ISP Forum – interim webcall 19 th March 2012. Confidentiality & legal statement The information contained in this Presentation slide-pack is confidential.

Slides:



Advertisements
Similar presentations
Carrier Pre-Select Meeting BT Systems Interface Roadmap
Advertisements

MFA for Business Banking – Security Questions with Reset Multifactor Authentication: Quick Tip Sheets Note to Financial Institutions: We are providing.
Web Center Certification Administration Web Center Certification Training Intuit Financial Services University.
Welcome to Sourcing 3.0 Training!
{Customer} Divisions Plan {Date} – {Version} Salesforce.com.
Introduction to Web Bill of Lading Q Proprietary and Confidential Copyright © 2005 INTTRA Inc. 2 Agenda Industry Challenges INTTRA Solution Value.
1 Take a tour of De Gruyter Online Join the rally and learn how to navigate through our website.
Wikispaces 101 Training Standards & Interoperability (S&I) Framework May 30, :00 - 5:00pm EDT 1.
BT TDM on 21CN – Consult 21 Utilities Webcall Laurie Dennard– BT Group Martin Wade – BT Design Bill Du Cann – Consult21 December 10th, 2007 Issue 1.0.
Michigan Electronic Grants System Plus
11 Simultaneous Provide. 22 Disclaimer: The information contained in this Presentation slide-pack is confidential information for discussion purposes.
Product Specialist Sage 1000 & CRM Sage UK
Current thinking. Subject to change. October 2011 BENEFITS OF BUILDING AN IN-HOUSE CONTENT DISTRIBUTION NETWORK (CDN)
Traffic Analyst Complete Network Visibility. © 2013 Impact Technologies Inc., All Rights ReservedSlide 2 Capacity Calibration Definitive Requirements.
© 2005 AT&T, All Rights Reserved. 11 July 2005 AT&T Enhanced VPN Services Performance Reporting and Web Tools Presenter : Sam Levine x111.
A Producer’s Guide to Chubb’s SMART Application Platform
HokieMart On-line Training Module
Ofcom Consumer Switching
Ofcom Consumer Switching
11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014.
Simultaneous PSTN and Broadband Provision Process Incorporating Broadband Movers Issue 5.
1 MyScouting Tools. 2 To access the new MyScouting Tools, you will need to click on the link embedded in the MyScouting Flash page. As stated in the MyScouting.
1 How Do I Order From.decimal? Rev 05/04/09 This instructional training document may be updated at anytime. Please visit and check the.
LeadManager™- Internet Marketing Lead Management Solution May, 2009.
Services Course Windows Live SkyDrive Participant Guide.
Useful Tips  How to quickly verify if you are logged on or not  Get the full navigation menu window for e- application  What is a time-out and how to.
Page 1 of 36 The Public Offering functionality in Posting allows users to submit requests for public offerings of Petroleum and Natural Gas(PNG) and Oil.
ACD Training.
TIDE Presentation Florida Standards Assessments 1 FSA Regional Trainings Updated 02/09/15.
12-CRS-0106 REVISED 8 FEB 2013 PRESENTS Payment Functionality.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
August 2014 Liver quest User Demo: Liver Quality Enhancement Service Tool (QuEST)
E-Portfolio July2014 Managing Multi-source Feedback.
1 Unit & District Tools Phase 1. 2 To access the new Unit and District Tools, you will need to click on the link embedded in the MyScouting Flash page.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Ofcom Consumer Switching
11 Ofcom Consumer Switching 17 June 2014 Bev Bytheway-Jackson WBC Product Manager Tel:
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Using the Cisco Technical Support & Documentation Website for Voice Issues.
Roadmaps Andy Wright Natalie Walker Simon Brisbourne.
Broadband Product Road Map 2012/13 H2 2013/14 H1 2013/14 H2 20C Fibre 21C Migration from 20C IPstream to 21C Wholesale Broadband Connect Release AK 17.
7 Day Self Assessment Tool (7 Day SAT) User Guide v7 (June 2015)
Individual User Logins
MSO Access Network Alerts 17 th December Background  Objective – Update on the success of a pilot to identify Major Service Outages in the access.
Partner Network Portal Anna Jones :: July 2006 Partner Training Webinar Communications Sector.
1 New actions from Oct 2012 ActionOwnerActionStatusDetail AP1 10/12 Simon Brisbourne Investigate requirement to have bills in PDF format New AP2 10/12.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 11 – 24 September 2007 Information.
BT Wholesale Customer Roadmap 1 st July 2008 Welcome Chris Booth Business Improvement Programme Graham Crane Consult21.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Training Role Module 8 – User Admin Ver. 10 Oct 2009.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
The public information campaign to communicate about the process of migration to BT’s next generation network Version 14 – 03 November 2008 Information.
1 eCoRepair New Release Slide Expanded view of Circuit Details Change to Circuit Looping text4 View of closed faults up to 30 days old5 - 7 Minor.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Upay User Guide WELCOME TO UPAY This guide is aimed to help you to use the Upay website. To launch Upay you will need to navigate to
Broadband and LLU Working Group 18 January Broadband and LLU Working Group Membership BT Industry representatives Terms of Reference To ensure a.
Clinical placement planning in 2014 viCPlace Update 112 JUNE 2014 Natarsha Knights-Lewis Information Support Project Officer.
BIM 360 Glue Migration to BIM 360 Account Administration (HQ)
Business zone Ethernet – Ordering a Radio Survey
Placing an order for Etherway Copper
How to request access to a tool on the Openreach portal
Business Zone – User Guide
Raising a Customer Controlled SFI (CCSFI) fault Version 1
Raising a Fault Version 1
Ethernet diagnostic journey explained
How to raise a fault on Business Zone
How to run the standalone diagnostics test
Presentation transcript:

