Presentation is loading. Please wait.

Presentation is loading. Please wait.

FIBER OPTIC STATUS TMDE Program Life Cycle Conference 04-06 November 2003 Robert A. Throm ThromRA@nswc.navy.mil NSWCDD Code B35.

Similar presentations


Presentation on theme: "FIBER OPTIC STATUS TMDE Program Life Cycle Conference 04-06 November 2003 Robert A. Throm ThromRA@nswc.navy.mil NSWCDD Code B35."— Presentation transcript:

1 FIBER OPTIC STATUS TMDE Program Life Cycle Conference November Robert A. Throm NSWCDD Code B35

2 Expanded Fiber Optic Repair Reporting
Established As Part Of The 3M Process Currently Active In OMNS-NG Need For Process: Support equipment requirements Validate training requirements Need your help to get the process implemented throughout the Fleet

3 Addendum To Section III - Completed Action
9 Maintenance Action Completed; FO (Fiber optic repair) Capability Utilized. A: FOTE, multimode ST MQJs utilized B: FOTE, multimode heavy duty MQJs utilized C: FOTE, multimode rotary mechanical splice MQJs utilized D: FOTE, single mode ST MQJs utilized E: FOTE, single mode heavy duty MQJs utilized F: FOTE, multimode specialty MQJs utilized G: FOTE, single mode specialty MQJs utilized H: FOTE not available I: Standard MQJs not available J: Specialty MQJs not available Ø     If the maintenance cannot be placed against a specific prime system, use the FIBER OPTIC APL: /Miscellaneous Parts-Kits List. Block 29 ACT. TKN: Enter the code that best describes the action taken to complete the maintenance.   Code Description

4 Training and Maintenance
Option Being Investigated By Center For Surface Combat Systems To Include FO Maintenance Technician Course Into 2M Program Revise NSTP To include NAVAIR and submarine requirements To update surface requirements as required Revise NSTM To be consistent with the Maintenance Plan and new fiber optic technology hitting the Fleet Develop new Fiber Optic Tech Manual containing procedures referenced in the NSTM

5 Training and Maintenance
Revise Fiber Optic Training Curriculum To be consistent with Maintenance Plan and NSTM Organizational and Intermediate level To include NAVAIR requirements To cover new fiber optic technology hitting the Fleet Single mode fiber Blown Optical Fiber (BOF) Technology Extended to a 2 week course with a secondary NEC

6 GPETE Fiber Optic Fielding Plan
Develop Database Documenting Support Equipment Requirements Database established in FY01/updated in FY02 Includes system listing for each ship Includes FO system configuration information Includes GPETE and support equipment requirements Ship/system data is being verified with CDMD-OA Test Equipment Allowances Required test equipment based on information in database Fleet constraint: minimum equipment quantities to each hull Supplied to NWS Earle for incorporation into SPETERLs Toolkit and MQJ Allowances Required toolkits and MQJs based on information in database Adjusted to be consistent with minimum equipment quantities Supplied to NAVICP for development of AELs (completed)

7 GPETE Fiber Optic Fielding Plan
Support Equipment Will Be Fielded On A Prioritized Basis Multimode equipment Loan pools will be fielded first Deficiencies are being filled in the out years Single mode equipment Loan pools only being fielded Platforms to borrow assets until significant amounts of single mode fiber is utilized Ships With Deficiencies Or Insufficient Allowances Are To Borrow From The Regional Loan Pool (in port) Or The Carrier Loan Pool (at sea) Systems Backfitted on AEGIS Ships Have Deficiencies Flagged During SAR Process, Allowing Reprioritized Distribution

8 FO TE Class Allowances

9 New Technology Fiber Optic Power Meter Probe Visual Leak Detector
Submitted and accepted as a SBIR Phase I - May thru Nov 2004 Phase II thru 2006 Phase III - Private or Program Funding, If Required, No SBIR Funding Goal is to develop a more functional fiber optic power meter that could be better used for troubleshooting Visual Leak Detector Provide a visual leak detector that meets similar requirements as the optical leak detector (next generation leak detector) Receiving requests from ISEAs Provide an easier/faster means of troubleshooting Need to coordinate market survey with next contract release for optical leak detector (new contract ??) Provide to Fleet through attrition of optical leak detector

10 Documentation Maintenance Plan NSTM Fiber Optic Tech Manual (new) NSTP
SE006-AA-PLN-010 (1 Sep 2000) NSTM S9086-PF-STM-010/CH-408 (31 Aug 1994) In revision Fiber Optic Tech Manual (new) In development NSTP Revision of NTP S FO Maintenance Technician Course A AELs (tool kits) (multimode fiber MQJs) (singlemode fiber MQJs) (singlemode fiber MQJs – enhanced polish)

11 Documentation NAVSEA Drawings
NAVSEA Drawing (Tool Kit, MIL-C-83522, Fiber Optic, Navy Shipboard) NAVSEA Drawing (Tool Kit, MIL-S-24623, Fiber Optic, Navy Shipboard) NAVSEA Drawing (Tool Kit, MIL-C-28876, Fiber Optic, Navy Shipboard) NAVSEA Drawing (Tool Kit, Fiber Optic, Navy Submarine) NAVSEA Drawing (Jumpers, Test Equipment, Fiber Optic)


Download ppt "FIBER OPTIC STATUS TMDE Program Life Cycle Conference 04-06 November 2003 Robert A. Throm ThromRA@nswc.navy.mil NSWCDD Code B35."

Similar presentations


Ads by Google