John Arthur – LCLS Experimental Operations

Slides:



Advertisements
Similar presentations
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
Advertisements

Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Jochen R. Schneider AMO Proposal June 2, LCLS User Access Policy Goals Scientific thrust areas - Instrument Teams.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project Update on LCLS User Proposals John Arthur, Jochen Schneider Experimental Facilities.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
1 T. Fornek 1 LUSI CXI FIDR June 3, 2009 Thomas Fornek Project Manager June 3, 2009 LUSI Coherent X-Ray Imaging Instrument Final.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
1 T. Fornek 1 LUSI XCS FIDR June 17, 2009 Thomas Fornek Project Manager June 17, 2009 LUSI X-Ray Correlation Spectroscopy Instrument.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 1 From construction project to operating facility Structure.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
LCLS User Access Policy
LUSI Coordination with LCLS
Experimental Facilities Planning
DOE Review May, 2005 Steve Lewis
LCLS Instrument Development
LCLS Ultrafast Science Instruments
X-ray Pump-Probe Instrument
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Hal Tompkins – Photon Beam Systems Deputy June 8, 2009
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
LINAC OPS Budget Review
John N. Galayda – Director of LCLS Construction March 30, 2009
Installation of Photon Beam Transport to FEH
Electron Beam Systems ETC and Methodology
John N. Galayda – Director, LCLS Construction May 13, 2009
LCLS User Research Administration
X-Ray Transport, Optics, and Diagnostics WBS Alan J
X-Ray Endstations Update
LCLS User Access Policy
Project Management Issues John N. Galayda, SLAC April 24, 2002
Integrated Safety and Environmental Management
FEE Diagnostics and Commissioning
The Transition to User Operations
PIXEL Project Status John Arthur Photon Instrumentation for
LCLS Project Transition to Operations 14 May 2008
Coherent X-ray Imaging Instrument WBS 1.3
X-ray Correlation Spectroscopy Instrument
Hal Tompkins – Photon Beam Systems Deputy May 14, 2009
DOE Review 7-9 February, 2006 Steve Lewis
Linac Coherent Light Source Project Update
Linac Coherent Light Source Transition to Operations 11 July 2007
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Photon Systems Overview
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

John Arthur – LCLS Experimental Operations LCLS Operations Plans John Arthur – LCLS Experimental Operations April 21, 2009

LCLS Organization LCLS Director Accelerator Systems Div Dale Knutson Accelerator Systems Div John Seeman operate accelerator for science Experimental Facilities Div Jochen Schneider operate instruments for science Business Div Cindy Lowe Engineering Physics Div David Schultz Strategic Projects Div John Galayda LCLS Construction LUSI

LUSI resources matrixed in LCLS Director Instrument scientists Accelerator Systems Div Experimental Facilities Div Business Div Engineering Physics Div Strategic Projects Div Engineers LUSI Controls PMCS

Resources move as instruments turn on LCLS Director Instrument scientists Accelerator Systems Div Experimental Facilities Div Business Div Engineering Physics Div Strategic Projects Div Engineers LUSI

Division of responsibility ASD responsibility Undulator Hall XFD responsibility Near Experimental Hall Front End Enclosure Far Experimental Hall

Experimental Facilities Division (XFD) XFD is the administrative home of the LUSI Instrument Scientists

Experimental Facilities Division Tasks Manage safe operations in LCLS experimental areas Manage LCLS user program Maintain and upgrade X-ray instrumentation Enable good user science; initiate in-house research

Current XFD Priorities LCLS Construction: Installation in FEE, Hutch 1 Augment scientific and support staff Create structure for safe operations Begin User program LUSI: Accelerate schedule

The LCLS X-ray Beamline X-ray transport tunnel Far Experimental Hall Near Experimental Hall Front End Enclosure

