Objectives of Elemental Estimation 1.To reveal the distribution of costs among the constituent element of the project. 2.To relate the cost of any constituent.

Slides:



Advertisements
Similar presentations
Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Advertisements

Exterior Window and Door Frames
Construction Method, Material Selection & Building Services
TRONCO BUILDING SUPERSTRUCTURES IN HAITI
Doors Wood Framed Doors.
FVCC Fire Rescue Forcible Entry.
Health Care Building Available for Sale! Immediate Delivery from our Bristol, IN plant. Call Don See Floor Plan and Specifications.
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 10 Improvement Analysis.
Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
ENERGY STAR Qualified Homes
Module Reading Plans and Elevations
Floors & Floor Construction What lies beneath the surface that we see? Concrete slab: is it on grade, or on a frame? Wood joist construction: what direction.
Floor-Plan Dimensions and Notes
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725.
Progress and Status COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED ORCHESTRA LIFT IS OPERATIONAL STAGE.
WOOD LIGHT FRAME CONSTRUCTION
Construction Methods using Spray Foam
Finishes many options Walls wood shakes, shingles, board & batten (vertical), plank lap (horizontal), T1-11 ply, vinyl, fiber cement, aluminum, stucco.&
Ground-Supported Slabs • Exterior Flatwork
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Skyscraper Construction
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Miscellaneous Details. u May have special or unusual conditions –inside or outside structure u Approach same as before –analysis of how specific detail.
Civil Engineering & Architecture 2.3 Residential Design.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
Walls: Materials, Location, Load Bearing, Non-Load Bearing
Basic Building Construction
John Basbagill Integration of Life Cycle Assessment and Conceptual Building Design June 16, 2012.
Exterior Wall (Masonry)
Constructing Homes and Other Buildings
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Architectural CAD I – IM230 Vocabulary. GROUP 3 Vocabulary.
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 11 Improvement Analysis.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
Wall and Ceiling Construction
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
Finishing the Building
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
State of Virginia’s Adoption Uniform Statewide Building Code –Adopts model codes by reference Family of I Codes 2003 edition NEC 2002 edition –Statewide.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
Wall Framing Grimsby Secondary School Technology Dept.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
 Overview of Interior Finishes  Types  Examples.
Orthographic Drawings
APPLICATIONS OF TECHNOLOGY
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
An-Najah National University
Major Steps In Building a SFR
Fall 2017 Update: Physical properties and sinking fund
Table (3.1)- the averages of the 10 models costs
Multistory Office Building
Drawing Interpretation
Chapter 10 Construction Basics.
Facade Panes Dealers in UAE
Pre-Contract Cost Control
International Building Materials and components
INTD 503- Materials Topic: Partition Walls
Minuteman Vocational Technical Regional High School Progress
Components of Construction
Building Construction I Sofia Sebastian 1
Value of contract: Length of contract: Contract start date:
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
© OnCourse Learning.
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Objectives of Elemental Estimation 1.To reveal the distribution of costs among the constituent element of the project. 2.To relate the cost of any constituent element to its importance as a part of the whole project. 3.To compare the cost of the same element in different projects. 4.To enable a determination of how costs could have been allocated to obtain a better project. 5.To obtain and use cost data for future projects.

Ratio Used for Elemental Estimation 1.Element quantity to base unit quantity 2.Element cost to total project cost

Sample Ratios in Building Element Estimates : Laboratory and office Building Design Efficiency AreasRatios Area of exterior vertical cladding to floor area : 1 Area of windows to area of exterior vertical cladding : 1 Area of windows to gross floor area : 1 Area of roofing to gross floor area : 1 Area of partitions to gross floor area : 1 Area of internal doors to area of partitions : 1 Area of floor finish to floor area : 1 Area of ceiling finish to floor area : 1 Volume of building to gross floor area : 1

Building An Element Cost From Unit Cost Data (Analysis) Element: 3a. Exterior cladding: roof finish Unit Quantity Cost* Cost 12.7-mm gypsum board16,140 ft 2 $ 0.85$ 5,652 4-ply built-up roofing16,140 ft , mm rigid insulation16,140 ft , mm stone 1,305 tons ,350 Expansion joints, including: Flashing and butyl membrane L.S. 2,000 Flashing at parapet 490 m ,000 $73,447 *September 1981 cost level.

Substructure a.Normal Foundations. Footing to extend to 4 ft below average finish grade with finish grade at an average of 1 ft below top of foundation walls. Allow for footing size 2 ft 4 ft and foundation wall 10 in. wide and 5 ft high. b.Basement excavations and backfill. Not applicable. c.Special foundations. Not applicable.

Substructure a.Lowest-floor construction. Plain slab 6-in.-thick concrete, including 8-in. of crushed stone, mesh reinforcing, screed and steel trowel finish. b.Upper-floor construction. Steel frame, metal floor deck, joint formwork. c.Roof construction. Steel frame, including 1 -in.- deep galvanized metal deck.

Exterior Cladding a.Roof finish. Build-up roof system, including wood cants, nailers, flashings, and 2 in. of rigid insulation for low-rise building. b.Walls below ground floor. c.Walls above ground floor. 12-in. composite wall with 4-in. modular brick facing, vapor barrier, 6-mm metal stud, 4-mm batt insulation, metal furring, and drywall. d.Windows. Aluminum frames with baked enamel finish. Thermally broken with one operable vent and sealed tinted double glazing. e.Exterior doors and screens. Aluminum framing with baked enamel finish thermally broken, sealed double glazing.

Interior Partitions a.Permanent partitions. Metal stud partitions, 4-in. thick with a single layer of -in. drywall on both sides. 8-in. concrete block fire walls with metal furring and drywall either side. b.Movable partitions. c.Doors. Hollow-steel honeycombed doors in -in. frames, including hardware for residential buildings.

Vertical Movement a.Stairs. Metal pan stairs, 5 ft wide 10 ft rise with half landings, including precast terrazzo treads and landings and picket railings. b.Elevator and escalators. Not applicable.

Interior Finishes a.Floor finishes. Quarry tile in vestibule, ceramic tile in washrooms, and vinyl acetate tile elsewhere. b.Ceiling finishes. Acoustic tile throughout. c.Wall finishes. Tape, fill, and paint.

Fittings and Equipment a.Fittings and fixtures. Allowance to cover washroom accessories, signs, and floor mats ($200,000). b.Equipment. Not applicable.

Electrical a.Services. Complete electrical installation, including electric heating. b.Lighting and power. Lighting throughout. c.Systems. Not applicable.

Mechanical a.Plumbing and drains. Allowance for residential buildings. b.Fire protection. One head per 120 ft 2 ($190/head). c.HVAC. Room top system, ton of cooling per square foot of gross floor area.

Overhead and Profit Allowance for simple commercial projects with excellent market conditions.

Site Development a.General. Rough grade, spread imported topsoil, fine grade, and place sod. Roads and parking, including 6-in. of crushed stone base, 3 in. of double-layer asphalt, and precast concrete curbs. Walks and steps 4 ft wide, including 4 in. of crushed stone base, 5 in. of concrete, mesh and broom finish. Include a planting allowance for trees and shrubs (allowance $250,000). b.Mechanical and electrical. Site drainage and services to the building (allow $100,000). c.Alterations. Not applicable. d.Demolition. Not applicable.

Contingencies a.Design. Allow 6%. b.Escalation. Allow 2%. c.Construction. Allow 3%.

Estimate note: The total cost is within the range predicted by the preliminary estimate (19,000,000+25%)