Page 1 Shipping and Billing for Related (Owned) Factories By MIS Department.

Slides:



Advertisements
Similar presentations
Module 3: Block 3 Call Management
Advertisements

Module 1: BLOCK 1 / MAIN MENU
Page 1 Cost Entry for Owned (Related) Factories By MIS Department.
CARTONIZE CUT & PRINT BOX END LABELS RLM System. Page 2 Glossary of Training Terms The following terms will be used throughout this training program:
Page 1 Inter-Company Cash Application By MIS Department.
Page 1 Pay Inter-Company Vouchers by Hand Check By MIS Department.
Shipment Tracking (In Transits) RLM System. Shipment Tracking Records Shipment Tracking records (In Transits) are posted to the system to apprise the.
Page 1 Accounts Payable Voucher Entry By MIS Department.
BASIC SKILLS AND TOOLS USING ACCESS
The Reinberger Childrens Library Center Step-by-step instructions for capturing a MARC record and adding a 658 Tag to a record.
Click to edit Master title style Page - 1 OneSky Teams Step-by-Step Online Corporate Communication Support 2006.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Prepared by: Workforce Enterprise Services For: The Illinois Department of Commerce and Economic Opportunity Bureau of Workforce Development ENTRY OF EMPLOYER.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Integrify 5.0 Tutorial : Creating a New Process
Course Objectives After completing this course, you should be able to:
1 Daily ATM/Debit Maintenance through CU*BASE A Preview of ATM and Debit Card Maintenance Screens Prepared June 24, 2009.
1 How to Enter Time. 2 Select: Log In Once logged in, Select: Employees.
© Paradigm Publishing, Inc Access 2010 Level 1 Unit 1Creating Tables and Queries Chapter 2Creating Relationships between Tables.
Microsoft Access.
“The Honeywell Web-based Corrective Action Solution”
Well-Being Icon Refer to Slide 2 for instructions on how to view the full-screen slideshow.Slide 2.
Page 1 Manual Finished Goods Receiving By MIS Department.
Benchmark Series Microsoft Excel 2013 Level 2
CREATING A PAYMENT REQUEST FOR A NEW VENDOR
1 Displaying Open Purchase Orders (F/Y 11). 2  At the end of this course, you should be able to: –Run a Location specific report of all Open Purchase.
1 How Do I Order From.decimal? Rev 05/04/09 This instructional training document may be updated at anytime. Please visit and check the.
GEtServices Services Training For Suppliers Requests/Proposals.
IG Pro & CMS.
 Departmental Administrative Specialist should verify that the vendor is not an existing vendor using XK03 in IRIS.  All NEW vendors must complete the.
Reference Guide Module 1: Getting Started August 2014.
1 Atlas Copco Distribution Center DS Connect User’s Guide This document is uncontrolled if viewed or printed outside the IMS.
TIDE Presentation Florida Standards Assessments 1 FSA Regional Trainings Updated 02/09/15.
User Friendly Item Relationship Maintenance A Family of Enhancements For iSeries 400 DMAS from  Copyright I/O International, 2006, 2007, 2008, 2010 Skip.
Windfall Web Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
What’s new in WebSpace Changes and improvements with Xythos 7.2 Effective June 24,
CFS 9.2 Upgrade Forum 1. Navigation Changes Main Menu Recently Used Re-organized Menu Cascading Menus Breadcrumbs Autocomplete 2.
Page 1 Reprint Invoice By MIS Department. Page 2 When to use Reprint Invoice The Reprint Invoice function can be used to re- create invoices that have.
Page 1 EDI Drop Ship Packing By MIS Department. Page 2 EDI Drop Ship Flowchart Factory Produces Units from FGPO Scan cartons to (virtual) container Add.
Page 1 Returns Receivings By MIS Department. Page 2 The Returns Process When a store or customer wants to return goods, they are supposed to contact the.
Page 1 Cost Approval RLM System. Page 2 Costing of Finished Goods Purchase Orders Finished Goods Purchase Orders (FGPOs) are the orders Jordache places.
Page 1 Packing Open Stock for UCC128 By MIS Department.
UPC CROSS-REFERENCE SETUP FOR FACTORIES RLM System.
Page 1 Customer UPC Cross-Reference RLM System. Page 2 Customer UPC Cross-Reference Customers (i.e., stores who purchase our goods) often have their own.
Cost Entry by MG for Directions Studio Cypress Creek System.
Page 1 Daily Receiving Inquiry By MIS Department.
Shipment / Container Tracking Inquiry By MIS Department.
Page 1 Finished Goods Purchase Order Inquiry RLM System.
RLM System Actual Cut Entry. Page 2 Glossary of Training Terms The following terms will be used throughout this training program: –Field: A box on the.
Page 1 Billing Drop Shipments RLM System. Page 2 Drop Ship Billing Drop Ship billing is very similar to Outside Contractor Billing, except that billing.
Page 1 Cash Application By MIS Department. Page 2 Enter your User ID and Password here Note: User ID and Password are initially assigned by MIS. You will.
PRINT BOX END LABELS FOR ODDS (LEFTOVERS) RLM System.
Shipment Tracking (In Transits) RLM System. Shipment Tracking Records Shipment Tracking records (“In Transits”) are posted to the system to apprise the.
Page 1 Invoice (Pick Ticket) Inquiry By MIS Department.
Finished Goods Purchase Order Entry RLM System. Finished Goods Purchase Orders FGPOs are the orders Jordache places to the factories that produce the.
Page 1 Manual Finished Goods Receiving By MIS Department.
Outside Contractor Billing Ron Lynn Management System.
Cost Entry for Non-Owned Factories By MIS Department.
Cost Entry for Non-Owned Factories Cypress Creek System.
Page 1 UPC (Universal Product Code) Inquiry By MIS Department.
Page 1 Global Sourcing By MIS Department. Page 2 What is Global Sourcing? The Global Sourcing application allows you to see the production in units and.
Order Inquiry by Style RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed using.
Order Inquiry RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed using the Order.
Page 1 Shipping and Billing for Related (Owned) Factories By MIS Department.
Page 1 Invoice (Pick Ticket) Inquiry By MIS Department.
Domestic Cost Entry and Approval RLM System. Costing of Finished Goods Purchase Orders Domestic FGPOs are orders Directions placed directly to the factories.
Page 1 GAP Force Pick Ticket By MIS Department. Page 2 Forcing Pick Tickets The Gap process requires that pick tickets be created before the goods are.
Order Inquiry by Entry Date RLM System. Page 2 What is Order Inquiry? Customer Orders that arrive in RLM (either via EDI or Data Entry) can be viewed.
Page 1 One-Line Costing By MIS Department. Page 2 One-line Cost Sheet for Style In the event that styles in stock are transferred from PPK to Open Stock.
Page 1 GAP Container Loading By MIS Department. Page 2 Gap Distribution Center Process The Factory does not ship the units to the Distribution Center.
Presentation transcript:

