DAQ Equipment Status 2 fully equipped Vienna boxes at UCSB and FNAL

Slides:



Advertisements
Similar presentations
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Advertisements

TEC Production in the US N. Bacchetta, J. Incandela,…and October 14, 2003.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
TEC Production in the US J. Incandela Level 2 Manager US CMS Silicon Tracker Project October 8, 2003.
Status of UCSB LT Testing All 10 slots are equipped with UTRI, PAACB and adapter boards. All 10 UTRI connected to multiplexer. All 10 slots have HV connections.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
1 Long Term Module Testing-Anthony AffolderTPO, December 11, 2003 Current Module LT Testing Capability Only Vienna Boxes Available  10 slots at each site.
US CMS Si Tracker Project presentation to the Program Management Group at Fermilab; 22 October 2004, J. Incandela (UCSB) 1 US CMS Silicon Tracker Project.
US Module Production Status Joe Incandela University of California Santa Barbara for the US CMS Silicon Tracker Group CERN Tracker Week July 2004.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
US Module Production Prof. J. Incandela US CMS Tracker Project Leader For the US CMS Tracker Group Tracker Meetings - CERN Feb. 13, 2004.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
PIXEL CAEN Installation Status
University of Wisconsin
US TileCal Meeting at UT Arlington
10/month is the present production rate 2 FTE + sporadic contributions
ROD assembly and test in US
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
Hybrid & Module Testing Status
US Module Production Status
UCSB Testing Status Anthony Affolder
Results from module testing
Unexpected Failures of Modules on Rods
UCSB Testing Status Anthony Affolder
Recent TOB Developments
Hardware Needs (Near Term)
On behalf of the US TOB testing group
First Assembled Rod in US
US Testing Update Anthony Affolder (On behalf of the US testing group)
Operations/Failure Analysis
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Hybrid & Module Electrical Testing
US Hybrid/Module/Rod Testing Model
FNAL Hybrid Testing Status
Electrical Testing at UCSB: Hybrids & Modules
US Module Testing Progress Report
Hybrid & Module Testing Status
Current Module LT Testing Capability
Operations/Failure Analysis
Current Module LT Capability
Operations/Failure Analysis
FNAL module testing summary
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
US Module Testing Progress Report
Operations/Failure Analysis
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Hybrid & Module Testing Status
Equipment Status ARCS equipment status DAQ equipment status
Hybrid & Module Testing Status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

DAQ Equipment Status 2 fully equipped Vienna boxes at UCSB and FNAL UCR Vienna box has enough DAQ equipment for 4 slot stand TPO needed for 6 slots 2 single-rod stands Just received enough oMUX cards so re-cabling between rod types unnecessary 2 multi-rod thermal cyclers Both MUXs have been used to test 5 rods tested simultaneously Have enough equipment to fully commission system Only 5 MUX cards + DAQ spares missing To instrument UCR Repair Center & have all critical spare components required in the US we need: 2 TSC – in production? 3 TPO – in production? 2 eMUX boards – “ “ 7 oMUX boards – “ “ 5 VUTRI - in production 10 PAACB – half are built, half being assembled now 10 hybrid-to-utri adaptors – in production

DAQ Equipment Status II With current TPOs : With 1 failure we lose either: 70% capacity of a Vienna box 1 single rod system 1 multi-rod system Cannot run more than 16 APVs in UCR stand Without the additional MUX, VUTRI, PAACB, hybrid-to-utri adapter boards Can’t run UCR LT at full capacity which is crucial to ops of US Repair center With current TSC complement: With 1 failure we lose either: 1 Vienna box 1 single rod stand, or 1 rod thermal cycler Component shortages and failures ↔ potential to severely limit production testing capacity