ISP Forum – interim webcall 19 th March 2012

Confidentiality & legal statement The information contained in this Presentation slide-pack is confidential information for discussion purposes only and should not be disclosed without British Telecommunications plc (BT's) permission. Please treat it accordingly and do not forward, republish or permit unauthorised access. Please note that BT has taken reasonable care to check that the information contained in this Presentation slide-pack is accurate at the time of issue, however, it is subject to change. In relation to any products/services referred to in this document which are currently under development and/or trial, BT gives no undertaking or other commitment that the product/service will be made commercially available. References to any such service and time scales contained within this document are indicative and estimates for information purposes only and these and other information do not constitute any contractual or other obligation. Applicable BT standard terms and conditions apply. © British Telecommunications plc, 2012 British Telecommunications plc Registered office: 81 Newgate Street London EC1A 7AJ Registered in England no:

TimeAgenda - topicSpeaker 13.00Welcome, introductionsHelen Nurse 13.05BT Wholesale Broadband roadmap updateFraser Burton 13.10Broadband roadmap specific areas:- Weekend appointing Transfer of service update Bev Bytheway-Jackson 13.15Broadband roadmap specific areas: Cool Broadband James Lamb 13.20Service update: Latest news Order Tracker enhancements (delivered in Release AA) Tim Longden 13.30Service update: One Contact resolution Barry Wenham 13.35ServicEdge Programme: Test & diagnostic improvements Smart Phone App James Lamb 13.45ServicEdge Programme: MSE (Multi Service Edge) Ken Hayes 13.55eservices Programme: HLE capability on My Page eCo Broadband closure Barry Jacques & Chris Kerr 14.05Key dates & general information 14.10Q&A and polls 14.15Close of webcall

BT Wholesale Broadband Roadmap update Fraser Burton Head of Product Management

PRODUCT LAUNCHES: 2011 to 2012 Availability Market 1 price reductions on IPstream Connect1 st October 2011 One month WBMC-Shared contract term21 st October 2011 Real-Time QoS launch ADSL2+Nov 2011 WBC min term commitment reduce to 1 monthJan /20 FTTC Trial Dec 11, Launch early 12/13 FTTP EMD Nov 11, MDU Trial Nov/Dec 11 Launch early 12/13 In-Building Handover WBMC-SharedQ1 12/13 Change to WBMC-Shared bursting allowance from 50% to 100%Q1 12/13 Real-Time QoS EMD for FTTXQ2 12/13

PROPOSITIONS FOR GROWTH - 1 Bespoke network flexibility offers: Bandwidth consumption is rising, creating an affordability problem for CPs as this cost is not fully recoverable from EUs. Some CPs may fail to meet end- user demand, leading to churn. Additionally, planning for bursting, resilience and network capacity can lead to step changes in costs BT can help CPs to: prepare for demand growth, especially running up to the Olympics affordably grow bandwidth consumption in Market 3 spread the upfront cost of host-links, or use In-Building-Handover use 100% bursting for extra resilience or unplanned demand spikes Bespoke growth and migration offers: CPs find the LLU-to-WBC migration charge is a disincentive to bringing LLU lines onto the WBC network, and can also struggle with managing migrations from 20C to 21C BT can help CPs with: free bulk migrations from 20C to 21C managed 20C-to-21C migration forecast process free migration of LLU lines to 21C in Market 3, on attractive commitment terms

