Why London needs the Thames Tunnel IEMA Conference 2011 Optimising Infrastructure within environmental limits Tuesday 15 November 2011.

Slides:



Advertisements
Similar presentations
Interfacing Risk and Systems Engineering – Left Shift Risk Management
Advertisements

GREEN PAPER "TOWARDS A NEW CULTURE FOR URBAN MOBILITY" EUROPEAN COMMISSION.
Transport Study to support an impact assessment of the Urban Mobility Package on SUMPs CoR Meeting June 13 DG MOVE.
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
ASSESSMENT & PLANNING FOR POST-DISASTER RECOVERY OF COMMUNITY INFRASTRUCTURE United Nations Development Programme Bureau for Crisis Prevention & Recovery.
© UKCIP 2011 Learning and Informing Practice: The role of knowledge exchange Roger B Street Technical Director Friday, 25 th November 2011 Crew Project.
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Biodiversity and the Thames Tunnel Stephanie McGibbon, EIA Manager 12 May 2011.
The London Tideway Tunnels Creating a cleaner, healthier River Thames Sian Thomas, Thames Tunnel Project Manager 14 October 2008.
Strategic Environmental Assessment: Where does Hong Kong stand? LAM Kin Che Chairman, Advisory Council on the Environment Head, Department of Geography.
Dr Chris Boomer Development Plans Manager (DoE Northern Ireland)
Workshop on Infrastructures Key research to solve mobility barriers Claude Dumoulin Bouygues Travaux Publics (France) reFINE core team Industrial Technologies.
Strategic Environmental Assessment (SEA) Manual Environmental Protection Department H. M. Wong 18 June 2005.
ENVIRONMENTAL ASSESSMENT SEA Jamie Byfield SEA Technical Officer HRA & EIA Cara Davidson Policy Manager.
Barriers to the Delivery of Sustainable Transport Solutions Final workshop of the DISTILLATE programme Great Minster House, London Tuesday 22 nd January.
Road development in an age of austerity Graham Dalton Chief Executive, Highways Agency CIC February 2012.
Air Quality and Land Use Planning Land Use Consultants 11 th March 2008 Susanne Underwood.
CONDITION APPRAISAL AND REMEDIAL TREATMENT CIRIA Research Project RP692 MASONRY AND BRICK ARCH BRIDGES:
Sustainable growth and water cycle studies Andy McConkey, principal consultant, Halcrow Paul Hickey, growth and equivalence manager, Anglian Water Gerard.
MTF Rail Development Forum
ENVIRONMENTAL MANAGEMENT PLAN
Water Cycle Strategies An integrated approach? Dr Jon Hillman, Scott Wilson Paul Hunt, Sustainable Development Delivery Team, Environment.
ARTSA Improving Heavy Vehicle Safety Summit Chain of Responsibility and its potential to improve safety Marcus Burke National Transport Commission 16 April.
Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
Environmental Impact Assessment (EIA): Overview
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
EIA’s Environmental Impact Assessments. EIA’s Required in many countries before any kind of development takes place Determines The type and degree of.
Reducing ITS Project Risk By using and developing consensus based regional ITS architecture and a systems engineering process Robert S. Jaffe, Ph.D., CSEP.
 Scotland’s National Transport Strategy A Consultation.
Consultant: CMDC Joint Venture Key principles and effectiveness of EIA.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
COastal REsearch & POlicy INTegration Title Loction Date LOGO The development of the Severn Climate Change RAG Dr Rhoda Ballinger.
EIA for the proposed Desalination Plant North of Swakopmund: Social Impact Assessment.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
The Relu Programme and Animal and Plant Disease Management.
The Stratford City Development: Long Term Health Effects of Major Development Projects 5th April 2006 Rebecca Morgan 7th International HIA Conference Cardiff.
Planning Scotland’s Seas consultation Seas Consultation 2013.
INNOVATION ON THE THAMES NOVEMBER 2015 ANDY MITCHELL CBE, CHIEF EXECUTIVE OFFICER.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
Environmental Priorities for the Thames Gateway, 23 February 2016 Thames Vision: Goals & Actions Katherine Riggs, Port of London Authority.
‘People, Homes and Jobs’ Local Plan Consultation 2015 PPCLG 27 January 2016.
Industry Briefing 25 May 2016.
Insert the title of your presentation here Presented by Name Here Job Title - Date How can we make London’s transport network resilient to climate change?
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
EIA (Environmental Impact Assessment)
BUILDING FOR 22ND CENTURY LONDON
Chairman of Road Infrastructure Agency Management board
Stage 2 Light Rail Transit Program “In the ground ready”
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Fishermans Bend Draft Framework Transport Recommendations
KEYNOTE STAGE SPONSOR.
Local Asset Management Pilots Scheme
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
LEAN DECISION MAKING CHOOSING BY ADVANTAGES PhD Randi Christensen, Head of Lean, Value Management and Innovation, Lower Thames Crossing, COWI.
Guidance on application of Article 4.7
Environmental Impact Assessments
Addressing the challenge of water scarcity and droughts
Strategic Appropriate Assessment of Spatial Plans
KEYNOTE STAGE SPONSOR.
Manilla Low Level Crossing Project
Stakeholder Engagement
Presentation transcript:

