98.4% Avg. Diversion Efficiency at 6 SbyC sites

Thin Wall Pass-Through Antenna Design 2” thickness -- targeted for counting windows Reduce concrete cutting and installation costs Same detection efficiency as standard body antennas Installed at Dalles in 2013: TD1 and TD2 2014: Lower Monumental, Little Goose

Evaluation and Deployment of New Transceiver Models FS2020 Target large antennas at ladders/weirs Auto tuning features Deployed 70 as of 2014 FS3001 Deployed for 17’ x 17’ BCC antenna Replace obsolete transceiver model

Tag Inventory and Distribution New software for tag inventory and distribution Distributed 1.4M tags to 76 FWP projects in FY14

Tag Quality Assurance and Evaluation Software and Automation Innovations for QA Increase QA subsample from 1% to 3% Tag Evaluation for BPA, USACE and BOR procurement

Future Objective : P4 and MRR Enhancements Next Generation Tagging Software P4 MRR Data Model Enhancements

Future Objective: Enhance M4, Retire Legacy MiniMon

Future: Spatial Data Enhancements

Ongoing Future Objectives Security Rollout features and enhancements as requested Additional documentation and tutorials Enhance website design Link to other databases Expand web services (api.ptagis.org)

PTAGIS Staff