Page 1 Shipping and Billing for Related (Owned) Factories By MIS Department

Page 2 Glossary of Training Terms The following terms will be used throughout this training program: –Field: A box on the screen into which you enter information –Value: The information (data) being entered in the field. Example: Division number, FGPO number –Icon: An image you may click to perform a function such as select, submit or exit –(Single-)Click: Also Select. Hitting the left mouse button once. This will activate an icon or select a row in a list of values –Double-click: Hitting the left mouse button twice o the same part of the screen. Used only to select and return a value from a list.

Page 3 Using the RLM System These are the primary RLM icons you will use: – Search: Located next to entry fields. Clicking this icon brings up a pop-up window with a list of all possible values for the field (for example, the next to the Division field will show a list of all divisions) (Shift-F9 keys or F21 key) – Select: Located on the Search pop-up windows. You may click on a line and click Select to return its value to the main screen – OK (Submit): Located in the bottom right corner of each screen. Processes the information on screen and brings you to the next screen – Return (Back): Located at the top of each screen. Click this icon to go back one screen (F2 key) – Exit: Located at the top of each screen. Click this icon to return to the menu or close a pop-up (F3 key)

Page 4 Enter your User ID and Password here Note: User ID and Password are initially assigned by MIS. You will be prompted to change it the first time you login. The password field IS case-sensitive. Sign On Click OK

Page 5 Click the check (or hit the Enter key) to proceed Welcome Click here to proceed (Enter key)

Page 6 Enter your Company number If you dont enter a Company or enter the wrong number, you will receive this error: Click OK Select Application Click the Inter- Company Billing button in the menu

Page 7 Inter-Company Billing Menu Select option 1

Page 8 Available Shipments A list of shipments appears. Shipments are created when the first carton is scanned into the Container Loading program. Each PO in a container attached to a shipment has its own line Enter a PO, shipment or container number here and press F16 (or Shift- F4) to search the list

