NOTE This file contains the PowerPoint presentation for the significant changes to the JFMM with the exception of the Nuclear Addendum section (Part II.

Slides:



Advertisements
Similar presentations
Andy Alderson – Head of RINA UK Chairman IACS EG/Coatings
Advertisements

COMPANY MAINTENANCE MANUAL
NetJets Training NJA General Maintenance Manual
MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
LATA Environmental Services of Kentucky, LLC Process for Approved Supplier Selection and Evaluation ASME NQA (and Addenda through 2007), Part I.
Reliability Centered Maintenance Condition Based Maintenance
Plans, Specifications and Estimate (PS&E) Kelli Sparkman Local Agency Liaison, Region 3 January 30, 2009.
General Authority of Civil Aviation 1 Air Carriers & Operators In Saudi Arabia Saudi Arabia has made a decision to liberalize the Civil Aviation Market.
ACADs (08-006) Covered Keywords Byproduct material, source material, controller, custodian, ORM, sealed source, exempt source, special nuclear material.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
SUBSAFE Approved for Public Release
Downloaded from MAINTENANCEREQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS.
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
FIBER OPTIC STATUS TMDE Program Life Cycle Conference November 2003 Robert A. Throm NSWCDD Code B35.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
This file contains the PowerPoint presentation for the significant changes to the JFMM. It has been designed to work with a Word document file that provides.
TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT Ed Freeman Engineering Manager 1.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
Bridge Engineering Section Bridge Rehabilitation.
Review of Draft AC 021 – Maintenance Contracting Draft AC 022 – Task and Shift Handovers Nie Junjian Airworthiness Inspector COSCAP-NA.
Page 1 Introduction of new European Requirements on Continuing Airworthiness (Not yet published) The presentation is based on the final draft. Franz Graser,
EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed.
NE 127 – Codes, Standards, and Regulations NDT & QA/QC Standards: ISO, ANSI, ATA, AIA, IEEE, etc. INSTRUCTOR: Chattanooga State CC.
Implementing the New Reliability Standards Status of Draft Cyber Security Standards CIP through CIP Larry Bugh ECAR Standard Drafting Team.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
The Guide to the Software Engineering Body of Knowledge
SPED Certification Program September 17, 2003 Houston, TX.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
This file contains the PowerPoint presentation for the significant changes to the JFMM applicable to all Volumes with the exception of the Nuclear Addendum.
Inoperative Equipment And Minimum Equipment List
POLICY & OVERSIGHT DIVISION (POD) February 2014 MILESTONE ACQUISITION PLANS TRAINING 1.
Water Legislation Impacts on First Nations March 10, 2010 Hilton Hotel & Suites, Niagara Falls, Ontario Ontario First Nations Technical Services Corporation.
Aviation Maintenance Management
DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets Catherine Santana Deputy Director, Project Management Systems, OECM.
U.S./Europe International Aviation Safety Conference By: Date: “Global Aviation Safety Processes: Refining Reinforcing, and Streamlining” Federal Aviation.
IAEA School of Drafting Regulations Transportation regulations in Republic of Latvia Radiation Safety Centre (RSC) Marcis Slavinskis Vienna, 3-14 November.
GOALS & OBJECTIVES Set forth criteria for safe torch down roof system applications. Define & understand acceptable thermal barriers. Educate on safe torch.
NQA-1 Evolution 2008 – 2015 Mike Nicol DOECAP ASP Workshop Sept
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
BACKGROUND NSTM 300 was completely re-written to clarify and update requirements for today’s increasingly complex shipboard electrical systems. The enclosed.
ASNE Dinner Brief RDML Bill Galinis 26 February 2014.
Chapter 8 Final Construction Final construction in the SDLC Construct and test programs Construct and test the database Obtain additional hardware Prepare.
HPT Rev. 0 Page 1 of 28 TP-1 TVAN Technical Training Health Physics (RADCON) Initial Training Program Radioactive Materials Handling and Accountability.
Chapter VII Alternative certification January Maritime Training & Human Element Section IMO Familiarization with the 2010 Manila Amendments.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Agreement concerning the adoption of uniform conditions for periodical technical inspections of wheeled vehicles and the reciprocal recognition of such.
Chapter 6 Requirements for a Maintenance Program.
Swissmedic Swiss Agency for Therapeutic Products Hallerstrasse 7 CH-3000 Bern Workshop 2 - Paragraph 13 TPA 2nd Follow-up Information.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
THE VALUE (SUPPLY) CHAIN STRETCHES FROM THE BEGINNING OF YOUR SUPPLIER’S SUPPLY CHAIN THROUGH ALL OF YOUR PROCESSES THAT CREATE VALUE FOR YOUR CUSTOMERS.
NOTE This file contains the PowerPoint presentation for the significant changes to the JFMM. It has been designed to work with a Word document file that.
Milestones, Definitions, AIT Work Integration, Quality CNRMC C300 / SEA Ted Sanders / Dale Davis.
School of Drafting Regulations Transportation regulations in
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
NAVSEA Material Fraud and Counterfeit Materiel Manager
Career Information Management System (CIMS)
NSTM 074 VOL 3 (SERIES) FAMILIARIZATION
Contract Award Procedures
Proposed Revision of: NSTM 631 Rev
AIRWORTHINESS OF AIRCRAFT
Air Carrier Continuing Analysis and Surveillance System (CASS)
THE AFILAND CIVIL AVIATION (AIR NAVIGATION SERVICES) REGULATIONS, 2009
Accreditation: Working towards the self-study
Presentation transcript:

NOTE This file contains the PowerPoint presentation for the significant changes to the JFMM with the exception of the Nuclear Addendum section (Part II of Volume V). It has been designed to work with a Word document file that provides the specific changes. The pages of this file correspond to the Word document file included on this CD-ROM (JFMM Training Notes.doc).

