2016 Exploration & Production Summer Standards Conference

Slides:



Advertisements
Similar presentations
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Advertisements

SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2014.
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
A Few Quick Items from AASHTO June 2006 Jim McDonnell, PE Associate Program Director, Engineering.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2015.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API RP 6HP (draft 5.2) Status Presentation Tech Session II Summer Standards Conference.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Yong-Yi Wang, Chair API 1104 Committee Meeting Washington, DC June 30, 2010 Report of Fracture Mechanics Subcommittee.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
Guidelines Revisions Next Steps April 23, Process to Date Staff and others identified a number of “issues” since guidelines were last approved April.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Winter Standards Meeting Austin, TX Joe Shine – Chair.
2016 Exploration & Production Winter Standards Conference Subcommittee Workgroup formed to address rewrite:
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Summer Standards Meeting Washington D.C. Joe Shine –
API SC 10, Work Group 13 Update:
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC 10, Work Group Update:
Task Group Status January ,11, 2017
API 17X Subsea Boosting January 13, 2015
API SC 10, Work Group 3 Update:
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2016 Summer Meeting Report.
Updates from SC18 Summer Meeting
API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal
Task Group API 19SS Sand Screens
TG Chair: Darrin Willauer Baker Hughes
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
2017 Exploration & Production Winter Standards Meeting
API RP 17A - Discussion Points
API S64 Summer Conference Update.
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
2016 Exploration & Production Standards Conference Subcommittee 10
SC6 Work Group on VR Plugs
First 8 slides are what was presented in San Fransisco…
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
2016 Exploration & Production Summer Standards Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API RP 59 June 2017 Recommended Practice for Well Control Operations
WG on Composite Cements: Calgary Meeting 2017
The OPTN Bylaws Rewrite Project What It Means For You
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
Discussion Points API RP 17A Task Group Members
API SC 10 WG15 Stage Cementing Collars
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
API SC 10, Work Group 13 Update:
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC 10, Work Group 13 Update:
Steering Committee (SC) Mtg.
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
Presentation transcript:

2016 Exploration & Production Summer Standards Conference Subcommittee 10 2015 Workgroup formed to address rewrite: June 26, 2016

Current Status of API Bulletin E3 API Bulletin E3, 1st Edition, Environmental Guidance Document: “Well Abandonment and Inactive Well Practices for U.S. Exploration and Production Operations”, January 1993 Reaffirmed 2000 This new document will supersede API Bulletin E3, 1st Edition Workgroup: D Mueller, G Benge, C Gardner, E Cunningham, A Parlipiano, D Stiles, A Garnier, J Heathman, J Edwards, L Galey, J Reid

The charge: Rewrite Bulletin E3 as a Guideline Document: Well Abandonment Practices API Bulletin E3 2nd Edition xxxx, 2016 An abandonment cementing and barrier placement guideline to reside with SC 10 This will not replace upcoming Well Abandonment RP – Joe Shine WG 05 Rewrite will provide a guideline for the permanent and temporary abandonment of active and inactive wells: Provide a general approach and design considerations for well abandonment Placement of cement plugs Mechanical Barriers Protection of useable water and isolation of hydrocarbon intervals Does not discuss cement design Does not address specific regulatory requirements Not all inclusive. References to other API documents for detailed information

Summary of progress in the rewrite: Rewrite of API Bulletin E3 Group has now met 6 times since the charge The report in current form is agreed on by team A few edits remain – revisions of drawings, language Workgroup goal is to have the document ready for API Publication Committee by end of July 2016 Once completed the report will be sent out for review – Bernard Fraboulet

2016 Milestones Completion of document and delivery to Publications Committee by end of July, 2016 Document goes to ballot by winter meeting 2016