Doewood Drive Gate Closure: Right-of-way Vacation & Proposed Improvements El Paso County Public Services Department Tuesday, February 14, 2012 André P.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Subdivision Plat Submittals Subdivision Plat Submittals
Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic Right-of-Way & Utility Involvement General.
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON.
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013 Ohio’s Composting Program Barry Chapman and Jen Hagar.
Basics of County Offices Highway Department County Officials Academy.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
CBJ Planning Commission Presentation November 9, 2010 Subdivision Ordinance Revision Update.
Your Roads The Future, Some History, and Alternatives For Wasco County April 23, 2013.
Model Home Permitting and Temporary Certificates of Occupancy Orange County BCC January 27, 2015.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
Engineering and Technical Plans Description, process and standards Dh 2005.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Sharman S. Brooks Senior Planner Kristine Goddard, AICP Principal Planner
PBSD - Transportation and Maintenance Facility Project Status Report – 1460 Greensburg Road Plum Borough School District Richard Zucco & Michael Brewer.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Amendments to the Unified Land Development Code Final Adoption Hearing April 22, 2008.
PLANNING DEPARTMENT CITY OF PEARLAND PLANNING DAY MARCH 13, 2008.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Site Plan Requirements © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture.
New Brighton Planning Commission Meeting April 18, 2006 Public Hearing: Zoning Ordinance Amendment: Section Regarding Commercial/Industrial Park.
Applicable Documents and KRS Statutes  FHWA Utility Relocation and Accommodation Guidelines  KRS  23CFR  23CFR  23CFR
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Huntsville Planning Commission Meeting Presentation on Use of Town Street Property Revision One September 3, 2006.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
1 Construction Assessment Hearing May 23, 2001 Shawnee Middle School Cafeteria.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Draft Generic Environmental Impact Statement for Adoption of Stream Corridor Management Regulations for the Lake George Park.
S Bachmann Springs Phase One Subdivision Abandonment Request.
2006 Annual Educational Conference on Outdoor Advertising Cleveland, Ohio Keith C. Melvin, CPM Director of Outdoor Advertising South Carolina Department.
Crow Wing County Ditch #13 Public Hearing 10/27/15.
Planning and Zoning Division Jefferson County PF The Gardens at Green Acres Sean Madden, Case Manager.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
ABANDONMENT OF DAGGETT ROAD & FYFFE AVENUE Rough & Ready Island January 11, 2005.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Sixth Amendment to the Orange County / City of Winter Garden Joint Planning Area Agreement and Utilities Territorial Agreement April 17, 2007 Sixth Amendment.
VILLA AMADOR VICINITY MAP. CASE SPECIFICS Subject properties encompass ± acres –Entails 10 parcels of land –Located south of Amador Avenue, west.
Limited Service Agreements
Jefferson County SA Red Rocks Site Approval
Butte County Board of Supervisors December 6, 2016
Scoping Meeting April 20th 6:00 pm
ABANDONMENT OF A PORTION OF A PUBLIC UTILITY EASEMENT RANCHO SAN MIGUEL MARKET June 21, 2005 Agenda Item 9.01.
Draft Transportation Element September 6, 2017
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Springbrook Estates Sewer Improvement Area Informational Meeting
Georgetown county water and sewer district
Participatory Road Program neighborhood meeting Donahoo 174th Street
PROJ. 566(17) LOR PID MAJOR WIDENING
Site Plan Requirements
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
San Diego LAFCO October 1, 2018
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Acquisition Details: Owners: James E Joyce Sr. Revocable Intervivos Trust and Gloria A Joyce Revocable Intervivos Trust Location: Section 27, Town of.
Walker Street Reconstruction Project 25% Design Public Hearing
Subdivision Applications
Leasehold Transactions
Item #: 3.1 Public Hearing – Vacating Lot 15 of Cherapple Farms, Plat C, and Lot 17 of Cherapple Farms, Plat E, and approving the final plat of Cherapple.
Larimer County: engineering
Presentation transcript:

Doewood Drive Gate Closure: Right-of-way Vacation & Proposed Improvements El Paso County Public Services Department Tuesday, February 14, 2012 André P. Brackin P.E., County Engineer

Interstate 25 County Line Road Woodmoor Drive Gate Location Furrow Road Gate Location

General description: Finalize disposition of the gate/discontinuity formally established Vacation of right-of-way and removal of the gate Provide improvements for emergency vehicle & maintenance vehicle access at both points of termination Assign new street name to avoid continuity confusion Resolution

Proposed Actions: Vacation/Replat$ 5,137 Construction of improvements$ 3,457 Road Name Change $ 1,075 Total$ 9,669 Estimated Public Costs

Summary: Vacate right-of-way and replat with four adjacent properties two different subdivisions result in two separate replats Preserve public drainage & utility easement access within existing right-of- way location Easements will serve the 4 occupying utility companies & provide access for El Paso County to maintain the public drainage system. Easement language to be coordinated with affected property owners Schedule (Second Quarter 2012): 1. Prepare application & coordinate w/property owners directly affected 2. DSD application review and agency referral 3. BoCC scheduling and hearing 4. Record subdivision documents Estimated Cost: PSD to prepare application materials Land Use Review Fees: $3137 (fees to be waived?) Title work and Misc Recording Fees: $ ? Vacation/Replat

Summary: Construct Improvements: Remove, replace and add asphalt for turn-around at Chisholm Trail (design coordinated with Tri-Lakes Monument Fire District) Remove gate, posts and local signage; add end of road signs at north end Remove 4 gravel, replace with 4 topsoil and plant native grass Remove part of existing culvert and grade ditch at Ridgeview Circle (portion of existing culvert will remain as driveway access) Existing driveway access (Lot 18) will remain; obtain driveway permit through DSD Schedule (Second Quarter 2012): Construct Improvements (weather dependent) Estimated Cost: PSD to prepare documents & construct improvements Estimated Material Costs: $3,250 (asphalt, local signage, grading, seeding, etc.) Driveway Permit: $207 (fees to be waived?) Proposed Improvements

Summary: Rename Doewood Drive from County Line Road to Chisholm Trail Minimize potential for non-local motorists to mistake road as a through street 39 property owners directly affected need to work with property owners to suggest list of potential names US postal service allows for one year to change road name on correspondence Schedule (second Quarter 2012): 1.Obtain Agency Approval Signatures (E-911, Enumerations, DSD, PSD) 2. Notices to and responses from affected property owners 3. BoCC scheduling and hearing (concurrent with vacation/replat) 4.Notification of road name change and install signage (weather dependent) Estimated Cost: PSD to prepare documents Material Costs: $1075 (new street name signs and sign upgrades) Road Name Change

Summary: Vacation/Replat Road Name Change Construction of improvements Will need to continue coordination with affected property owners Schedule: Applications to BoCC by April 2012 Improvements can be completed Spring/Summer 2012 Estimated Total Cost: $9,669 (vacation/replat, road name change, improvements) Questions? Summary