Slide 1 MIPA Progress Presentation For SERENA Progress meeting, Santa Fee, May 2008 Prepared by Johan Svensson and Stas Barabash.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

Ray Lundquist, NASA GSFC
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
Solar System Physics and Space Technology Program at IRF-Kiruna Prof. Stas Barabash Swedish Institute of Space Physics, Kiruna.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
Comments on this template -Leave time for questions -Leave time for demonstration (at the final LRR) -Use your actual hardware in the presentation -Practice.
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
1 Update and functional test results for SWIM David McCann Solar system physics and space technology IRF, Kiruna Supervisor: Professor Stas Barabash David.
Wireless TPS Sensors Detailed Design Review February 12, 2008 Jesse Pentzer John Sochacki Brandy Holmes Chris Johnson Lucas Wells.
STARLight PDR 3 Oct ‘01 G.1.1 Rashid STARLight STARLight Thermal Tahir Rashid STARLight Mechanical Engineer (734)
SDW2005, juin, Taormina The Corot Space instrument.
Item 3: Electrified Vehicle Battery Performance & Durability EVE-14-08e Presented by: USA, Canada EVE-14 meeting April 20,
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
Onboard Data Processing Units
AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz.
MERMAG-M/MGF MGF-OS MGF-IS MAST-MGF MAST-SC PWI-SC Credit : RISH, Kyoto Univ.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
1 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June Status of BepiColombo Harri Laakso ESA/ESTEC, Code SRE-OS, Noordwijk, The Netherlands.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
PACS IBDR 27/28 Feb 2002 Digital Processing Unit1/16 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
Page 1 BepiColombo MMO Status Update For HEWG2014, June 2014.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
Stas Barabash, SSPT, Kiruna Swedish space physics workshop. Uppsala, February 26-27, 2009 Chandrayaan (Indian Moon mission) S/C DPU (SPL/VSSC) SAS (IRF/ISAS/UBe)
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
Solar System Physics Group Juice Radiation Workshop Manuel Grande.
PLATO Focal Plane Assemblies (FPA) Roser Urquí Centro de Astrobiología (CSIC-INTA)
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
Status summary of the ad-hoc discussions 29th of June 2012 oneM2M call.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
Double Star meeting ESTEC 25/26 March Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.
Pre-Workshop on Intervention of Science and Technology in Traditional Crafts Date : 14 th Dec Venue : Seminar Hall, First Floor of S & H Building.
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
Status of the SWAP instrument
Chandrayaan-2 Large Area Soft X-ray Spectrometer (CLASS)
Bill Raynor Naval Research Lab
SPF MAG Quarterly Report – Feb 2015
Brief Status SPS Prototype PSB Prototype Installed in LS1
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
Dave McComas on behalf of the ISʘIS Team
Solar Probe Plus FIELDS
Integrated Thermal Analysis of the Iodine Satellite (iSAT) from Preliminary to Critical Design Review October 20th 2016 Stephanie Mauro NASA Marshall Space.
THEMIS INSTRUMENT SUITE
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
MIPA status report (Miniature Ion Precipitation Analyzer)
Recent, undergoing and planned ESA-supported activities concerning development, use and promotion of the Geant4 toolkit E. Daly, R. Nartallo, P. Nieminen.
Nov. 19, 2009 prepared by H. Matsuhara, N. Takahashi, T. Nakagawa
Presentation transcript:

Slide 1 MIPA Progress Presentation For SERENA Progress meeting, Santa Fee, May 2008 Prepared by Johan Svensson and Stas Barabash

Slide 2 Outline Status in Chandrayaan-1 configuration MIPA Status Budgets (Mass, Power). Action item addressed during progress meeting

Slide 3 MIPA status (Ch1 configuration) SARA FM (including SWIM - MIPA in Chandrayaan-1 configuration) completed, calibrated and delivered to ISRO (Indian Space Research Organization) Bangalore, India. SWIM, CENA and DPU successfully integrated and tested on Chandrayaan-1 S/C.

Slide 4 MIPA status (Ch1 configuration) SARA package integration on Chandrayaan 1 SWIM CENA DPU SWIM on C1

Slide 5 MIPA status (1/2) DDM model delivered to IFSI (Feb. 2007) Finalization of the mechanical interfaces with ELENA is on- going Sensor mechanical design completed. Latest data package delivered during D-ISRR-2. Last EID-B update delivered Funding confirmed

Slide 6 MIPA status (2/2) Since February progress meeting, most MIPA efforts regard the thermal design. Decision to go for hot design was taken. Ti, macor and high temperature coating. Thermal tests of the coatings are planned in Mercury solar simulation chamber in Bern mid June, and at ESTEC. Manufacturing of STM starts mid May.

Slide 7 MIPA Budgets Sensor flight configuration mass: 194g. 4g increase since progress meeting due to radiator re- design Electronics flight configuration mass: neutral Power: neutral since D-ISSR (SWIM FM based)