Benefits of utilizing Edwards EST3 system for Emergency Paging application at OPGN.

Slides:



Advertisements
Similar presentations
A Service Disabled Veteran Owned Small Business. A FULL SERVICE ELECTRICAL CONSTRUCTION COMPANY.
Advertisements

Online Tenant Request System Reliable and accurate, the IMPAK online tenant request system significantly reduces telephone time and paperwork.
Preferred Instruments CB-Hawk Replacement System Based on BurnerMate TS Technology A low-cost upgrade for obsolete CB-Hawk systems.
Preferred Instruments CB-Hawk Replacement System Based on BurnerMate TS Technology A low-cost upgrade for obsolete CB-Hawk systems.
An Alternative PV Module Manufacturing Model Ed Hurley September 6, 2011 An Alternative PV Module Manufacturing Model Ed Hurley September 6, 2011.
HWg-Juno HW group is a manufacturer of IP-based sensors from Prague, Czech republic. HWg delivers remote monitoring & control solutions.
Hexawares Test Accelerator for eBaoTech® GeneralSystem Software.
The New User Interface MEDITECH Training & Education.
Emergency Transfer Controls
What is it? What is e-BRIDGE Job Point?  e-BRIDGE Job Point is a utility that shares the load of a large print job across multiple e-STUDIO MFD’s. Harness.
Introduction Total Recall – The Innovative and Professional Choice in Communications Recording V
Total HVAC Control from anywhere Easy control that can save a fortune
Please open full screen The new effective way for reducing costs in construction projects.
1 Bosch Solution 16i Intrusion Control System. 2 STAU/SAL | March 2010 | © Robert Bosch GmbH reserves all rights even in the event of industrial property.
©LRI ULC S VERIFICATION OF FIRE ALARM SYSTEMS PART # 6 SYSTEM MODIFICATIONS Presentation for CFAA Annual Seminar May 5, 2010.
Security Systems BU Communication Systems Slide 1 Plena Voice Alarm System Commercial Presentation.
DOL AME Grant RFPs Manufacturing Lab Equipment Pre-Award Webinar July 25, 2013.
ONYX Digital Voice Command
Computerized Maintenance Management System | May 15, |1 | Computerized Maintenance Management System Presented By [Presenter Name] [Presenter Title]
MXL to FireFinder XLS Total Migration Solution
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
 Wireless, Web-Based Monitoring System  Alarm/Event Notifications by Text Message and or  VPN Connection for Fast Response to Alarms and Events.
Equipment for VRI zone control – up to 5400 management areas Valley PRO2 + Valley VRI.
Overview Presentation MKT-CODE-P-001E. Introduction Single Channel Codec designed to increase the flexibility of NetVu Connected analogue/IP CCTV networks.
MULTIMEDIA ALARM SERVICES. The current Alarms Business Model.
Wireless Fundamentals Lesson 2: Implementing A New Wireless System Bellevue Community College Bob Young, Instructor.
© 2014 Emergency CallWorks - Confidential Out of Sight, Out of Mind And Out of Danger Cloud Hosted innovation beyond next generation.
1 Product & Technology Quality Excellence Support American Global Products Product & Technology TeSysPort Ethernet Interface for TeSys June 5, 2007.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
Envision a Unified Campus. PRODUCT SOLUTIONS BELL & PA|CONSOLIDATED SYSTEMS Why SchoolView Bell & PA? REDUCE classroom interruptions.
A First Look at WirelessHART ® An e-book by Pepperl+Fuchs.
® MTAC WG #135 Transportation Management Systems (TMS) Combined Data Limitations November 18, 2010.
WELCOME TO SEMINAR ON SCADA WELCOME TO SEMINAR ON SCADA Presented by: ANIL KUMAR RAUT Adm No:33IE/2k.
MARKETS MOTION CONTROL SOLUTIONS FOR MOTION CONTROL SOLUTIONS FOR PMPM Textile Machinery Textile Machinery Plastic Machinery Plastic Machinery Packaging.
CALL US ON +44 (0) VISIT READ Product Demonstration.
E VERY L IFE H AS A P URPOSE… FlameGard 5 MSIR Flame Detector.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Software Development Life Cycle by A.Surasit Samaisut Copyrights : All Rights Reserved.
Firefighter III Module C Communications (4-4) Identify the policy and procedures concerning the ordering and transmitting of multiple alarms.
Scott Muench - Technical Sales Manager
Implementing EHR in Home Health Care Component 11/Unit 9d An example on the Implementation of a Point of Care System.
1 Review of Specifications for Digital Upgrades NHUG Summer Meeting July 17, 2008 Tim Mitchell Component Engineering Palo Verde Nuclear Generating Station.
Unit 19 Computer Music Systems 1 Examine the hardware options available for the composition and production of music using computer technology assess the.
BPM stripline acquisition in CLEX Sébastien Vilalte.
What is “Constructability”?
Rohde & Schwarz Topex TOPEX IP Radio Gateway July 2011.
PROPRIETARY INFORMATION - © 2015 WOODWARD, INC. PAGE 1 HighPROTEC-2 MRI4-2 Feeder Relay Sales presentation 2015/08/10.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Security Systems BU Communication Systems Slide 1 Plena Voice Alarm System Phase 2.
Anna FLESSA, Dipl.-Ing. Researcher of KEPA Aliki – Nefeli MAVRAKI, MSc. Researcher of Climate Change unit, KEPA National and Kapodistrian University of.
HighPROTEC-2 MRM4-2 Motor Protection Relay Sales presentation
ControlEdge™ PLC. System Integration. Design Flexibility. Connectivity
Parts.cat.com Client training 2017.
Multi-Purpose Reconfigurable Training System (MRTS) Overview
HighPROTEC-2 MCA4-2 Directional Feeder Relay Sales presentation
Standard Business Processes
Innovation of the House
CIMConnect Tools to enable equipment suppliers to efficiently develop powerful SECS/GEM interfaces.
CAIRE Complete Non-Delivery Solution
Chapter 22 Building Automation System Retrofit of Existing Systems
2N SIP Audio System.
HighPROTEC-2 MRDT4-2 Transformer Protection with differential Sales presentation 2015/08/10.
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
Customers Customers Input Output Product
Order Processing and Requisition Accelerator
Advantages access the applications in any place, any time. They do not need a wired connection. use both telephone signal and WiFi (for high end models)
Systems Management Privilege Management User Migration.

