Documentation Theme Summary

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

Configuration Management
303LON and 308LON An Introduction to Workplace and Workbased Projects Unit: 1.
PDS MC April 2-3, Wash. D. C.1 PDS4 Data Model Working Group Status Report to the PDS Management Council April 2-3, 2008.
Science Break Out Session New Math and Science Teacher Dec 2008 Becky Smith.
Day 3 Secondary Mathematics. Before We Begin Today… Please write your name down on a Post-It Note and place it next to one grade level and/or course you.
Welcome!! As you find your seat, please complete the following task. Welcome!! As you find your seat, please complete the following task. Your Task Using.
Focus on Teamwork 1.
Outcome: Project teams will be able to  Identify opportunities and issues for Task-oriented transformations  Commence work on the Task-oriented section.
MSc project specification Unit PJ45P Dr Jim Briggs
CSC 395 – Software Engineering Lecture 25: SCM –or– Expecting Change From Everything But Vending Machines.
CS & ECE Senior Design Project Winter 2008 Karen Davis Chia Han Altan Ferendeci.
Software Construction and Evolution - CSSE 375 Software Documentation 1 Shawn & Steve Right – For programmers, it’s a cultural perspective. He’d feel almost.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Do it pro bono. Key Messages & Brand Strategy Service Grant.
Investigating System Requirements
September 26, 2013 Electrical Safety- (Including Lock, Tag & Try) Independent Assessment Out-Brief Presentation.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
Chapter 16 Structured Systems Analysis. Learning Objectives Know goals, plans, tasks, tools, & results of systems analysis Understand/appreciate costs.
LOGO “ Add your company slogan ” Software Measurement & Analysis Team Assignment 2.
Role of the Facilitator Dairy Profit Teams
Example Template for Project Presentation
Active Corrosion Process Nisource – COH/CKY. Objectives  Understanding the terminology –Active Corrosion –& Suspected Areas of “Active Corrosion”  Developing.
SoberIT Software Business and Engineering Institute HELSINKI UNIVERSITY OF TECHNOLOGY © Tomi Männistö, Varvana Myllärniemi, 2008 T Software Architectures.
Working Technologically Early Stage 1 – Stage 3. Students evaluate by: recounting the steps taken to reach a final solution discussing their likes and.
ITCS 6265 Details on Project & Paper Presentation.
Personal Product Production Drawing. DESIGN ANALYSIS A "Design Analysis" is the document prepared by an engineering team that includes all of the information.
Injector RF and Synchrotron RF Present Status, Activities, Plans PP a-GKO_MACS_RfStatus G. Kotzian WP RF - Present Status 1.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
Innovative Schools toolkit Workshop 6i-3 – Inclusion Stakeholder analysis and engagement.
The Design Process Foundation Concepts for Teaching Problem Solving The Model #302 telephone was the standard for forty years. How long will this one.
1 Status of the BCD GDE Area System Leaders Meeting (Jan.19-20, 2006) Nobu Toge (KEK)
Assessment and the Institutional Environment Context Institutiona l Mission vision and values Intended learning and Educational Experiences Impact Educational.
What? + How. = Wow! Imani Butler Silver Creek High School San Jose, CA The Methodology In Action: Migrating to a School Loop Hosted Site.
Long Range PIT Summary and Plan PIT Team. Long Range PIT Team Goals Investigate, understand, and improve long term SRF linac performance –Quantify/Summarize.
Listening and Changing Project.  Client  Board Member  Carer  Staff – Local person and CEO  DFI.
BUS 611 Week 4 Assignment Integrated Project Management To purchase this material link
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
Cost Optimization Models for SRF Linacs
Investigating System Requirements
Configuration Management
IE 8580 Module 1: Course Preliminaries
IE 8590 Capstone Design Project: Course Overview
QUALITY IMPROVEMENT [SECOND]/[THIRD] QUARTERLY COLLABORATIVE WORKSHOP
Configuration Management
CRITICAL TASK & OBSERVATION
contexts Materials and Technologies specialisations
GDWG Agenda Item Repository for GSICS Work - Clarification on Archiving Masaya Takahashi, JMA CMA, CNES, EUMETSAT, ISRO, IMD, JAXA, JMA, KMA, NASA, NIST,
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)
Project or Team name: Vision: Mission Statement:
Required Course Project
Required Course Project
Steps In Creating Winning Teams
RF Gradient Data And Reporting Tools
Foundation Concepts for Teaching Problem Solving
System Development Life Cycle (SDLC)
Chapter Four Engineering Communication
PIT Task Lists Long Range PIT Team F. Lin.
PIT Initial Talk Geoffrey Krafft F. Lin.
Class Project Guidelines
Chapter Four Engineering Communication
Employee engagement Delivery guide
Presidents’ Presentation Development
Chapter Four Engineering Communication
Remote Support Patty Lindsay 1/14/18 .
EVMS Status and Overview
AO2.
NRRA Pavement Workshop 2019
WP2-DCO Dissemination, Communication & Outreach Month 3 Report
Presentation transcript:

Documentation Theme Summary PIT Document Team F. Lin

Long Range PIT Team Goals Investigate, understand, and improve long term SRF linac performance Quantify/Summarize performance as built Suggest and implement measurement plans to quantify performance changes Work to understand any changes observed Suggest improvements in operations processes and/or hardware and implement Data Management/Understand better "accelerating system wide" problems

Initial Goals of Effort Create common repository document summarizing RF/SRF performance of all cavities IN THE INJECTOR and LINACS Agree on contents (feedback from others) Agree on structure Populate structure Provide an intelligent update (data management) procedure As cavities swapped, update information Regular QA on final document

Several Meetings First Meeting Initial vision surrounding “Summary Document” (spread-sheet) discussed Vision deemed not modern and possibly difficult to maintain; especially if a “history” capability updating is required Invitations extended to a broader group to explore Data base solutions

Second Meeting Brief Data base presentation. Strongly discouraged from any ideas about reproducing CED Data management problem emphasized Discussed several possible future courses, none of which were obviously attractive Recent discussion centerred on the idea of documenting the the 12 GeV project generally

Present “Vision” If we would like to write a PRSTAB paper of the 12 GeV performance need Main parameters data for every cavity and summaries (Q0, QL, Emax, Emax(ops), … Descriptions of ancilliary equipment (RF sources, couplers and probes, LLRF, cryogenic systems, … Summary data on these items for publication Reliability Descriptions (main phenomena of interest) and data Can help get “over the hump” for Task 1

Task 2 Regular Report Every 2 months Need to come to a common vision within team Need to socialize solution to rest of PIT team members 7-10 Task items on a Gant Chart Specify some deliverables Plan for a year to two Restart regular meetings

Draft Planning Document Months 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Initiate Contents Present Structure Populate Book1 Book2 Book3 Book4 … QA * * *