Eaton MEDC, Sutton-In-Ashfield

Slides:



Advertisements
Similar presentations
Building Codes, Zoning Ordinances
Advertisements

Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Abcdabcd Low Rise Buildings The Built Environment in which we live is composed of:- Buildings Travel systems Services Disposal & Treatment Systems. The.
Portal Framed Construction
Construction and Structures2 SRT 251 Major Project Warehouse and Office Complex Scenario Louis Kahn Christopher Holder
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
HOUSE BUSINESS COMMITTEE PRESENTATION BY GHRC ON CITY GATE PROJECT 13 th October, 2014.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
PHOTO. NO.DATE: 06/11/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MAJOR MAINTENANCE FY 14.
FOR SALE/TO LET Unit 7 Skyways Commercial Centre Blackpool Business Park Amy Johnson Way Blackpool, Lancs FY4 3RS Modern steel framed warehouse with Mezzanine.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Ice Arena Brīvības gatve 333, Riga, Latvia. Ir īpašumi visā Latvijā! Brīvības gatve 333, Riga, Latvia Ice Arena Ir īpašumi visā Latvijā! Description of.
Building Green Lesson 1 – Green Architecture © 2012 Project Lead The Way, Inc.Green Architecture.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Orthographic Drawings
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Fox Construction Group has over 20 years experience in providing infrastructure, support services and construction throughout.
Estimating and Scheduling CEE 492
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
Code for Sustainable Homes Materials
Pre-Contract Cost Control
Prefabricated Timber Frame Construction
Temporary Works – P8 Project Practice.
1, sq m (20,067 sq ft) Property Highlights
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Prepared by Frank Cooney B.Arch MRIA
Carl James Type of building use
TO LET (MAY SELL) Former HSS Hire Unit Wakefield Road Bradford BD4 7LX
Pre-Contract Cost Control
Offsite Applications for Rail Overbuild Part 1
QMC Nottingham - Refurbishment works to Wards A23 & B50
14 High Leys Drive, Ravenshead, NG15 9HQ
Carleton College Summer 2018 Science and Campus Construction Plan
20 Chestnut Drive, Mansfield
The Beehive House, Castledine Street, Loughborough
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
Field House, Car Colston
The Hollies, Ravenshead
Progress Report January 2016
1 Semester Project Design A Multi Story Office Building
Value of contract: Length of contract: Contract start date:
Woodlane Timber, Hucknall
Widmerpool House, Kinoulton Road, Widmerpool
The Acorn Medical Practice, Wood Street, Mansfield
Value of contract: Length of contract: Contract start date:
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
New White Lake Township Library
White Post Farm, Farnsfield
14 Crow Hill Rise, Mansfield
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
Value of contract: Length of contract: Contract start date:
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
PKL INVESTMENTS LTD Value of contract: Length of contract:
Poswillow Suite, Children's Dental Unit
Ashfield District Council Disabled Facilities Adaptations
Field House, Car Colston
Coppice Ridge, Fiskerton, Newark
P4 North Ring Business Park,
Value of contract: Length of contract: Contract start date:
The Paterson Redevelopment
Community Practice Asset Management.
Unit 47, Rosemount Park Drive, Rosemount Business Park, Ballycoolin, Dublin 15 To Let 25,006 sq. ft 2,323 sq. m High spec logistics facility with 11 meters.
Value of contract: Length of contract: Contract start date:
Presentation transcript:

Eaton MEDC, Sutton-In-Ashfield Value of contract: Length of contract: Contract start date: Completion date: £1.1 M 9 months May 2017 January 2018 Works/services provided: Mass concrete foundations Erection of Portal steel frame, mezzanine floor with metal deck and concrete subfloor Blockwork superstructure with Metal deck and concrete roof Alteration to exst steel structure and composite cladding Steel fire escape staircases and landings UPVC, Aluminium & timber door & window systems HVAC systems & Energy efficient electrical installation and data cabling High Quality Internal fit out and finishes Detailed description of contract: The project involves alterations and extensions to an existing warehouse at Unit B Gateway 28, Including construction of 1200m² of new two storey office accommodation within the existing production facility. The scheme encompasses alteration and refurbishment of existing first floor office space to create an inviting open plan working environment with efficient electrical and HVAC systems. Particular challenges to be overcome: Contact details: Phased programming to enable business continuity of the production facility (Circa 1m Units per week) Achieving key completion dates to enable ‘business critical’ staff re-location Containment of extensive demolition works directly adjacent to a live production area with high dust sensitivity Partial strip out and alteration of ‘Live’ building services and production control equipment whilst maintaining continued service in all adjacent areas Mr Shaun Black - Production Eng Manager Eaton MEDC Unit B Sutton Parkway Oddicroft Lane Sutton-in-Ashfield. NG17 5FB Tel: 01623 444400