FAIR – the Universe in the labororatory

Slides:



Advertisements
Similar presentations
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Advertisements

Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
The Facility for Antiproton and Ion Research Günther RosnerNuPECC, FZ Jülich, 15/3/131.
J. Marton, ÖPG-FAKT, Weyer, September 27, FAIR at GSI and the Future of Hadron Physics J. Marton Institute for Medium Energy Physics Austrian Academy.
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
Lasers and Highly-Charged Heavy Ions at Günther RosnerHZDR Workshop, Rossendorf, 6/9/111.
1 Antiprotons at FAIR FLAIR SIS 100 / 300 pbar production Capture and accumulation deceleration High Energy Storage Ring for Antitprotons (HESR): 0.8–15.
Demands and Requirements for the New Control System for GSI Future Accelerators An Overview U. Krause, S. Richter, P. Schütt.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Future Penning Trap Experiments at GSI / FAIR – The HITRAP and MATS Projects K. Blaum 1,2 and F. Herfurth 1 for the HITRAP and MATS Collaboration 1 GSI.
FAIR – Status Report Walter F. Henning.
European Strategy Forum on Research Infrastructures Dr.- Ing. Beatrix VIERKORN-RUDOLPH ESFRI Chair NuPECC Long Range Plan 2010, 9 th December 2010.
Claudia Höhne GSI Darmstadt
Working Group 5 Summary David Christian Fermilab.
The FAIR Chance for Nuclear Astrophysics Elemental Abundances Core-collapse Supernovae The neutrino process The r-process nuclei in -Wind Neutron Stars.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
FAIR/SFRS meeting at HIPHeikki Penttila Oct 6, 2008 Facility for Antiproton and Ion Research FAIR is An international accelerator facility of the ”next.
NUSTAR Nuclear Structure, Astrophysics, Reactions NUSTAR is the biggest collaboration in FAIR The collaboration unites 450 scientists from 98 institutions.
The Facility for Antiproton and Ion Research in Europe Günther RosnerMESON2012, Krakow, 4/6/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
exchangeswith AnPHA AnPHA NSAC NSAC + ALAFNA Review status of the fieldReview status of the field Issue recommendations to advance t to advance the science.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
International FAIR Boris Sharkov FAIR / MEPhI Scientific Managing Director, Lomonosov MSU 2015 Sweden FranceIndia Finland GermanyPoland UK Romania Russia.
The FAIR* Project *Facility for Antiproton and Ion Research Outline:  FAIR layout  Research programs Peter Senger, GSI USTC Hefei Nov. 21, 2006 and CCNU.
Status and Perspectives for the NuSTAR collaboration Reiner Krücken Physik Department E12 Technische Universität München.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
UK Research in Nuclear Physics P J Nolan University of Liverpool.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt The Facility for Antiproton and Ion Research Peter Malzacher, GSI EGEE'09,
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
Preparation Phase of the FAIR Project
Status of the FAIR Project
Precision Tests of Fundamental Interactions with Ion Trap Experiments
English for young physicists WS 09/10 Niklas Müller
High energy beam transport.
ESR Slow highly charged ions and antiprotons
Status of the FAIR Project
Perspectives for Heavy-Ion Collisions at Future Facilities
Status of HESR 18th March Gießen Dieter Prasuhn.
Finnish participation at ISOLDE
Access to material testing facilities (WP10)
MATerials Research: Topics and Activities
FAIR ACCELERATORS Peter Spiller EMMI workshop
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
“Electron cooling device in the project NESR (FAIR)"
INTRODUCTION AND OVERVIEW. Operators training.
The FAIR Project Physics Programme of FAIR CBM PANDA NUSTAR
Ladies and Gentlemen, Let me give you a short outlook to the operating of the new facility at this point. My colleague has just shown you, how we operate.
Project "Nuclotron M" / NICA
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
and collaboration with France
Presentation transcript:

FAIR – the Universe in the labororatory An update – NuPECC meeting Oslo

Accelerator complex and experiments APPA ions, antiprotons C.B.M. relativistic nuclear collisions UNILAC SIS18 SIS100/300 p-Linac HESR CR & RESR NESR CryRing 100 m NUSTAR radioactive ion beams PANDA antiproton beams

FAIR civil construction site

SIS100 construction site

External Affairs: FAIR and ESA On 14 Feb 2018, ESA and FAIR signed a cooperation agreement at the FAIR campus in Darmstadt The central points of the cooperation agreement include the research fields of radiation biology, electronic components, materials research, shielding materials, and instrument calibration.

FAIR Phase 0

Accelerator upgrade measures Accelerator controls upgraded to FAIR controls UNILAC upgrade measures well advanced (vacuum, RF,gas stripper...) SIS18 FAIR booster mode (from 1 Hz to 2.7 Hz) SIS18 dipole power supply upgrade to ramp rate of 10Tesla/s ECR ion source upgrade from 14.5 GHz to 18 GHz ............

Beam time schedule 2018 23.02.201923.02.2019

2018 beamtime: highlights mass measurements of Lr and Rf isotopes chemistry of Nihonium Ag-Ag collisions with HADES mini CBM FRS run to produce new isotopes and measure properties halflives towards N=126 r-process waiting point neutron removal experiment (R3B) for symmetry energy commisioning and first experiments CRYRING, HITRAP..

   FAIR Phase-0 (2018 …) Facilities / Trapping & Storage Worldwide Unique Stored and Cooled Highly-Charged Ions (e.g. U92+) and Exotic Nuclei From Rest to Relativistic Energies (up to 4.9 GeV/u) FAIR Phase-0 (2018 …) FAIR Phase-1 (2025…) … making use of full MSV  research, employing FAIR instrumentation focus on storage and trapping first experiments at CRYING & HITRAP preparation of Phase-1  