MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.

Similar presentations


Presentation on theme: "MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010."— Presentation transcript:

1 MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010

2 MPMP Power Supply 2 Nuclear Power Facilities- Safety is Key 45 inch steel-reinforced concrete 1/4 inch steel liner 36 inch concrete shielding 8 inch steel reactor vessel nuclear fuel assemblies Multiple Layers of Safety

3 MPMP Power Supply 3 Industry Activities Industry Activities l Licensing risk is a key issue for the industry to move forward with actual plant orders l Previously separate construction and operating licenses were required – No certainty provided by this process – Many physical changes were required prior to receipt of operating licenses – Costs increased due to schedule delays and rework required l Industry has adopted new process which results in combined construction and operating license

4 MPMP Power Supply 4 New Licensing Process provides regulatory certainty Licensing decisions finalized before major construction begins Inspections to verify construction Limited work may be authorized before license is issued Pre-Construction Construction Verification Early Site Permit Standard Design Certification Combined License Review, Hearing, and Decision Verification of Regulations with ITAAC Reactor Operation Decision Optional Pre-Application Review New page 23

5 MPMP Power Supply 5 Industry Activities Industry Activities l Industry has adopted several standard designs l Westinghouse AP 1000 (design certified 1/2006) l General Electric ESBWR l General Electric ABWR (design certified 5/1997) l Areva US EPR l Mitsubishi US APWR

6 MPMP Power Supply 6 New Technology - Advanced Reactor Characteristics lSafety –Use of passive safety systems –Gravity flow and natural circulation designs for cooling lDesign –Reduced number of components and bulk commodities –Eliminate pumps and valves previously needed –Use digital controls and fiber optic cables lProcurement –Standardization of components based on NRC approved design

7 MPMP Power Supply 7 Fewer Components Reduce Plant Costs Confidential and Proprietary 70% Less Cable 45% Less Seismic Building Volume 80% Less Pipe 35% Fewer Pumps 50% Fewer Valves

8 MPMP Power Supply 8 New Technology - Advanced Reactor Characteristics lConstruction –Extensive use of modular construction improves quality and reduces on- site construction requirements –Digital controls reduce size and complexity of systems –Shorter construction schedule lOperation and Maintenance – Use of proven systems and components – Man-machine interface advancements – Fewer systems to maintain and test reduces staff

9 MPMP Power Supply 9 Smaller and Simpler than Current Plants 74147A Sizewell BAP1000

10 MPMP Power Supply 10 l What makes Nuclear attractive? – Fuel volatility, both gas and coal, is a major concern – Fuel transport and supplies are showing signs of capacity constraints – Environmental compliance measures are increasing cost of coal base load resources – Regulation of carbon dioxide (CO 2 ) emissions is gaining traction – New licensing process expected to allow cost control – New design units are smaller and less costly to construct Economics

11 MPMP Power Supply 11 Costs of Competing Fuels

12 MPMP Power Supply 12 Plant Vogtle Reactor Containment Bldg. Cooling Towers Turbine Bldg. Electrical Switchyard

13 MPMP Power Supply 13 Plant Vogtle Expansion

14 MPMP Power Supply 14 Schedule Overview S/U ConstructionLWA ActivitiesPre-Construction NRC COL Review 3-31-08 COLA Preparation 4-8-08 EPC Contract Signed PSC Certification Process (complete) ESP PreparationESP and LWA Review 2006200720082009201020112012201320142015201620172005 08-15-06 ESP and LWA Received 8-26-09 PSC Certification received 3-17-09 COL Received Fall 2011 COD U3 4-1-2016 COLA Submitted Commercial operation date is April 2016 & 2017 for Units 3&4 As of 6/30/2010

15 MPMP Power Supply 15 Permit and License Activities l Early Site Permit Submitted to NRC in 2006 Issued by NRC August 2009 First to include Limited Work Authority l Combined License Application COL Application Filed in March 2008 Application Under Review at NRC Anticipate License in Fall 2011 Vogtle Named Reference Plant

16 MPMP Power Supply 16 20092010 2011 2012 PSC Certification LWACOL Pre Certification Pre Construction LWA COL Surveying Subsurface Exploration Environmental Protection Site-clearing Demolition & Relocation of existing facilities Construction of training & storage buildings Excavation of the nuclear island Back Fill Waterproof Membrane Rebar Basemat Concrete Safety Related Construction Onsite Workers Vogtle 3 & 4 Construction Phases

17 MPMP Power Supply 17 Construction Activities – Module Assembly Building

18 MPMP Power Supply 18 Construction Activities Steam Generator Head Circulating Water Pipe Reactor Vessel Head

19 MPMP Power Supply 19 Construction Activities – Foundation Excavation and Backfill

20 MPMP Power Supply 20 Chinese Construction AP1000 Sanmen U1 Nuclear Island

21 MPMP Power Supply 21 Questions