X-Ray Endstation Systems (XES) 2006 Schedule

Slides:



Advertisements
Similar presentations
John Arthur X-ray October 12, 2004 X-Ray Detector Program Status John Arthur.
Advertisements

Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 LUSI Overview J. B. Hastings January 2007 Lehman Review Response to Lehman Review.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
John Arthur X-ray April 7, 2005 LCLS Detector Development Plans John Arthur.
Stefan Moeller X-Ray October 27, X-Ray Detectors Stefan Moeller.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Stefan Moeller Exp. Areas Conventional October 24, Experimental Areas - Conventional Facilities Stefan Moeller.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
LUSI Coordination with LCLS
Experimental Facilities Planning
LCLS Ultrafast Science Instruments
X-ray Pump-Probe Instrument
LUSI X-ray Pump-Probe Instrument WBS 1.2
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
Far Experimental Hall Hutches Civil Construction
Stefan Moeller – XES Manager May 14, 2009
Development of LCLS Far Experimental Hall Hutches
John N. Galayda – Director of LCLS Construction March 30, 2009
Installation of Photon Beam Transport to FEH
Electron Beam Systems ETC and Methodology
Thomas Fornek Project Manager July 15, 2009
LINAC OPS Budget Review
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstations Update
LUSI Controls and Data Systems W.B.S. 1.6
Project Management Issues John N. Galayda, SLAC April 24, 2002
Conventional Facilities WBS 1.9
Endstation Systems, Installation Costs and Schedule J. Hastings
Experimental Program and Endstations System (WBS ) J
John Arthur – LCLS Experimental Operations
NEH - Status Stefan Moeller.
The Transition to User Operations
PIXEL Project Status John Arthur Photon Instrumentation for
Coherent X-ray Imaging Instrument WBS 1.3
Conventional Facilities Status
LCLS Personnel Protection System and Beam Containment System
LTU/Undulator Installation Status
X-ray Correlation Spectroscopy Instrument
DOE Review 7-9 February, 2006 Steve Lewis
Linac Coherent Light Source Transition to Operations 11 July 2007
Installation Status & Operational Readiness Process
X-Ray Endstation Design & Management/Commissioning
LCLS Lehman Review February 7-9, 2005
LINAC System Engineering / Design Status C.E. Rago
Control System Overview Hamid Shoaee LCLS Control System Manager
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Photon Systems Overview
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

X-Ray Endstation Systems (XES) 2006 Schedule Stefan Moeller

Outline Scope of X-Ray Endstation Systems (XES) Layout Milestones Tasks and Plan for FY06 XES Detector program Budget and Staffing Summary

Scope and Goals The X-Ray Endstation Systems (XES) group will create the infrastructure required for experimenters to make best scientific use of the LCLS radiation safely XES will equip a complete instrument for Atomic Physics Experiments Coordinate all safety related aspects for the user environment and the experiments

The Endstation Systems provide: Infrastructure for LCLS Experiments: Personnel protection systems (PPS) Protect people from x-rays and lasers Machine protection systems (MPS) Protect machine from users Network and computer support Cables, networks, servers, data storage Prototype Detector New type of x-ray detector for LCLS experiments Instrumentation for first Atomic Physics experiments: AMOS chambers, sample handling, detectors, optics, etc Beamline controls Synchronized laser system Installation and Commissioning: Integration with rest of LCLS and with AP Station

Endstation Systems Location and Layout FEE, NEH, XR Tunnel, FEH: Controls, Cabling, Network, PPS, MPS NEH: AMO Instrument, Beam-line Controls, Laser, Mech./Vacuum FEE XR Tunnel 646 ft NEH FEH

Near Experimental Hall The Near Experimental Hall Shops, setup space FEL beam Experimental hutches AMOP Hutch Soft X-ray

AMOS Hutch Layout Hutch #1 in NEH Rough Conceptual Design Optics: Focusing system Laser system (higher power) Sample System Chambers (sample, diagnostics) UHV system Detectors (e, ions, photons) Diagnostics (x rays, laser)

Far Experimental Hall Access Tunnel 19ft, ~300ft long Hutches 1,2,3 >30x30ft X-Ray Tunnel 20ft Control Area 1 Control Area 2 Control Area 3 46ft 212ft

