Facilities and Infrastructure December 10, 2014. Barletta Construction: Parent Organization In 1914, Vincenzo Barletta, a recent immigrant from Italy,

Slides:



Advertisements
Similar presentations
Construction Technologies. The study and application of building or assembling a structure. All people are affected in one way or another by construction.
Advertisements

«SOUTHEAST EUROPEAN INTERMODALITY»
HunterMaclean A T T O R N E Y S A T L A W. Hutchinson Island Chatham County- Savannahs Public- Private Partnership.
April 16, 2014 Carmeuse Lime & Stone, Inc. – Rail Industrial Access Project 1 Rail Industrial Access Program Application Briefing.
© Siemens AG 2011 Hull Offshore Wind Workshop Siemens Wind Power A/S, Thomas Mousten, Offshore Wind Americas.
1 Enhanced Use Lease Opportunities Charleston AFB, South Carolina Air Force Real Property Agency Jacklyn Crews-Diaz.
The Aleut Corporation Presentation to the Alaska Arctic Policy Commission – August 2013.
The 2011 Rail Conference: Moving Freight and Passengers in the 21 st Century Seaports and Freight Rail Eric D. Johnson Executive Director Washington Public.
ENGINEERING THE CIVIL WAY
EAGLES LEDGE ENERGY LTD
Trane’s DOE GHP Super ESPC Fort Knox Energy Program
Copyright 2010, The World Bank Group. All Rights Reserved. Transport statistics Demarcation of the domain 1.
1 Engineering Specializations. 2 Mechanical Engineering Machinery, power, and manufacturing or production methods. Design turbines, printing presses,
“Rail – The Intermodal Connection” AASHTO SCORT – Portland, ME
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Mayor Sheila Dixon’s BRACTION Plan for Baltimore City.
Maryland Transportation Authority (MDTA)
The Port of Baltimore Glossary Activity Produced by.
PUBLIC WORKS ORGANIZATION (S) by John Lisenko Definition: A public works organization is any organized system set up for the purpose of managing the physical.
America’s Port Future Ports – Annual Conference San Pedro, California June 23, 2014 Port of Los Angeles.
1 Great Lakes Observing System and Marine Operations Edison Boat Club – June 21 st, 2011 An ISO 9001:2008 Company.
Wood Pellet Furnace Wood Pellets ? ?? ?? .....
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
Lines of Business Provides full service construction and construction-related services in the USA, Canada, and internationally Primary Markets - Power.
EGT Development Overview October 14, Who is EGT Development?
Green Seattle by Jonathan Zygmunt, Kathryn Bower, Kayla Gates, & Conner TenHove.
Comprehensive Transportation Plan Burnet County Transportation Plan Overview Presented to Burnet Transportation Committee on June 18, 2008 by Brian.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
UNIVERSITY OF NAIROBI PHYSICAL RESOURCES. 1. Land University of Nairobi owns 118 parcels both on leasehold and freehold interest basis. Forty nine (49.
Investment Project Black Sea Ship-building Yard. 2 Key Information Public JSC “Black Sea Ship-building Yard” is one of the largest ship-building.
Challenges Facing Ports Today Containership capacities and containership fleet continues to expand Global economic development leading to growing world.
Campbell County Industrial Park Mueller Bldg. 2 Buildings Available Square FootageBuilding 1 – 42,000 Building 2 – 21,000 Acreage11.87 Constructed1973,
22ha site suited for industry & logistics GUGESTI, ROMANIA:
Floyds Fork Greenway Presentation of Greenway Concept & Trail Alternatives: Public Meeting #2 June 13, 2007.
THE GLADDEN PLAN. Project Overview About Belize The Gladden Plan is advanced to provide the basis upon which a new Belizean Economic Structure may be.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
GEORGIA'S TRANSPORTATION SYSTEMS. WATER Georgia’s Waterways: important inland “highways” for social, political, and economic growth. Recreation, water.
Transportation Systems
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
SWFL Mini Freight Summit October 8, :00 pm - 4:30 pm Lee County Port Authority Airport Training and Conference Center Air Cargo Lane Fort Myers.
London Dockland Development Corporation An example of urban renewal.
Missouri River Forum December 10, Janice Luchan, Regional Sales Director 2.
3840 NW Bus Evans Rd. – Prineville, OR 97754
Las Vegas…did it just happen? The strip before 1954.
Prince William County – Specialized Logistics & Supply Chain Briefing Presented By: Prince William County Department of Economic Development
Prince William County – Specialized Logistics & Supply Chain Briefing Presented By: Prince William County Department of Economic Development
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
Tunica Metro Mega Site ENTERGY QUALIFIED SITE Strict standards of qualification Factors identified as important Best possible conditions for a company.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
ThyssenKrupp A Company of ThyssenKrupp Steel ThyssenKrupp Steel USA, LLC ThyssenKrupp Greenfield Project June 24, ThyssenKrupp Greenfield Project.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN-07-03a & ZONING MAP AMENDMENT RZ-OTH
Many construction projects inseparable crane. How and Why They Are Raising the Bayonne Bridge Roadway The right solution To accommodate increasingly larger.
Western Rivers/ Inland/ Great Lakes
Port of Everett MASTER PLAN UPDATE April 8, 2008.
All kinds of cranes have the advantage. Longfellow Bridge: “Salt and Pepper” Towers Work More than 100 years after the last stone was set on the “salt.
Highveld Industrial Park Workshop No. 13 Information Memorandum
North Georgia Water Resources Partnership
Highveld Industrial Park Workshop No. 2 Information Memorandum
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
Renewables Capability Presentation All Energy May 2017
Highveld Industrial Park Workshop No. 4 Information Memorandum
Project Overview Woodstock Industrial Site is a premier industrial mega site. The site features up to 1,500± contiguous acres located on easily accessible.
Highveld Industrial Park Workshop No. 3 Information Memorandum
(Refer to Chapter 2 of the textbook)
Decisions on what to build: Thoughts from one who has worked on both sides Sarena D. Burch Sr. VP – Fuel Procurement and Asset Mgmt SCANA Corporation.
Construction Management & Inspection
Commissioner Marc Luiken
Cargo Solutions for Palma, Mozambique.
PORT OF EVERETT MARINE TERMINALS MASTER PLAN UPDATE
The Port of Baltimore Glossary Activity Produced by.
Presentation transcript:

