US Rod Burn-in Readiness DAQ Hardware/Power Supplies

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
1 Long Term Module Testing-Anthony AffolderTPO, December 11, 2003 Current Module LT Testing Capability Only Vienna Boxes Available  10 slots at each site.
Juan Valls 1 TOB System Test Status Report  DS ROD System Test Setup  DAQ Software  DS ROD Characterization PLL, FED Timing Scans OPTO Scans  Noise.
CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 1 Long term rod testing software Patrick Gartung University of California, Riverside.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs DAQ Power Supply Needs HV à 600 V/~1mA range –0.1-1  A Current Sensing –Over Voltage/Current.
DAQ Status. F.S. Cafagna, Coll. Meeting 16 March Hardware  In 555, one equipped crate for VME readout  top crate  9U crate  Power Supply 
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
PIXEL CAEN Installation Status
FPix DCS Subgroup Report
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
LKr status R. Fantechi.
ELENA scrapers ELENA status for BI – electronics and software
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
GEM DAQ-Chamber Integration Test Stand for GE2/1 & ME0 at Florida Tech
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
RPC Barrel HV & LV system Lappeenranta University
T1 Electronic status Conclusions Electronics Cards:
EMU Slice Test Run Plan a working document.
Electrical and electronic systems projects
10/month is the present production rate 2 FTE + sporadic contributions
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
HF Test station at P5 A.Mestvirishvili.
HV & LV status LV system in W+1 and W+2 is OK
ROD assembly and test in US
DAQ Equipment Status 2 fully equipped Vienna boxes at UCSB and FNAL
Pierluigi Paolucci - I.N.F.N. Naples
UCSB Testing Status Anthony Affolder
UCSB Testing Status Anthony Affolder
Pierluigi Paolucci - I.N.F.N. Naples
UCSB Testing Status Anthony Affolder
RPC HV&LV status Introduction HV power supply tender
Hardware Needs (Near Term)
On behalf of the US TOB testing group
RPC Detector Control System
US Testing Update Anthony Affolder (On behalf of the US testing group)
Operations/Failure Analysis
B904 Status Report by Fred B.
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
US Module Testing Progress Report
HV & LV status LV system in W+1 and W+2 is OK
Current Module LT Testing Capability
Operations/Failure Analysis
Current Module LT Capability
Operations/Failure Analysis
US Module Testing Progress Report
Operations/Failure Analysis
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Equipment Status ARCS equipment status DAQ equipment status
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

US Rod Burn-in Readiness DAQ Hardware/Power Supplies Anthony Affolder University of California-Santa Barbara

Rod Burn-in DAQ Hardware Status Have (as of now) Needs (late Sept.) Total Needs TSC -1 2 FEC (rod) 4 FED OEC (OFED) -2 (0) 4 (2) 24 (12) MUX Crates -3 MUX Boards -9 8 30 The list of what we have now includes our needs for single rod assembly test stands at both UCSB/FNAL. We will both need the DAQ equipment in order to burn-in 2 SS6 rods by late September, in order to commission the stands. Our total needs assumes 288 chips max. at each burn-in stand.

Power Supply Status HIGH VOLTAGE LOW VOLTAGE 2 SYS 127 CAEN crates from storage Brought 2 A128 HS CAENET controllers to upgrade crate’s CAENET ($2060 each) Brought 2 A1303 ($1125 each) PCI HS CAENET control cards Use CAEN A132 and A332 HV boards Again from storage An old SYS 127 CAEN crate can be brought into compliance with LT software with $3185 and 9-13 week delivery time Old SYS 127 may be available from CERN prep Waiting for DELPHI LV supplies First 2 should arrive at US by late July Will be used to commission one rod burn-in system: HV and LV interlocks and controls, data acquisition and analysis, etc. Need a total of 6 LV PS by mid-November to be able to burn-in 2 rods per site (FNAL/UCSB)