Page 9 Available Shipments The search parameter appears here Check the box that is the type you are searching for Click OK

Page 10 Select a Shipment Type S on a line to view/edit a shipment Click OK

Page 11 Update Shipment Header The shipment number is assigned by RLM and cannot be changed Edit the ship date if necessary The Warehouse number is here and is assigned based on the POs on the shipment. The number is the Primary warehouse, even if the shipment has multiple warehouse

Page 12 Update Shipment Header (continued) The cycle (MGO - ocean or MGA - air) and check point (SHP) appears here. Edit if necessary Enter payment terms here Enter the flight or vessel number here

Page 13 Update Shipment Header (continued) Enter the shipment terms here Enter Ship Via info here You may enter comments in these lines Enter O for Ocean, A for Air or click the icon to search

Page 14 Check Container Contents Type A on a line to view the container Click OK BEFORE THE LOADERS CLOSE THE CONTAINER: Check the contents of the container

Page 15 View Container on Shipment Type C to view the contents of this container. Hit the Enter key to submit

Page 16 View Container Contents The list of cartons scanned into the container appears. St of A means the carton is assigned to the container. Click More Info to see the carton numbers Use this list to check the container contents. If there is an error with the loading, notify the loaders to UNSCAN the incorrect cartons from the container

Page 17 Note: Re-Open Closed Container To re-open a CLOSED container, type S and hit the Enter key

Page 18 Re-Open Closed Container Remove the Seal # and hit the Enter key Click Return to go back

Page 19 Note: Remove Container If you want to remove the container from this shipment, type U and hit the Enter key

Page 20 Print Shipping Documents: Error Type P on a CLOSED container line to print the shipping documents and hit the Enter key P If one or more POs on the container are not closed, you will get an error

Page 21 Print Shipping Documents P If all POs on the container are closed, you will be able to print Select the document(s) you want to print Click OK to submit

Page 22 Ship and Bill Type T on a CLOSED container line to ship and bill it, then hit the Enter key T If one or more POs on the container are not closed or have Status = UNCONFI, you will get an error. UNCONFI means the cost has not been Approved – contact Jordache Production

Page 23 Date Error This screen appears if the shipment date is in a different month from the current date. Return to Shipment Header Maintenance and change the date of the shipment. Shipment Header Maintenance

Page 24 Ship and Bill - Finished Press Toggle Unship/Ship to see all SHIPPED POs (this may take some time to load) When you Ship/Bill, the shipped lines disappear from the screen. Type P then the Enter key on a SHIPPED container line to reprint the Packing List and Comm. Invoicereprint the Packing List and Comm. Invoice P

Page 25 What Happens Next When you Ship/Bill, RLM automatically creates invoices for the Vendor and for Jordache and reprints the Commercial Invoice AP and AR records are also created in all the affected companies. AP is automatic, while AR updates at the end of the day

Page 26 Create a New Shipment In the event that you need to create a shipment instead of waiting for the Loading program, follow the instructions on the next slides

Page 27 New Shipment Click here to create a new shipment

Page 28 New Shipment Created The new shipment appears. Notice the rest of the row is blank Type A to add a container to this shipment and hit the Enter key

Page 29 Create New Shipment The shipment number is assigned by RLM and cannot be changed Edit the ship date if necessary Enter the Warehouse number here. If there are POs to two warehouses on the shipment, use the primary one (with the most units).

Page 30 Create New Shipment (continued) Enter the cycle (MGO - ocean or MGA - air) and check point (SHP) Enter payment terms here Enter the flight or vessel number here

Page 31 Create New Shipment (continued) Enter the shipment terms here Enter Ship Via info here You may enter comments in these lines Enter O for Ocean, A for Air or click the icon to search

Page 32 Add Container to Shipment A list of containers appears. Containers are created when the Loaders begin to scan boxes into a container. You may add a container to a shipment at any time, regardless of whether it has units scanned to it Type A to add this container to the shipment and hit the Enter key Note: Typing U on a container already assigned to a shipment will remove it!

Page 33 Container Added The Shipment Number is now associated with this container Click Return to go back to the shipment list

Page 34 PO Lines in Container Added to Shipment Now that the container has been added, a shipment line for each PO on the container has been added You must wait until the status for every PO on the container is CLOSED (or UNCONFI) in order to print