EAGLES LEDGE ENERGY LTD

Similar presentations


Presentation on theme: "EAGLES LEDGE ENERGY LTD"— Presentation transcript:

1 EAGLES LEDGE ENERGY LTD

2 Eagles Ledge Energy Ltd is a privately held, diversified energy company focused on the development of petroleum and renewable energy projects. Identifying productive resource areas, securing land development rights and utilizing the most technologically advanced methods to capture energy distinguishes Eagles Ledge from the competition. Our projects follow a strict protocol to ensure that each area is developed with a key focus on the environment.

3 HYDROCARBON EXPLORATION AND INFRASTRUCTURE DEVELOPMENT
Eagles Ledge Energy finds success through the energy, resourcefulness and determination of our team. Our business is built on long term relationships, and a commitment to making a real difference in bringing energy solutions today, to satisfy the demands of tomorrow. Our mission is to explore, develop and produce essential sources of energy. Global energy demand is growing, and is vital to progress everywhere. HYDROCARBON EXPLORATION AND INFRASTRUCTURE DEVELOPMENT WIND ENERGY GEOTHERMAL

4 EAGLES LEDGE PETROLEUM
The Eagles Ledge Petroleum team brings a long and successful history of identifying and exploiting viable fossil fuel development projects.. To reduce environmental pact and increase energy yield, we implement the latest technologies.

5 North Dakota’s Energy Environment
2nd largest oil producer in the United States generating approximately 1 million barrels per day (“BPD”) The State currently has only one operating refinery and another slated for production in December 2014 with a refining capacity of approximately 100,000 BPD The State’s pipeline infrastructure is insufficient to transport excess oil to other refineries out of state. Approximately 70% of oil production is currently exported via rail

6 Local sales of ultra low sulfur diesel recently exceeded 50,000 BPSD compared to the State’s current production levels of approximately 20,000 BPSD, and demand is only expected to increase with development The shortage of refining capacity creates a unique opportunity in North Dakota for upgrading Bakken Crude into low-sulfur diesel displacing current imports

7 American Dakota Refinery LLC
Eagles Ledge Energy has established American Dakota Refinery LLC to engineer, build and operate the proposed refinery project in Devils Lake ND US based entity with Corporate operations in North Dakota

8 Operational Management
Dr. R.G. Bailey, Chief Executive Officer Dr. Bailey, formerly President of Exxon, Arabian Gulf Region, will oversee the planning, engineering and construction of the refinery and its continued operation. Dr. Bailey brings a lifetime of experience to Eagles Ledge with well over three decades in the petroleum industry  with extensive engineering, management and senior executive assignments, Dr. Bailey's experience ranges in all aspects of the industry, both upstream and downstream, with particular middle east onshore and offshore skills. Dr. Bailey is responsible for all Eagles Ledge Petroleum business interests including management of exploration and production in addition to providing support to supply, marketing and chemicals.

9 Engineering Design and Construction
Robert Woolley, Vice President of Engineering Over 30 years experience designing, constructing, commissioning, and operating gas processing and oil refining plants. Home office, design office, and field work with direct line responsibility. Thorough knowledge of economic sensitivities related to projects as well as plant operations led to the application of innovative techniques, including management principles and modular construction. This unique technology has been applied in recent years to clean fuels refinery additions.

10 TRIAD ENGINEERS LTD Triad Engineers Ltd. will serve as engineering, procurement and construction managers (EPCM), bringing extensive experience with designing, constructing and completing refineries and critical stages of the refinery process. Triad designed, constructed and completed the last grassroots refinery in the US. The company has a history of successfully managing the technology and selection of equipment to control the capital and operation costs.