Reviewing Daily Transactions DPI Vehicle Fleet Management DR-3

Slides:



Advertisements
Similar presentations
September 17, 2004 Revised 11/8/2012 DPI Vehicle Fleet Management OP-1 1 Use this procedure to review and print DP02 MI/PM work orders scheduled for your.
Advertisements

North Carolina Department of Public Instruction Transportation Services December 2014 Craig Warren Transportation Consultant Inventory Training Module.
North Carolina Department of Public Instruction Transportation Services December 2014 Craig Warren Transportation Consultant Inventory Training Module.
9/16/2003; Revised 7/12/2004 DPI Vehicle Fleet Management IM-1 1 Use this procedure to extend material master data to another plant. 1.From the SAP R/3.
CREATE NEW ITEM RECORD ORDER ENTRY SYSTEM - O/E DAILY PROCESSING MENU - ORDER ENTRY.
Purchase Order Creation Manually or automatically With or without reference to other documents Data Documents: Purchase requisition, Purchase order, RFQ,
Material Number (DOT#) Search DPI Vehicle Fleet Management IM-5
Issuing Material to Work Orders DPI Vehicle Fleet Management
DPI Vehicle Fleet Management
DPI Vehicle Fleet Management- DR-14
DPI Vehicle Fleet Management OP-7
PO INVOICE ENTRY Creating a PO Invoice Let’s Get Started
Indent markers In some cases, you may want to have more control over indents. Word provides indent markers that allow you to indent paragraphs to.
DPI Vehicle Fleet Management DR-20
Report of All Materials Used on a Vehicle
Display Time Confirmations DPI Vehicle Fleet Management DR-5
Display Material Master DPI Vehicle Fleet Management IM-3
Create Odometer Measurement Documents
Cancel Time Confirmations DPI Vehicle Fleet Management TE-4
DPI Vehicle Fleet Management DR-6
User Manual for Extracting the Defaulting Report from SAP
DPI Vehicle Fleet Management DR-21
DPI Vehicle Fleet Management DR-18
DPI Vehicle Fleet Management IM-4
Two methods to observe tutorial
Report of Non-Stock Purchases for Work Orders
W/o Completing a Physical Inventory DPI Vehicle Fleet Management IA-1
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
DPI Vehicle Fleet Management DR-10
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
(Work Orders W/One Operation) DPI Vehicle Fleet Management TE-2
Two methods to observe tutorial
Verify Charges under ZFB61 DPI Vehicle Fleet Management NS-3
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Two methods to observe tutorial
Annual Physical Inventory Procedures
Presentation transcript:

Reviewing Daily Transactions DPI Vehicle Fleet Management DR-3 MB51 Use this procedure to review the daily receipts and issues that have been processed. From the SAP R/3 System Easy Access screen or from your favorites, enter or select transaction code MB51. Click or press Enter. On the Material document list screen, enter the following information: - Material (Enter material number or leave blank if you want to see all receipts/issues for the time period selected). - Plant - Storage location(s) (optional) - Movement type* Enter a date range in the Posting date from and to fields. Accept Layout displayed. Click . The report displays: Movement Type Material document number Posting date Quantity Work order number (for issues) Amt in Loc Currency Additional information may be added. Click . On dialog box, click on Position. From the Hidden fields section, select Ext. amount in local Curr… Click to move it to Position/Line 1 side. Click on Line 2 tab. Select Purchase order and User name from the Hidden fields column. Click to move to Position/Line 2 side. Click on Copy. For fuel, the exact cost of the fuel based on quantity and moving price is displayed. The purchase order associated with movement type 101 receipts and the person entering the data is displayed. Click to exit this transaction. Basic Commands Back Cancel Help Exit Enter Save Execute Material documents are identified by the following numbering sequence: Good Issues and Transfer Postings (includes fuel) = 4900000000 range Goods Receipts = 5000000000 range *Fuel Receipts: Movement Type 971 *Material Receipts: Movement Type 101 *Fuel/Material Issues: Movement Type 261 December 2003 Revised 3/2006 DPI Vehicle Fleet Management DR-3