PROPOSITIONS FOR GROWTH - 2 Voice-enabled Broadband offers: CPs know broadband is not just for the internet and there is a significant opportunity for VOIP services - several CPs already operate in this market and there is real potential for growth BT is making VoIP work in a broadband world, and can help CPs with: Free RTQoS EU Access component during EMD Half price Annex M circuit for every RTQoS access purchased Bespoke offers, including CPE, IPVS, wholesale calls Enhanced and Premium care levels (20hr and 7hr fixes) Fibre growth offers: Fibre is the gold-standard for winning and retaining end users – but CPs adopting fibre find the connection charge a barrier to pricing their fibre offerings competitively BT can help CPs with: Discounted connection offer in Q1 Commitment and growth offers New 80/20 product - An addition to the existing FTTC portfolio, this will provide 100% higher download and upload speeds

Weekend Appointing/Activation Bev Bytheway-Jackson Product Manager The designs are not finalised, therefore any developments carried out by CPs based on the contents of the designs as currently exhibited are entirely at the CP’s own risk.

The Development From June 2012 we will be introducing the ability for you to request Broadband Activation at the weekend. SMPF Copper Products – IPStream, IPStream Connect, WBC ADSL/ADSL 2+ will be offering Saturday activation only at launch. Fibre Products – ProductSaturdaySundayBank Holiday Early Morning Early Evening FTTCYYYYY FTTPYYYYY Sunday Cover not available in Northern Ireland but may be considered. Bank Holiday not planned to be available in Northern Ireland. WBC FTTP not available in Northern Ireland – possible 2012 deployment

Scope The following order types will be covered; Provide with DN Simultaneous Provide/Home Movers Product Family Migration (within 21C WBC) CP Migration (within 21C WBC) *Product Family Migration (20C to 21C) *CP Migration (20C to 21C) Amends of the above order types. 20C Datastream, 20C BET, SDSL are out of scope. No changes will be made for these products. * To be confirmed

What happens today? 20C IPStream If CP places a Provide order with Customer Agreed Date as a non-working day, the order is rejected. 21C WBC If CP places a Provide order with Customer Required Date as a non-working day, the Committed date is taken as the next possible working day.

What will happen? 20C IPStream If CP places a Provide order with Customer Agreed Date as a Saturday, the order will not be rejected as long as the Lead time validations are fulfilled. Lead time calculations will still consider only working days. 21C WBC If CP places a Provide order with Customer Agreed Date as a Saturday, the order will not be rejected as long as the Lead time validations are fulfilled. Lead time calculations will still consider only working days. 21C FTTx BTW will expose a new Appointment Type = ‘Flexible’ which will allow appointments on Saturday, Sunday and Bank Holidays. For copper products we are building in the extended capability of Sunday and Bank Holiday activations but this has not been confirmed for launch. All of the above will be subject to Openreach engineering resource availability.

Summary of Changes Existing lead time calculations will still be based on working days. The charging structure will be aligned to that of our supplier with the ability to charge a separate price for Saturday, Sunday and Bank holiday activations. In case of Fibre products the weekend activation charge will be levied if you have selected Appointment Type as ‘Flexible’. In Case of Simultaneous Provide, if original CRD is of non-working day. However due to change in PSTN delivery dates, the Broadband delivery date will be moved to next available working /non-working day. This new feature will only apply to new Provision or Amend orders arriving post deployment. However if an in-flight order is Amended after this feature goes LIVE it will be considered. There will be no B2B XML changes or additional attributes added to existing request and response xmls. You will be shown information messages on Portal to indicate that there will be an additional charge if you opt for provisioning on non-working day.

