1 THEMIS INSTRUMENT SUITE
FM4/FM5 PRE-SHIP REVIEW INTRODUCTION Davin Larson SST Lead University of California - Berkeley

2 Outline Summary of SST Status at FM1 PSR FM1-5 Configuration by SN
End-Item Data Package Final Test and Cal Results vs. Requirement Fulfillment Open Items

3 Status Current SST-DAP Status: FM1 - Delivered FM2 - Delivered FM3 - Delivered FM4 - Delivered FM5 - Delivered FM6 - Delivered (Needs memory test following conformal coating)

4 Status Current SST-Sensor Status: FM1 – (S01 & S02) Delivered FM2 - (S06 & S04) Delivered FM3 - (S05 & S10) Delivered FM4 - (S07 & S09) Delivered FM5 - (S11 & S12) Complete, Calibrated, awaiting delivery. FM6 - (S03 & S08) Refurbished, requires workmanship vibe.

5 Flight Configuration Current flight configuration of sensors and DAPs for all flight units.

6 FM1 EIDP: Sensors THEMIS SST Sensor: (Sensor1:Binder #33; Sensor2: Binder #34) Electrical Assembly Schematics Electrical Assembly Records Rework/Repair history Electrical test results QA signoffs Mechanical Assembly Mechanical drawings Vibration test results Thermal Vac test results Assembly Records. Special TVAC Acceptance Test Data.

7 FM1 EIDP: DAP THEMIS SST DAP: (Binder#2) Schematics
Electrical Assembly Records Rework/Repair history Electrical test results QA signoffs

8 SST Vibration Testing (Pictures of Probe 2 units)

9 SST Acceptance Level Dynamic Test SST Serial Number
Test Date Following Initial Build Retest Date (Rework/Redesign) 001, 002 13 Jan 05 Oct 11, 2005 (full-qual) 003, 004 22 Apr 05 Nov 4, 2005 (workmanship) 006, 008 June 13, 2005 007, 009 May Nov 7, 2005 011, 012 Nov Not needed 005, 010 Dec

10 SST Acceptance Level Dynamic Test
Per UCB THEMIS Document THM-SST-PRC-002 All 3 Axes Sine Survey, 0.5 G, 5 – 2000 Hz Sine Strength per Swales TM2430-RevD, 29 November 2004 Random Per Swales Document TM2430-RevD 12.51 G RMS 1 min duration per axis All Vibration Testing Performed at Quanta Laboratories Retesting (if required) ‘Workmanship Shake’ Validate any design changes following original Flight build shake Validate rework of any failures on previous vibration test Entire vibration protocol, single axis only Acceptance Sine Strength Specification SST Flight Unit Acceptance Level Random Specification

11 SST TVAC Testing SST Serial Number Test Date Following Initial Build
Retest Date (Rework/Redesign) 001, 002 5 Jan 05 Not needed 003, 004 28 Apr 05 006, 008 Sept 7, 2005 Dec (sensor 6 only) 007, 009 May 25, 2005 not needed 011, 012 Dec 005, 010 Dec 20, 2005 to Jan 11, 2006 (8 cycles)

12 Thermal Profile Procedure: THM-SST-PRC-003

13 SST -Magnetic cleanliness
SST Magnetic Cleanliness Testing Status All units have been tested and are nominal.

14 SST -Magnetic cleanliness
SST Sensor 07 All units have been tested and are nominal.

15 SST -Magnetic cleanliness
SST Sensor 09

16 SST -Magnetic cleanliness
SST Sensor 11

17 SST -Magnetic cleanliness
SST Sensor 12

18 SST Requirements SST Mission Requirements Fulfillment:
FM1 MR fulfillment noted in THEMIS Verification Matrix (see MSE Presentation) Integrated SST and component parts compliant with mission requirements

19 Open PFRs None

20 Recent PFRs PFR 169- Found poor ion energy response in 2 sensors. (S03 and S08). Found only in sensors that had undergone electron testing. Discovered that plasma discharges from the electron gun had inadvertently damaged adjacent ion detectors. (electron detectors where protected by foil that stopped all ions and never showed any damage.) Subsequent testing with the electron gun is done with the open (ion) detectors covered. Electron gun has also been refurbished. Swapped affected sensors with spares (S05 and S10). Replaced damaged open (ion) detectors in affected units. These are now the new spares. PFR is closed.

21 Results of Testing/Calibration
Energy Threshold vs temperature measured and acceptable Energy resolution acceptable (<13 keV at 5C). Detector gain measured and is stable over temperature. Channel crosstalk measured and acceptable (<20 keV) Attenuator functions over full operational Temp range. Heater/Thermostat Functional at < -50 C *! Magnetic moments measured and deemed acceptable. End to End performance verified. (*!) Noise susceptibility from BAU is very low now