First UCSB TEC Module (Pictures)

Slides:



Advertisements
Similar presentations
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Advertisements

Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 Hybrid & Module Testing Status Week of 6/6-6/10.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Strasbourg status Ring 7 pilot run François Didierjean.
UCSB Hybrid Bonding & Testing
APV Lectures APV FE Basic Building Blocks How Our Testing Works
Hybrid & Module Testing Status
Update of US Testing Status
APV Lectures APV FE Basic Building Blocks How Our Testing Works
UCSB Short-term Testing Plan
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Hamburg Bonding Report
Results from module testing
Unexpected Failures of Modules on Rods
US Module Production Quality
Recent TOB Developments
Vienna Module Production
Module Failures on RODs
Module Failures on RODs
FNAL Module Testing Status
On behalf of the US TOB testing group
Discoloration of Passitivation
US Testing Update Anthony Affolder (On behalf of the US testing group)
UCSB Short-term Testing Plan
The measurement set-up
Damage under UCSB bias bonds
Noise in TOB modules and sensor quality
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
UCSB Qualification Module Grading
Sensor probing (Summary)
Hybrid & Module Testing Status
Module Testing at UCSB: Simulated Production 11-04
Passitivation Location
Modules Produced With Low Rint Sensors
Anthony Affolder UC Santa Barbara
Module Testing Status Week of 6/14-6/20.
Noise in TOB modules and sensor quality
Production Status 39 modules produced
Electrical Testing at UCSB: Hybrids, Modules, & Rods
Is Increased Bias Current and CMN Correlated?
Isolated Bad-CAC Strip at UCSB
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
Università di Catania and INFN – Sezione di Catania
FNAL Hybrid Testing Status
Presentation transcript:

First UCSB TEC Module (Pictures)

First UCSB TEC Module (Bias Ring) Due to angle and height differences, it is difficult to bond the bias return between PA and sensor. Nearby channel #512 bond limits bonding space

First UCSB TEC Module (Noise) Faults Two sensor opens Channel 27 PH sensor DB Channel 408 PH due to bonding Bonding fixture needs slight fine tuning to hold securely Channel 302 Open APV-PA One Sensor opens Channel 306 Noisy Channels 407,409 Due to PH in bonding Grade B (1.1% bad channels)

First UCSB TEC Module (Charge Injection)

First UCSB TEC Module (IV) Slightly than higher bias current due to pinhole formed during bonding