Diagnostics and Offset Mirrors in the FEE Two-phase installation Solid Attenuators Gas Attenuator Calorimeter Beam Direction Slit Gas Detectors K-Mono 5 mm collimator Direct Imager (Scintillator) FEL Offset Mirror Systems Phase 2

Phase 1 includes all X-ray diagnostics FEE installation plan Phase 1 includes all X-ray diagnostics Currently shipping to SLAC from LLNL Installed, wired by late April First beam by mid May Phase 2 includes mirrors Install most component in April Beam-alignment cameras installed in June

LCLS Offset Mirror Systems 800-2000 eV to Hutch 1 HOMS: Hard x-ray Offset Mirror System SOMS: Soft x-ray Offset Mirror System insertable 800-2000 eV to Hutch 2 insertable 2000-25000 eV to Hutch 3-6

The first two LCLS instruments AMO Soft X-ray beamline without monochromator, for high-field experiments Funded by LCLS Construction Installation June 2009 Commissioning July 2009 SXR Soft X-ray beamline with monochromator, for materials science Funded by SXR Consortium Installation January 2010 Commissioning March 2010

Creating Operations Structure LCLS Organization Strong ties between XFD and ASD XFD directives XFD training plan and documentation SAD, ASE to include NEH Key XFD operations staff Top managers (Safety Officer, Program Manager) Area managers Floor Coordinators Accelerator Readiness Review mid-late June

LCLS X-ray Operations plan Sept-Dec 2009, with 1 instrument (AMO) Mar-July 2010, with 2 instruments (AMO, SXR) Aug-Dec? 2010, with 3 instruments (AMO, SXR, XPP) 2-3 more instruments in 2011 Steady-state X-ray operations at ~4000 hrs/year Scheduled in blocks of about 6 months, with periodic brief interruptions for machine studies Typical experiment will last for about 1 week

Transition of LUSI instruments to XFD XFD contributes science guidance to instrument planning LUSI scientists are matrixed from XFD Transition from Project to Operations is marked by Instrument Readiness Review Formal in-house review, includes review of standard operating procedures XFD manages each instrument in operations phase

LCLS User Program Goal: safe, efficient operation promoting the best science LCLS will be a DOE-BES User Facility Access through proposal/review process LCLS scientific staff frequently collaborate with users, also maintain independent research programs

User Program Management LCLS and SSRL are combining resources, creating a common User Administration Group Managed by Cathy Knotts Manages User training, User agreements, User metrics LCLS is supporting one added User Administrator

LCLS Proposal Review Panel (PRP) PRP members Christina Back (San Diego) Janos Kirz (LBNL) Magid Chergui (ETH Lausanne) Dwayne Miller (Toronto) Lew Cocke (Kansas) Juerg Osterwalder (University of Zuerich) Gianluca Gregori (Cambridge, UK) Metin Tolan (University of Dortmund) Chi-Chang Kao (BNL) Kyoshi Ueda (Sendai) Steve Kevan (Oregon) Edgar Weckert (DESY) Two representatives of LCLS management without voting rights: Jerry Hastings Jochen Schneider

LCLS User Program: Important dates First proposal round close 9/1/2008 (AMO only) 2nd proposal round close 5/15/2009 (AMO, SXR) 3rd proposal round close ~10/1/2009 (AMO, SXR, XPP)

LCLS User Program: First experiments First proposal round: 28 proposals from 16 countries (>200 scientists) PRP met in December, gave highest rank to ~10 proposals Most highly-ranked proposals will study effects of intense X-ray pulses on atoms or simple atomic clusters Some highly-ranked proposals will study diffraction imaging of molecules or clusters

XFD will be the interface between LCLS and the world user community Summary XFD is a new department at SLAC, will run LCLS X-ray experimental facilities Administrative home for LUSI Instrument Scientists XFD will be the interface between LCLS and the world user community Responsible for running User program XFD will nurture creation of LCLS instruments, then manage them Close ties with LCLS Construction and LUSI projects Goal: safe, efficient operation promoting the best science