COMUSFLTFORCOMINST 4790.3 Rev C Change 1

JFMM Volume I NEW CONSTRUCTION

New Construction Gas Turbines Supervising Authority: Pre-Commissioning: New responsibility prior to turning operational control of a gas turbine over to Ship’s Force. Inspection/Certifications/Assists: New responsibility prior to turning operational control of a gas turbine over to Ship’s Force. Pre-Delivery: Volume I, Chapter 2, Paragraph 2.4.1; Volume I, Chapter 3, Paragraph 3.3.16;

INTEGRATED FLEET MAINTENANCE JFMM Volume II INTEGRATED FLEET MAINTENANCE

CNO Availabilities Availability Work Package Content Forces Afloat to review AWP SF/PMT actions. Availability Work Package Development Surface Force ships require NSA Chief Engineer to review requested growth and new work for technical compliance. New Work Approval Surface Force ships require Flag Officer approval for new work. Ships Force Review of AWP Ships Force Review NAVSEA 07T/PMT Actions . Volume II, Part I, Chapter 3, paragraph 3.4.3.1; Volume II, Part I, Chapter 3, paragraph 3.4.3.3; Volume II, Part I, Chapter 3, paragraph 3.6.7.c Volume II, Part I, Chapter 3, Appendix D;

Fleet Maintenance Availabilities CMAV Departure and Assessment Conference Conference Report to be provided to the Type Commander. Sea Trials Requirement (IDD & PIRA) New requirements for Trim and Drain pumps and MBT vent valves. Volume II, Part I, Chapter 4, paragraph 4.6.3.2.e; Volume II, Part I, Chapter 4, Appendix Q 3.b(13)

Ship Work Package Preparation Milestones Amplified milestone instructions. Advance Planning Status Messages Now at the completion of the Integrated Planning Conference. Volume II, Part II, Chapter 2, Paragraph 2.5; Volume II, Part II, Chapter 2, Paragraph 2.7;

JFMM Volume III DEPLOYED MAINTENANCE

JFMM Volume IV TESTS AND INSPECTIONS

Diesel Engines Component Certification (Aircraft Carriers only) Evaluation of specific deficiencies. Engine Operating Hours Modified the Requirements. Volume IV, Chapter 4, Paragraph 4.3.6.6; Volume IV, Chapter 4, Paragraph 4.5.d;

Work Authorization and Control (Submarines Only) SOSMIL Unexpected Draft Change greater than three inches. Ships In Drydock Submarines Under JFMM Controls. Barrier Criteria Submarine Hull Penetrations. Volume IV, Chapter 10, paragraph 10.4.8.b(15); Volume IV, Chapter 10, paragraph 10.4.9; Volume IV, Chapter 10, Appendix D;

JFMM Volume V QUALITY MAINTENANCE

Quality Maintenance Processes Controlled Work Packages Reactor Plant/Nuclear Support Facility/Controlled Industrial Facility Requirements. Ship’s Force Work Center Designations. Volume V, Part I, Chapter 2, Paragraph 2.2.4.b; Volume V, Part I, Chapter 2, Paragraph 2.3.3.1.j(2);

In-Process Controls Submarines Only Unscheduled Visual Inspections Submarine Tank UVI’s Clarified. SUBSAFE REC Exception List Modified NOTE (1) & (2). Certification Continuity Report Clarified Report Delivery. Volume V, Part I, Chapter 5, Paragraph 5.8.3.d; Volume V, Part I, Chapter 5, Table 5-14; Volume V, Part I, Chapter 5, Paragraph 5.10.8.a

Testing Requirements Valve Seat Leak Tests Hose Testing Hatch Repair Modified to Match Higher Level Instructions. Hose Testing Modified Instructions Hatch Repair Clarified Which Hatches are Applicable. Volume V, Part I, Chapter 7, Paragraph 7.5.3; Volume V, Part I, Chapter 7, Appendix B Note 25; Volume V, Part I, Chapter 7, Appendix B Note 33;

Audits, Surveillances, Evaluations, Assessments Reporting Requirements Clarified Expectations. Submarine QA Assessment Evaluation Criteria Added a New Appendix Volume V, Part I, Chapter 9, Paragraph 9.4.1; Volume V, Part I, Chapter 9, Appendix D;

VOLUME VI MAINTENANCE PROGRAMS

Periodic Maintenance Requirement Program Modified the Following to Reflect Current Process Schedules. Calldown/Brokering. Accomplishment. SUBMEPP Responsibility. ISIC Responsibilities. FMA Responsibilities. Commanding Officer Responsibilities. Volume VI, Chapter 24;

CONTRACTED SHIP MAINTENANCE VOLUME VII CONTRACTED SHIP MAINTENANCE

Availability and Project Management Modified the Following to Reflect Current Process Ashore Ships Maintenance Manager. Growth and New Work. Volume VII, Chapter 7, paragraph 7.3.3; Volume VII, Chapter 7, Paragraph 7.10.2.b;