BT Wholesale James Lamb Test & Diagnostics and ServicEdge Third Party Tools Lead Cool Broadband Update

CPE Interoperability Testing - Completed on 29 CPE in Dec No Issues Identified. Service Trial -3 CP’s have offered to participate. Thank you -Start delayed due to Network FOA sign off. -Network code available from w/c; 12/03 -Re-planning Service Trial from w/c; 26/03 -Service Trial to run for minimum of 6 weeks with a review at week 4. BT Cool Broadband - Trial Update

The launch of BT Cool Broadband will introduce Level 2(L2) low power mode support for our 21C ADSL2+ product, BT Wholesale Broadband Connect (WBC). This will reduce Network power consumption and emissions of greenhouse gasses. BT Cool Broadband combines 21C technology with industry technical standards to deliver our first green broadband service. This is a world first deployment and will allow us to move away from the current industry standard “always on” service, to a more environmentally friendly “always available” service. BT Cool Broadband introduces capability in the WBC ADSL2+ technology type product to support L2 or Low power mode as defined in the ITU-T Recommendation G This allows a line that is not being used, to drop down in power and reduce its bit carrying capacity. The moment more data is demanded than the low power mode will carry, the line will request the transition back to the previous full power rate. In order to support the low power mode, both ends of the circuit will require L2 mode support, i.e. from the MSAN and CPE. BT Cool Broadband (Level 2 power mode)

Q&A for Broadband Roadmap

Consumer Switching Consultation Bev Bytheway-Jackson Product Manager

On 9 th February Ofcom published their second consultation paper, the proposal is that there should be a single, unified process for consumers switching voice and broadband. Ofcom is favouring a gaining provider led process called ‘Third Party Validator’ (TPV). Ofcom may reconsider their favoured approach if they can be convinced that a losing provider led (LPL) can address the key concerns. Further consultation due in Q2/Q3 the scope of which will be determined by the responses received. Final statement planned for Q after which there is likely to be an 18 month window in which to implement the chosen way forward. Ofcom URL: voice- broadband/?utm_source=Updates&utm_medium= &utm_campaign=cons umer-switchinghttp://stakeholders.ofcom.org.uk/consultations/switching-fixed- voice- broadband/?utm_source=Updates&utm_medium= &utm_campaign=cons umer-switching

Options assessed: Existing processes options (unharmonised) Do nothing. Incremental enhancements to both the existing Gaining Provider and Losing Provider Led processes. Gaining Provider Led options (harmonised) Incremental enhancements to the existing Gaining Provider Led. Transfer Code option. Unique Service Number process. Third Party Verification process. Losing Provider Led options (harmonised) Transfer Code option (save banned). Transfer Code option (save permitted).

Key issues to address Multiple switching processes Back end system deficiencies Lack of reliability Loss of service Lack of competitive neutrality Customer consent Implications of switching Varying and unnecessary switching costs/hassle Reactive save activity

BT Wholesale Tim Longden Service Integration Manager Service update: Service Update - general Order/Fault Tracker

L2C Performance System and Supplier Issues delaying Closure Reported One Seibel system fault

T2R Performance Level performance

Enhanced Care Performance Very low volumes of FTTC E/Care

Order and Fault Tracker

BT Wholesale has recently launched an enhancement to its KCI self serve facility for WBC Copper and IPStream Orders & Faults. The enhancement allows Customers to directly access the order updates provided to BT Wholesale by Openreach delivering greater detail on the order or fault progress. Customers that are already using this facility have provided positive feedback and highlighted how it has reduced the propensity to have to make often timely further enquires. The Order and Fault Tracker is accessed through eCO (for IPStream Orders and Faults), and eCO+ (for WBC Orders and Faults).

Once a CP has logged into the URL they are given for eco BB they will have to: Click on Orders/Fault Reports and enter the eco order/fault id number or corresponding Service ID/DN number Click on Supplier Notes button on left hand side of screen Click on Request in the Supplier Notes field If there are any notes available at this time they will appear in the Error/Information Message field.

Customer logs into BTwholesale.com Click on the Applications tab Select Orders and Faults Click on Ecoplus Click on if already subscribed, click here to launch Enter username and password Click on ECOPLUS under My Applications Eco plus screen appears In order to track an order or a fault select the option you want from the dropdown..

Click on SELECT to look at the Order/Fault details A Supplier Notes button is displayed

31 Making BT Wholesale a great place to work OCR ISP forum Update Barry Wenham 13 th March, 2012

32 Introducing OCR (One Contact Resolution) OCR is simple – One Contact Resolution What we measure – repeats and looped work. Principle - Totally customer focussed Training - Empowerment to do what’s right, take risks, use common sense, fix end to end and focus entirely on the customer Launch – phased 26 th March through to end of Q1 Baseline OCR score is around 50%. Opportunities are split into 4 key areas BTW internal processes – we have changed several through pilot Supplier issues – we are working closely across a number of areas Customer issues – different practices result in a range of outcomes Our team members Revised our measurement, quality and direction to get the whole organisation fully lined up behind this. Work with customers and suppliers to help drive best practice across industry and work internally to resolve barriers quickly. I will report more specific details on OCR, the initiatives and the impacts in forthcoming events 32

