Presentation is loading. Please wait.

Presentation is loading. Please wait.

Value of contract: Length of contract: Contract start date:

Similar presentations


Presentation on theme: "Value of contract: Length of contract: Contract start date:"— Presentation transcript:

1 Sonoco, Goyt Side Mill, Chesterfield Installation of Loading Docks & Associated Works
Value of contract: Length of contract: Contract start date: Completion date: £285,000 4 months February 2015 May 2015 Works/services provided: Install ‘air tight’ temporary protection to segregate the shop floor from the works 1500m² goods vehicle yard in reinforced concrete to withstand Arctic Trailers Form Apertures in external walls for Loading bay pods Construct Internal logistics office ; Make good to insulated cladding Masonry Walls, Suspended ceilings Heavy Duty surface water drainage system Plaster finishes, Electrical installation Installation of Vehicle containment ‘high’ kerbs and Armco barriers Floor finishes Detailed description of contract: Segregation of the working area from the shop floor to maintain un-interrupted production throughout one of the clients busiest periods. Form apertures in the external walls to accommodate the new vehicular loading bay pods. Construct heavy duty concrete yard for goods vehicles. Internal alterations to form new logistics office adjacent to the loading bay. Particular challenges to be overcome: Contact details: Segregation of the works from a live food packaging manufacturing facility Programme acceleration to afford sufficient concrete curing time ahead of wheel lock & Loading pod installation Sectional completion of the works to return areas of staff car parking tot the client at peak periods Mr. Andrew Blackburn Sonoco Consumer Products Goyt Side Mill, Goyt Side Road Chesterfield Derbyshire. S40 2PH Tel:


Download ppt "Value of contract: Length of contract: Contract start date:"

Similar presentations


Ads by Google