Hybrid & Module Testing Status

Slides:



Advertisements
Similar presentations
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Advertisements

Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
UCSB Hybrid Bonding & Testing
Hybrid & Module Testing Status
Update of US Testing Status
US Module Production Status
UCSB Testing Status Anthony Affolder
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Results from module testing
UCSB Testing Status Anthony Affolder
US Module Production Quality
Recent TOB Developments
Vienna Module Production
FNAL Module Testing Status
On behalf of the US TOB testing group
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Noise in TOB modules and sensor quality
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
UCSB Qualification Module Grading
Hybrid Status/Deliveries
Sensor probing (Summary)
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
FNAL LT Testing Status Modules – were tested during Aug 2 – Aug 9.
FNAL Hybrid Testing Status
Module Testing Status Week of 6/14-6/20.
Noise in TOB modules and sensor quality
US Module Testing Progress Report
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
Status of 44 ARCS tested TOB modules, June 24, 2004
FNAL Hybrid Testing Status
Electrical Testing at UCSB: Hybrids, Modules, & Rods
Is Increased Bias Current and CMN Correlated?
Isolated Bad-CAC Strip at UCSB
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Recent TOB Developments
Hybrid & Module Testing Status
Recent TOB Developments
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
US Module Testing Progress Report
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

Hybrid & Module Testing Status Week of 12/12-12/16 12/12-12/16

UCSB Hybrid Testing Status 12/12-12/16

FNAL Hybrid Summary As of 12/16/2005 12/12-12/16

TOB Hybrid Testing Failures This (Last) Week None Cumulative 7 Shorts in PA 2 Shorts on APV 6 Noisy channels-usually entire chip or chips 2 a few open and noisy channels 3 too many shorts 4 shorts & noisy channels 3 many noisy and short channels 3 scratched PA 2 Too many opens 2 Opens & shorts 1 Damaged during testing 1 many open & noisy channels 6 Global failure 12/12-12/16

TEC Hybrid Testing Failures This (Last) Week 1 global shorts 1 too many shorts, noisy 1 few shorts and noisy 3 damaged 2 too many noisy 3 too many shorts Cumulative 5 damaged at repair 2 too many noisy one open 1 too many shorts and noisy 1 two chips noisy and shorted 5 too many noisy channels 2 all chips noisy 6 global failure 10 shorts and noisy channels 9 scratch on PA 2 messy PA 3 too many open, noisy, short channels 5 too many shorts 12/12-12/16

Fermilab Hybrid Test Details A new graduate student/technician…… High first time failure rate on TEC’s, as usual: low count of tested hybrids 12/12-12/16

US Hybrid Testing Status 12/12-12/16

UCSB ARCS Testing Status 12/12-12/16

UCSB ARCS Testing Failures This Week Cumulative 12 with too much current 2 after backplane bonding 4 due to residue on sensors 1 already repaired 2 with >2% bad channels 1 with bad DCU Repairable 1 with CF frame shorted to HV 1 with bad Dec. Mode chip 1 with bad Peak Mode chip 1 with chip with too low noise 1 with bad chip 1 with funny LED test 1 with chip out of synch 1 failed on rod 1 CMN 12/12-12/16

UCSB ARCS Testing Results 2519 Total Tested 2489 Grade A 3 Grade B 27 Grade F This week: 8 of 39424 channels bad (0.020%) Total Production: 625 of 1540864 channels bad (0.041%) 12/12-12/16

UCSB ARCS Testing Results Total Production: 625 of 1540864 channels bad (0.041%) This week: 8 of 39424 channels bad (0.020%) 12/12-12/16

UCSB Backplane Testing 12/12-12/16

UCSB LT Testing Status Failed module has too much current 12/12-12/16

FNAL LT Testing Status Modules 4380-4384, 9518-9520, 9522, 9524-9529, 9495, 9530, 9534, 9536, 9539 were tested Dec 12 – Dec 15. All passed LT. Weekly – 20 modules passed LT. 12/12-12/16

FNAL LT Testing Status 12/12-12/16

US LT Testing Status 12/12-12/16