How & When to Get Permits for Work in Your Home

Slides:



Advertisements
Similar presentations
Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
Advertisements

PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Architecture CAD living sleeping service SPACE PLANNING
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Why we need a new Building We are now a 1,000 member club. The current structure was designed to accommodate 200 (on its best day) The current.
GE-final House of fun………... ROOF Solar power and wind powered house 4 wind intakes that transport collected wind into a wind turbine to produce electricity.
Heating, Ventilating, and Air-Conditioning (HVAC)
Chapter 7 Estimating Plumbing, HVAC, and Electrical Work.
PERMITS & INSPECTIONS DEPARTMENT 2003 INTERNATIONAL RESIDENTIAL CODE IRC.
Civil Engineering & Architecture 2.3 Residential Design.
Futureview Solar Solutions Elysburg, Pa. Call
The Virginia Uniform Statewide Building Code 2003 Edition Effective November 16, 2005.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
Visitability Standards Dan McNabb, Deputy Building Official Planning and Development Review Department.
Hope VI Residents Deserve Green Housing Affordable, Healthy Home Design Choices.
Building Description Wayne Foss, MBA, MAI Wayne Foss Appraisals, Inc.
7 Set of Floor Plans Primary Considerations
Residential Architectural Plans
3.0.0 – Service Area. Service Area:  Kitchens – (Types and Layouts) Kitchens – (Types and Layouts)  Bathrooms / Powder Rooms Bathrooms / Powder Rooms.
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Meet the DBI Pros Summit October 11-12, 2007 Isam Hasenin, P.E., C.B.O., Director How To Obtain a Permit.
King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye.
Presented By: Wanda T. Lindstrand 4757 Highway 17 Bypass ∙ Myrtle Beach, SC What You Need to Know About… FHA 203(k) Rehabilitation Loans.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
HVACR116 – Trade Skills Mechanical Drawings.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
ARCHITECTURAL DESIGN Residential Architectural Plans 1 Copyright © Texas Education Agency, All rights reserved.
Building Codes and Interior Design
Finishing the Building
CONSTRUCTION Objective You will need to write all the information down but you need to highlight, mark, or note that the items in yellow are important.
Residential Permit Requirements. When do I Need a Permit A new building, structural change, addition, finishing and unfinished area Deck Covered porch.
Affordable housing project
Electrical Plans.
Chapter 7 : Construction 1. Adobe – a mixture of clay and straw used as a structural material in the Southwestern United States.
Drafting 2 (Arch) Quiz Review #2 Quiz Review. 1.Name the building parts that have been preassembled either in a plant or on-site. Sills Jambs Mullions.
Slide 1 of 33 Home Inspection Class Redfin’s Montgomery Team September 5, Bethesa, MD Host: Michael Wells & Margaret Plumly Like:
Hillsborough Building & Planning. Green Building 101  Efficiency of buildings and responsible use of water, and construction materials  Reducing building.
Permit Process & Application Guide
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Drafting 2 (Arch) Quiz Review #3 Quiz Review. 1.Dashed lines that follow the counters in a kitchen floor plan most likely represent: A dishwasher Upper.
Day 1 Part 1 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Components of Construction part 2
Fundamentals of Construction
White Pigeon Community Schools
The art and science of designing and construction of buildings.
ACCESSORY DWELLING UNITS: CLEARING UP THE CONFUSION
24172 Vista D Oro, Dana Point CA 92629
LenderSelect Mortgage Group Education for Renovation
Department of Permits, Licenses, and Inspections
Foundations of Technology Construction
Major Steps In Building a SFR
How Completed Interiors Are Achieved: Designing & Building
Chapter 6 Primary residential design Considerations
City of Healdsburg Construction Codes Amendments & Adoption: 2016 Building Standard Codes Title 24 Parts 1 Thru International Property Maintenance.
Electrical Gas Plumbing Heating & Cooling
Fundamentals of Construction GTT – Unit 7 – Green Architecture
City of Santa Cruz Accessory Dwelling Unit Development Program
HOUSE HUNTING WORKSHEET
BUILDING INSPECTION Amy Link, Assistant Director of Development Services Ken “KC” Crow, Building Official Lisa Mann, Office Manager.
Architectural Drawing
Fundamentals of Construction Gateway – Unit 7 – Green Architecture
R Single-Family Home Repair Exemption
House Construction Budget Plan
Foundations of Technology Construction
Week 5 Drafting and Dimensioning the Architectural Floor Plan.
Property Module IV Replacement Cost Determination
Recent Bond Accomplishments
Building standards Mr. Da Silva.
Floor Plans and Symbols
Presentation transcript:

How & When to Get Permits for Work in Your Home Presented by: The City of Corpus Christi Development Services

Residential Permits Demolition Reroof Fence Swimming pool Foundation Repair Exterior Window Replacement Exterior Doors Additions, Remodels and Renovations Shed Attached/Detached Garage Deck Dock/Boatlift Carport or patio cover, Attached or Detached Irrigation Solar Panels Water Heaters HVAC Change out Garage Doors Siding Driveways & Sidewalks (in City Right of Way)

Site Plan Requirements An overview of your property that includes: Existing structures New structures Setbacks A survey may suffice if available

Remodel/Renovation Permits Interior/exterior remodeling Non-structural renovations Inspections may be required for: Frame, Insulation Final Interior Demolition for reuse/remodeling interior space: Wall/ceiling removal Cost of job Detailed scope of work

When DO I Need a Permit? A permit is required if you are… Removing or replacing siding Replacing windows and doors Replacing subfloor/foundation repair Installing or replacing insulation Framing or re-framing of walls Demolishing a bathroom or kitchen Removing some or all interior walls Removing some or all sheetrock or insulation

When DON’T I Need a Permit? Exemptions Broken glass replacement Existing door/hinge replacement Paint/wallpaper & sheetrock repair (less than 32 sq. Feet.) Carpet, tile, wood, laminate flooring Cabinets

Room Additions Attached or Detached & Increasing SF: Detached addition limited to 50% of the primary structure sq. footage or 500 sq. ft. Documentation needed: Permit Application Required Documents (see checklist)

When DO I Need a Permit? A permit is required if you are… Adding to your kitchen or living room Enclosing an open patio, garage or carport. Expanding to the rear, side, or front of existing home Building a new attached bedroom

Removing a Structure? Full or partial demolition Documentation needed: Reviews required: Zoning and Building Documentation needed: Completed Demo/House Move Utility Disconnect Form.