XES L3 Milestones Level 3 FY05 Complete 2D Detector Statement of Work Award Initial R&D Funding for 2D Detector FY06 Hire Atomic Physicist Hire Detector Physicist Design Review #1 for 2D Detector Specification for Streak Camera FY07 Design Review #2 for 2D Detector Network Final Design Review Beamline Control Final Design Review Laser Final Design Review Order Lasers FY08 Start Installation in FEH Laser Operating in NEH Complete Beamline Controls Complete Mech./Vacuum Installation Complete Network and Cabling Complete Acceptance Tests of Detectors Complete Installation in NEH First Atomic Physics Experiment

Task Summary for FY06 Staffing: Detector, Atomic, PPS Eng., Controls Eng., (Laser, ME) Continue with 2D Detector R&D (01/6) Design Review #1 for 2D Detector (02/06) Start Streak Camera (MOU, TA) (02/06) Design PPS, MPS (3/06) PPS Design Review (5/06) Start Design AMO Instrument (6/06) Start Spec. Laser PPS and User safeguards (7/06) Start Specification Network (7/06) PDR Network Spec (9/06) Start Specification Beamline Control (7/06) PDR Beamline Controls Spec (1/07)

Status and Plan for FY06 Detector Physicist hired (2/06) TA 06 for 2D Cornell Detector in place Scheduled Design Review #1 for 2D Detector (Feb. 9 -10, 2006) Start Streak Camera (MOU, TA in prep.) Atomic Physicist hired (1/06) Start with Specs, Design AMO Instrument (6/06) PPS Engineer hired (1/06) Starts PPS, MPS design in 2/06 Hire Controls Eng. (2/06) Start Specification Network (7/06) PDR Network Spec (9/06) Start Specification Beamline Control (7/06) PDR Beamline Controls Spec (1/07) Hiring of Beamline Control Engineer/Network Engineer

2D X-Ray Detector Program LCLS presents detector challenges Signal comes in large pulses (many photons) Pulse rep rate at 120Hz Dynamic range/ low noise >requires significant R&D for new detectors 2D Pixel array detector at Cornell Detector Specifications MOU, TA

2D Detector Development Plan Overview Time 1st year 2nd year 3rd year 4th year Reviews/ Milestones - Complete SOW - Award initial funding early 2005 - Progress review Feb.. 2006 - Major review early 2007 Decision to proceed with final development Fall 2007 - Acceptance tests early 2009 Activity - Design pixel electronics - Fabrication of small- scale test chips - Continue R&D of pixel electronics of small-scale fab Optimize design of small- scale fab - Design and fab of large- scale detector chips Design and build of readout electronics - Development, fabrication and delivery of final detector system

2D Detector Status: Tasks 2005: Develop basic pixel electronics Submit small scale fab run for test chips All tasks completed, on schedule Tasks 2006: Test, design, fabricate, improve pixel electronics using small scale fabrications Submit 1 full lot-scale fab End of 2nd year: Major Design Review Plan and task break down for 06 has been set up TA 06 signed and funding has been awarded

LCLS Detector Advisory Committee (LDAC) Advises and reviews LCLS and LUSI detector development projects Meets regularly (1st. Meeting Febr./March ’05) 2nd. Meeting 9-10 February, 2006 Members: G. Derbyshire (Rutherford Appleton Lab.) (Chair) L. Strueder (MPI Extraterrestrische Physik, Garching) E. Eikenberry (Paul-Scherrer-Institut, SLS) Y. Amemiya (Univ. Tokyo) E. Heijne (CERN) A. Walenta (Univ. Siegen)

Budgeted Cost of Work Scheduled (BCWS)

FTEs

XES Critical Path (PPS System) ready 1st Light thru Undulator

Principal Subdivisions and Staffing Photon System Manager J. Arthur X-Ray Transport &Diagnostics R. Bionta Science Advice J. Hastings Endstation Systems S. Moeller Project Planning J. Scholes Controls Bob Dalesio Mike Saleski (PPS) +7 people Mechanical, Vacuum 2 people Lasers 2 people Detectors Niels van Bakel Atomic Physics John Bozek +1 person

Summary XES is staffing up rapidly according to plan Hired Atomic Physicist, Detector Engineer Hired PPS Engineer (shared with Electron Systems) Hired Controls Engineer, (Network, Beamline Controls) Start detailed design of AMOS Instrument Start with Controls design (PPS, Network) Continue 2D Detector program with Cornell Start Streak Camera project with LBL Coordinate with AMOS working group and LUSI Develop Installation and Commissioning Plan