Standard Business Processes
Field installable, upgradeable and scaleable
Presentation transcript:

Benefits of utilizing Edwards EST3 system for Emergency Paging application at OPGN

Advantage – Existing Equipment Compatible with existing EST3 Fire Alarm equipment, digital audio amps plug in. Flexible audio configurations– multipriority remote page inputs, zones outputs (suit com, etc) Simple Interface to existing FireWorks for MCR/ERT/Control Maintenance. Optional automated daily test tones at pre- set times – pre-recorded messages

Advantage – Operating Experience EST3 systems AFS at all operating units in Ontario. OPGN CATids already exist for most equipment – just need to add amps, etc. Design/Projects group EST3 trained. Control Maintenance EST3 trained. Spares parts for EST3 in stock. EST3 Software procedures exist now. EST3 Maintenance procedures exist now.

Advantage - Qualification Meets fully the requirements of NBC 1995 and CSA/N Audio is ULC Listed for Emergency use EST3 system is OPGN qualified, been through HFE before. Software is currently CAT3 categorized EDWARDS and EST3 product meet QL3/QL4 requirements

Advantage – Cost Effective Non-nuclear grade. Commercially available equipment Can be interfaced to existing J-Boxes, minimum re-wiring Minimal project length - Pre-qualified and categorized, ready to purchase. EDWARDS Direct pricing available to OPGN

Advantage – Faster Compliance Cost Effective – easier to budget over 1 year instead of 3 or 4 Equipment Already Qualified – jump to design/implementation stage Previous OPGN Operating Experience – accelerated implementation Flexible Installation to reduce field work Access to Edwards direct.

THANKS