When DO I Need a Permit? A permit is required if you are… Demolishing attached partial/sections of primary structures Removing additional rooms or patio covers Full demolition of homes Demolishing accessory structures City ordered demolitions

Re-roofing? Replacing Documentation needed if: When roof coverings are installed or replaced Documentation needed if: Changing material to concrete or clay t ile Engineer’s Agreement to inspect: WPI 1-3

When DO I Need a Permit? A permit is required if you are… Replacing shingles (except if less than 100 Sq. Feet) Changing the slope of roof Removing and replacing roof decking Changing the roof material

What About Your Foundation? New or replacing Slab on grade Pier and beam Documentation needed: Design letter from Engineer at time of processing. Design documents or drawings from engineer.

When DO I Need a Permit? A permit is required if you are… Repairing/replacing piers Repairing/replacing footings New/replacing wood sill and beam

Planning a Pool ? In-ground requires a permit Required Application Electrical Plumbing Above ground require a permit if more than: 5,000 gallons 24 inches deep Documentation needed: Site plan POA/HOA Approval if applicable

When DO I Need a Permit? A permit is required if you are… Enlarging an existing swimming pool Building an in-ground pool Adding an in-ground hot tub or spa Installing an above ground pool exceeding 5000 gallons or 24 inches in height

When DON’T I Need a Permit? Exemptions Installing a prefabricated less than: 24 in. deep 5000 gallons 1

Accessory Permit Sheds, garages, decks, docks, boatlifts, carports, patio covers or solar panels 1 story Inspections may apply for: Layout/Setback Frames Foundation (engineer report) Insulation Final

When DO I Need a Permit? A permit is required if you are… Installing a pre-manufactured cover or building a new one Building an attached front porch or rear patio cover Building a cover detached from the primary residence over 200 SF All garages require a permit Expanding existing 1-car to a 2 car garage Relocating garage Replacing garage door

What About Your Fence? New, greater than 7 Ft. in height Documentation needed: Site plan Fence height Fence over 7 Ft. in height will require a design by a Texas registered engineer.

When DON’T I Need a Permit? Exemptions Playground equipment Fences less than 7 ft. high Accessory structures 200 Sq. Feet or less.

Wanting a shed? Storage and detached Documentation needed: Need a permit if larger than 200 Sq. FT Documentation needed: Permit Application Required Documents (see checklist) Inspections needed: Layout/Setback Foundation (Engineer Report) Frame Final

What About a Garage? Attached or detached If detached, must be less than 50% of the primary structure. Documentation needed: Permit Applications Required Documents (see checklist)

Patio Covers and Carports Attached structures Detached larger than 200 sq. ft Documentation needed: Permit application Required documents (see checklist) Inspections: Layout/Setback Foundation, Engineer Letter Frame Final

Building a Deck? Need a permit when: Documentation needed: Larger than 200 SF More than 30 in. above the ground Documentation needed: Permit application Required documents (see checklist) Construction details Anchorage, beam sizing, footing details, decking material types, stair design, and guardrail details

Docks and Boatlifts Need a permit when: Documentation needed: ALWAYS Permit application Engineered stamped documents Site Plan May require Texas General Land Office Authorization Electrical Application if applicable

Trade Permits For a Mechanical, Electrical or Plumbing permit you may either contract with a Texas licensed contractor or obtain homeowner permits.* To check if a contractor is registered with the City, please call 361-826-3240. *Homeowners performing their own mechanical, electrical or plumbing work on their homestead may apply for a trade permit. Exception: New or alternations to natural gas service systems must be permitted by and installed by a state licensed plumber.

Mechanical Permits Needed if… NOT needed when… Installing duct outlets or system Installing a new A/C unit Installing a new heat furnace Adding or moving a hood vent in kitchen Adding exhaust fan in restroom NOT needed when… Installation of a portable HVAC appliance Replacement of a minor parts as long as the equipment does not become unsafe

Mechanical Permits Heating & Air Conditioning (HVAC) Inspections: Rough-in Final

Electrical Permits Needed if… NOT needed when… Replacing meter loop or panel Adding receptacles or outlets Adding new circuits Adding new lights Adding a new Dryer Plug Rewiring House Adding Solar panels NOT needed when… Cable, telephone, communications cables operating at less than 50 volts

Electrical Permits Needed for ALL electrical work Inspections; Rough-in Final Other inspection may apply depending on scope of work

Plumbing Permits Needed if… Not needed when… Installing a gas or electric water heater Adding water lines Connecting to sewer lines Extending gas piping systems Installing or replacing a drain or vent Installing irrigation system or backflow preventer Not needed when… Stopping and repairing leaks in drain or water pipes Clearing drain stoppages Removing and reinstalling a plumbing fixture (no modifications)

Plumbing Permits Homeowners can apply for one if: Homestead exemption Inspections: Rough-in Top out Final Other inspections may apply depending on scope of work.

Certificate of Completion/ Occupancy