Why London needs the Thames Tunnel IEMA Conference 2011 Optimising Infrastructure within environmental limits Tuesday 15 November 2011

The ‘lost rivers’ of London

Bazalgette’s interceptor sewers

London Tideway Improvements Sir Joseph Bazalgette

London Tideway Improvements Sewer overflow point Sir Joseph Bazalgette

London Tideway Improvements Sewage Works Upgrades Sir Joseph Bazalgette Sewage Works Upgrades - Mogden

London Tideway Improvements Sewage Works Upgrades Lee Tunnel Sir Joseph Bazalgette Lee tunnel construction - Beckton

London Tideway Improvements Sewage Works Upgrades Lee Tunnel Proposed Thames Tunnel Sir Joseph Bazalgette Sewer overflow point

Putney Bridge CSO

A CSO in action

27 May 2011, Hammersmith Bridge

5 June 2011, Barnes

Why tidal flows are important

Approach to EIA Integration – EIA / Planning / Design teams co-located by geographic area (West/Central/East) Mitigation by design, facilitated by co-location and specific EIA and Design team workshops Consultation – Planning Act requirement to front load consultation

EIA and Reporting Stages Baseline Baseline Survey Reports (Autumn 2010) Scoping Position Papers (Dec 2010) Scoping Report (Mar 2011) Preliminary Environmental Information Preliminary Environmental Information Report (Autumn 2011) Environmental Statement 2012 Stakeholder Consultation

Environmental challenges London Scale of project (22 sites in 14 Local Authorities) Location of CSOs Working in the foreshore Key environmental challenges: –Traffic and transport –Noise and vibration –Air quality –Townscape and heritage

Transport We propose to: –use the river to transport 90% of excavated material from the tunnel at the main tunnel drive sites –use the river to bring in and take away the majority of bulk material used to fill the cofferdam at the foreshore sites in the River Thames –explore opportunities to use rail freight to move material to or from our sites –take into account the potential impact on the local road network.

Approach to EIA - reporting Preliminary Environmental Information report (PEIR) comprises 28 volumes: –Vol 1: Introduction –Vol 2: Proposed Development –Vol 3: Alternatives –Vol 4: Scoping opinions and technical engagement –Vol 5: Assessment Methodology –Vol 6: Project wide assessment –Vols 7 – 28: Site Assessment Volumes PEIR available on website as part of Phase 2 consultation

Sustainable development Challenge of balancing the long term benefits with the short term construction effects Reuse of excavated material – options appraisal developed in discussion with Environment Agency Commitment to use of river for transportation of excavated material Early development of Code of Construction practice in consultation with EHOs Sustainability Strategy being promoted and developed by team embedded in project office, looking at whole life cycle of the project

Reasons to act now Continued overflows, causing environmental damage Continued health risk to river users Continued adverse impact on attractiveness of river frontage Risk of heavy fines being imposed on the UK Doing nothing will mean: If the Thames Tunnel is built it will still be functioning in the 22 nd century