Q&A for Service Update

BT Wholesale James Lamb Test & Diagnostics and ServicEdge Third Party Tools Lead Test and Diagnostics Update

Release AA – 12/02/2012 KBD using Openreach Enhanced Copper Line Test (CIDT) -Detection of HR(High Resistance) faults. CU33 = LN CU34 = CA CU35 = CE -Reduced need for use of SFI/Boost. -Reduced Repeat reports KBD using Brandenburg Techniques to enhance diagnostics (BRAT) -Codes to Improve Location for CCSFI options AN01 – Access Network Issue CD01 – Customer Domain Issue -Diagnostic codes D/N/R/E/I/B/Q/T/X Test and Diagnostics Update

New KBD Codes for BRAT KBD CodeKBD OutcomeRecommendationFlow Overview Recommendation What Does the Customer Do Next ? AN01- D/N/R/E/ I/B/Q/T/X Problem Explanation: BTW Fault Localization Analysis indicates a potential Local Access Network issue. Please check ‘Local Access Network’ tab for more information. Resolution/Recommendation: Please confirm all CP and End User checks have been completed. As Copper Line Test is OK this is a CCSFI enabled outcome. CCSFI Condition as indicated within the problem explanation but all diagnostics completed and a Local Access Network issue is indicated by the enhanced Brandenburg tool. Please confirm all End User Environment checks have been completed, Should this action not resolve the issue you can book an SFI appointment (CCSFI). CD01- D/N/R/E/ I/B/Q/T/X Problem Explanation: BTW Fault Localization Analysis indicates a potential Customer Domain issue. Please check ‘Local Access Network’ tab for more information. Resolution/Recommendation: Please confirm all CP and End User checks have been completed. KBD tests indicate no BTW network fault. This is a CCSFI enabled outcome. CCSFI Condition as indicated within the problem explanation but all diagnostics completed and a Customer Domain issue is indicated by the enhanced Brandenburg tool. Please confirm all End User Environment checks have been completed, Should this action not resolve the issue you can book an SFI appointment (CCSFI). DThe circuit is dropping connection.E An LTB issue has been identified./A historic LTB issue was identified./ No performance issues have been identified in the BTW network. N The circuit is not in synch.BThe End User has a working session. R The End User does not have an active PPP session but IP connectivity has been confirmed with the BT network. IThe End User has a working session. Q The End User does has reported potential QoS related performance issue.XThis is a DataStream circuit.

Release AA – 12/02/ Cont Performance/Speed Tester -Upgrade/Improvements to work at high Broadband Speeds >110M -Improved Testing Frequency -Subsequent test available after 10 Minutes (Following a successful test) -Up to maximum of 3 tests an Hour -Speed Tester Lite option available. Release AB (April 2012) & Release AC (June 2012) will see further upgrades to align with the Increasing speeds seen on NGA. Test and Diagnostics Update

ServicEdge Programme Smart Phone App

ServicEdge Review 14/03/12 White label app for ISPs to customise and build upon. BT Wholesale will pass the source code for the vanilla version to a CP (image shown on the right hand) Not an off the shelf working app – framework to build an app provided to CPs Allows Broadband home users to run diagnostic checks on their set up (home domain and network checks) Functionality within the app will include: Connection test (including speed test) Wi-Fi signal strength Wi-Fi channel check Wi-Fi Security check MSO / PEW checks PAT / Brandenburg data feed Support Area – Videos and tutorials Full Health Check (runs all tests sequentially) Objective is to reduce call volumes by providing end customers with information and quick fix tutorials If an issue is found, the app advises the user how to fix the issue via the support area or that there is a network fault open App has a library of offline content to fix the issue including text and videos – don’t have to be connected to the broadband to use these App framework will be available on both Android and iPhone OS for CP service trials in Q1 – please contact for more *Please note ‘Vivid’ is only a working name for the app and will be changed before launching to ISPs to BT Wholesale Broadband Checker BT Wholesale have created a source code app framework for home domain & network checks for ISP’s to build a bespoke app

Introduction of a new 21C Broadband Remote Access Server – MSE (Multi Service Edge) Ken Hayes Technology Change Manager

