Updates on the Silicon Tracker 2S Module

Slides:



Advertisements
Similar presentations
FPC1011F Introduction of a new sensor package.
Advertisements

Using three IR sensors, SensingBot can sense the front obstacles so it can avoid them. Sensing.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Fishing FishingBot is a robot looks like a fish. It can make to bite fishing needle as closing mouth with Servo Motor when Infrared Sensor Board detects.
Professor Sung-Yeul Park
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
I.Tsurin Liverpool University 08/04/2014Page 1 ATLAS Upgrade Week 2014, Freiburg, April 7-11 I.Tsurin, P.Allport, G.Casse, R.Bates, C. Buttar, Val O'Shea,

FanBot is a fanning robot using High-speed DC Motor. Fan.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Material calculation of petal core variants Sergio Díez Cornell with input from many people CERN AUW, 3 rd Nov 2014.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
Stavelet Update Peter W Phillips 29/07/2011. Serial Powering with a Stavelet Module: Recent Results Whilst single SP modules in the “chain of hybrid”
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
The Mechanical Structure for the SVD Upgrade
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
Hybrid circuits and substrate technologies for the CMS tracker upgrade G. Blanchot 04/MAY/2012G. Blanchot - WIT
ABC130 Hybrid/module and HCC Bond Detail ABC130 Left & Right Handed Hybrid and Module Topology Original proposal – same flavour hybrids Hybrid-module.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Hybrid Activities for ABC Aim to freeze thermo-mechanical layout next week in readiness for submission Will make use of a resistive serpentine.
Module Radiation Length. Goals Estimate the expected radiation length of a module, based on the design and measurements on as-built modules Determine.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Fan Assembly Driven by Magnetic Fields
Si Sensors for Additional Tracker
Berkeley status Aug 10th, 2012.
SVD Electronics Constraints
n-XYTER Hybrid Developments
TT Upgrade Power Review
T. Bowcock University of Liverpool
July 2, 2007 ID CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled.
Local Supports for Inclined Layout: CERN Update
Hybrid Pixel R&D and Interconnect Technologies
ob-fpc: Flexible printed circuits for the alice tracker
Sensor Layout Options Aim is to understand the implication and constrains of possible sensor design/layout on the general ID Layout. Keep both ATLAS “drum”
Constructional requirements from ITk-Strips
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
Gluing jigs for Demonstrator
Phase 2 Outer Tracker Module analysis
HB RM prototypes Ianos Schmidt Aug 17, 2017.
Database requirements from ITk-Strips for DAQ loads
EC board for JEM-EUSO Design investigations
Equipment for Assembly – UK Experiences
2S module geometry updates Module positioning concepts
Rod adaptors for module tests Module positioning studies
Ideas and Plans on Tracker Module Mechanics Developments
SIT AND FTD DESIGN FOR ILD
Design and fabrication of Endcap prototype sensors (petalet)
Mechanical Discussion
Flex Status A.Nomerotski, 4 May 2010.
After service guide for changing PCB
Recent updates to the 2S module geometry Towards first dummy modules
Outer Tracker Module Design meeting, 27 January 2014 News on the PS and 2S module geometries 200 W / 2m 100 W / 5m News on PS and 2S module geometries,
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

Updates on the Silicon Tracker 2S Module 1,4 mm & 4,0mm versions

Previous CAD models used as a starting point

Previous 4,0mm module Previous 1,4mm module

Issues with previous models

Previous 1,4 mm module Sensors Difference in distance between hybrid board and sensors causes issues with wire bonding; difficult, poor reliability Hybrid Board Previous 4,0 mm module Hybrid Board Sensors

Main Changes

To bring sensors to equal distance from hybrid board, new contact pads are used

Upper sensor Hybrid Board ’S-shaped’ contact pads allow sensors to be distanced evenly relative to hybrid board Lower sensor Contact pad for 1,4mm module Contact pad for 4,0mm module

Other additions

A new layer of Kapton was added to insulate high voltage sensor surface from PGS, it extends over the edges of the sensors ¡High voltage surfaces!

A strip of Kapton tape underneath the contact pads helps minimize the distance needed between pads and sensors..

Modelling and materials

Modules with different distances between sensors share most components Main idea: Modules with different distances between sensors share most components 4,0mm Bridge Assmebly Main difference between 4,0mm and 1,4 mm version is the ’Bridge Assembly’ 1,4mm Bridge Assmebly

Possible changes to the ’Bridges Assembly’ If we use TPG for the bridge stiffener, do we need the PGS layer between stiffeners and sensors?

Main contributors to over all weight Item Weight in grams Sensors 9.02 Frame 7.74 Hybrid Boards 3.24 Optolink (on service board) 3.00 Contact Pads 2.21 DC-DC Converter (on service board) 2.07 PGS Layers 0.54 ASICs (on hybrid boards) 0.46 Connector 16-pin (on service board) 0.29 Screws 0.28 High Voltage related (Kaptons) 0.19 Main contributors to over all weight Complete module weight estimated to be 29,03 grams

Small changes possible to save weight / reduce material costs..

Two 2s Module types studied: 4,0mm module for end cap geometry, 1,4mm for barrel geometry Changes made to facilitate wire bonding Danger of discharges from high-voltage surfaces minimized Still to be resolved: Choice of materials for the Bridge Assembly i.e. just TPG or with PGS.. Need feedback from thermal and stuctural DEA study on this configuration Summary

We’ll start modelling a complete rod for the models, try positioning + cooling contact layouts First quotations from TPG suppliers received, waiting for samples.. Next