1 Georgetown county water and sewer district
Lunch & learn October 10, 2018

2 introductions Sign in sheet Introduce staff
Introductions around the room

3 Agenda lunch Developer project process Developer project milestones
What we need help with resources questions

4 DEVELOPER PROJECT process
WATER AND/OR SEWER SYSTEM EXTENSIONS

5 Extension policy

6 Projects Required to follow district’s extension policy
Any non-residential building larger than 1,500 square feet Any retail commercial business Any building requiring an internal fire sprinkler system, fire protection booster pump, standby fire line, or onsite fire hydrant Any building providing medical facilities or services (human or animal)

7 Projects Required to follow district’s extension policy
Any facility preparing or providing food services Any facility discharging any waste other than domestic waste Any facility of an unusual nature so determined by the engineering department and confirmed by the executive director

8 Projects Required to follow district’s extension policy
Any single-family lot subdivision or commercial lot subdivision or facility for which the district is required to make a determination of the availability of water and/or sewer service in keeping with SCDHEC code of regulations R61.57 Any multi-family development Any plat prepared for the subdivision, re-platting, or re- configuring of parcel lot lines resulting in 3 or more parcels

9 Projects not-Required to follow district’s extension policy
If you are subdividing one parcel into 2 parcels and there is no water or sewer abutting the property.

10 Four MAIN PHASES LETTER OF INTENT (Loi) & SKETCH PLAN
CONSTRUCTION PLANS & DELEGATED REVIEW PROCESS (drp) Construction CLOSEOUT

11 LETTER OF INTENT (Loi) & SKETCH PLAN
PROJECT NAME DEVELOPER AND CONTACT INFORMATION CONSULTANT ENGINEER AND CONTACT INFORMATION PROJECT Description SIMPLE SKETCH OF PROPOSED MAIN LINE EXTENSIONS # of REU’S LOI FEE (Project will not be reviewed without fee)

12 LETTER OF INTENT (Loi) & SKETCH PLAN
PREDESIGN APPROVAL 10% FEES WATER & WASTEWATER CONTRACTS Encroachment permits

13

14

15 CONSTRUCTION PLANS & DELEGATED REVIEW PROCESS (drp)
Final Construction plan Use the plan review checklist

16

17

18 CONSTRUCTION PLANS & DELEGATED REVIEW PROCESS (drp)
Construction permit application Waccamaw Neck 285 GPD Georgetown 300 GPD Only submit a complete package

19

20

21 CONSTRUCTION Shop drawings 90% fees due Preconstruction conference
INVITE ALL UTLITIES, COUNTY AND SCDOT Inspection testing

22 Project Close Out Conveyance documents Close out documents
Operation and maintenance letter for dhec

23

24 DEVELOPER PROJECTS milestones

25 What must I do to get a plat signed
100% impact fees paid All utilities installed and operational approval or 100% impact fees paid Dhec construction permits with letter of credit or cash deposit equal to 125% of the estimated cost to install the required utilities.

26 What must I do to get a building permit
100% impact fees paid All utilities installed and operational approval or Dhec construction permits with letter of credit or cash deposit equal to 125% of the estimated cost to install the required utilities. Pay connection fees for each building Only on every other lot Temporary waste disposal permit for each building No water or sewer service until operational approval (no construction water)

27 DEVELOPER PROJECTS What we need help with

28 What we need help with Record drawings
Only submit complete drp packages Construction inspection Compaction Consider entire area when designing your subdivision Start closeout documents early

29

30 resources www.gcwsd.com Emails geanennek@gcwsd.com mattl@gcwsd.com

31 Any questions about anything?


Download ppt "Georgetown county water and sewer district"

Similar presentations


Ads by Google