BT Wholesale are expanding the 21CN broadband platform by adding a new broadband remote access server (BRAS) The new BRAS will be known as the MSE (Multi service Edge) The impacts of this platform increase requires our customers to be aware of changes and what they need to do on both the WBC and WBMC products to ensure there will be minimal impact to their end users. To support any technical questions we have the following e mail account :- This account can be used to cover the technicalities of the following briefs. Example IP addressing, Tunnel queries etc For non technical queries contact your CRM or account manager

The initial internal trial will be in Bradwell Abbey which is parented to Milton Keynes 21C POSI ( Point of Service Interconnect) Internal trials have now started We will have to confirm that all WBC & WBMC Communications Providers have enabled their network to support the new tunnel end points and new NAS IP addresses This information has been shared via the notification posted on the BT Wholesale site Briefing Number: on 24 th August Briefing Number: on 12 th July 2011 What next ? WBC CP’s will be contacted and asked to complete AP CRF’s so that we can proceed with the MSE AP builds as defined in the briefs above. We will need to know whether you wish to proceed with RIPE IP addressing or select the default 172. addressing for AP Vlans and MSE loopbacks. WBMC CP’s should have now opened up their network to support L2TP tunnels from to When your end users are connected to the new MSE, the authentication request will contain a NAS IP address from the range of to If you action on the NAS address you will need to open your network to support this address range so successful authentications can take place. Trials update

Q&A for ServicEdge Programme

Barry Jacques & Chris Kerr e-Service Programme

45 eCo BB Portal & Legacy XML API Closure onto eCo Plus and Strategic B2B Gateway Overview 20c ordering & fault platform becoming outdated 20c product will continue in non WBC footprint exchanges Propose to close legacy platforms onto 21c platforms in 12 – 15 month timeframe Customer Benefits Common, simplified CP agent experience across 20c & 21c 21c functionality for all services – electronic KCIs, XML appointments, cancels and amends Support for current browser technology when accessing portal Allows CPs to view all assets, orders and faults via single portal Enables cost reduction in CPs as they rationalise their consuming systems Customer Engagement Want customers to volunteer to engage in design development and testing activity of portal and B2B capability April – Sept design activity Sept – Dec testing activity CP changeover Jan 13 – June 13 CP Agent eCoBB eCoPlus CP Systems Strategic B2B Legacy XML API 20c BB 21c BB (+20c) 21c BB (+20c) 20c BB

eCo BB Portal & Legacy XML API Closure onto eCo Plus and Strategic B2B Gateway eCo BB Customer & Account mapping 20c B2B T2R Capability on strategic B2B Gateway 14th 23rd 18th 20th ABACADAEAF Develop Customer & Account Mapping eCo BB Asset mapping Asset Mapping 20 c B2B L2C capability on eCo Plus portal 20c B2B T2R capability on eCo Plus portal Customer migration Migration Design Develop Test Design Develop Test Design Develop Test Design Develop Test Design Develop Test Design Develop Test Trial AprilOctAugJuneMarDec Trialist Migration Design Develop Test Trial TBC 20 c B2B L2C Capability on strategic B2B gateway Design Develop Test Design Develop Test Trial Outline dates – Subject to change Trialist Asset Mapping Develop Test BBCR/WCR Design Develop Test Trial

Escalations and Tags on The Line Portals Key Benefits for Our Customers: Enhancing your self serve capability on-line. Reduces the time taken to progress broadband orders or faults. Ability to track progress of escalations or Tags queries. Removes the need to call or e-chat. Available to use from Monday 26 th March. Easy Access: No need to apply - registered users of secure broadband applications will automatically be given access. Provide your own access via My Admin from mid-April. Simple to Use: Intuitive and straight-forward to use. Easy to follow step by step navigation guides available to download via the broadband library.

My Page Dashboards Tentative Go Live Date : Monday 26 th March. Features: Aligned status across broadband and data products, for both 20 and 21C networks. Filters to view by product group, product family or individual product. Graphical view by product or status Drill down view for detailed reports that can be exported. Details: Requires WCR access Updated every 3.5 hours Release AB April 15 th My Page Personalisation Standardised profiles My Admin Admin requests queue for password resets

Q&A for eServices Programme

What’s coming up? Dates for your diaries Next Fibre surgery – 26 th April via webcall (contact for details) Next ISP Forum – 8 th May – BT Tower Broadband & Content Technical

Final Q&A

Slides & replay will follow shortly Thank you for joining us on the call today