Facilities and Infrastructure December 10, 2014

Barletta Construction: Parent Organization In 1914, Vincenzo Barletta, a recent immigrant from Italy, built the foundation of his own American Dream and established the V. Barletta Company in Roslindale, Massachusetts. In its fourth generation of family ownership and management, the Barletta companies' headquarters is in Canton, Massachusetts. Its two construction entities perform different categories of work. Barletta Engineering Corporation constructs water and sewage treatment facilities, gas- fired and renewable energy power plants, green roofs and spaces, and commercial buildings. Barletta Heavy Division, Inc. is focused on work such as airports, roads, highways, bridges and tunnels, public transportation projects, railroad and light rail tracks, landscaping, environmental remediation, site work and utilities. Barletta companies have a professional staff of 90, Barletta companies have a fleet of over 300 pieces of equipment, Prequalified by the Massachusetts Highway Department, Department of Conservation and Recreation, the Division of Capital Asset Management, and the Massachusetts Bay Transportation Authority. John J. Carroll / Walnut Hill Water Treatment Plant Marlborough, Massachusetts State Street Rehabilitation, Boston, Massachusetts 12/10/2014www.spshipyard.com 2

Sparrows Point Industrial Complex Established in 2004, Sparrows Point Shipyard Industrial Complex (SPSIC) is conveniently located just off of interstate 695 in the Baltimore outer harbor on the eastern side of the Key Bridge on the Patapsco River. The facility is serviced by a local rail line, the Patapsco Back River Railroad, with connections to both CSX and Norfolk-Southern. Land for lay-down, long and short-term cargo storage and other activities are available at various locations within the SPSIC, dependent upon the acreage required and other needs. Buildings are available in a variety of sizes, ranging from 10,000 sq. ft. to 100,000 sq. ft.. Buildings are available for a variety of marine and industrial uses, manufacture, assembly, storage, training and repair. Piers are available for layberthing, loading/unloading of cargo and goods, repair work and other uses. 12/10/2014www.spshipyard.com 3

Sparrows Point Industrial Complex: Site Plan Premier eastern seaboard location Located on the Patapsco River Deep water frontage Minutes from downtown Baltimore Adjacent to I-695 Rail to Norfolk Southern and CSX Key-card, gated access Acres for build-to-suits Industrial building space Crane capacity Dry dock 4000' Pier space 12/10/2014www.spshipyard.com 4

Sparrows Point Industrial Complex: Piers Pier 4 Suitable for tying up barges, no active loading Water depths 20’ south side and 18’ north side Pier 3 700’ long and 70’ wide Water depths 28’ south side and 24’ north side Pier ’ long and 60 ‘ wide Water depths 30” south side and 40’ north side Serviced by a 50 ton long boom Clyde crane Electric and water available 12/10/2014www.spshipyard.com 5

Sparrows Point Industrial Complex: Slipways Slipway 7 Has Concrete floor angled to enable large barges and small vessels to be pulled dry and out of the water using a series of hydraulic winches 12/10/2014www.spshipyard.com 6

Sparrows Point Industrial Complex: North Yard This versatile area is suitable for: Available as a build-to-suit in excess of 50 acres Staging Storage Assembly 12/10/2014www.spshipyard.com 7

Sparrows Point Industrial Complex: Graving Doc k Sparrows Point Shipyard Industrial Park has one of the largest, privately-owned graving docks on the east coast. At 1200’ by 200’ with a depth of 28’, the Graving Dock can accommodate a wide range of vessels for repair, construction, and recycling. For vessels with deeper drafts, the graving dock can be super-flooded to accommodate slightly deeper drafts. Each side of the Graving Dock is serviced by a 200- ton Clyde crane. Electric, fresh water and sewer services are available at the dock. The graving dock can also be used as a wet birth for loading and un-loading cargo with large capacity cranes and generous area around the basin. 12/10/2014www.spshipyard.com 8

Sparrows Point Industrial Complex: Graving Dock The Graving Dock also has a mid-gate, which can be installed in either one of two locations at approximately 400’ intervals, which allows for wet and dry work to occur simultaneously. 12/10/2014www.spshipyard.com 9

Sparrows Point Industrial Complex: Graving Dock The Graving Dock has also historically been used and is available for use in other construction activities, such as tunnel segment construction and other large components more easily transported via barge or water. 12/10/2014www.spshipyard.com 10