Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Construction and Installation of the CLIC Experimental Area
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Long-Baseline Neutrino Facility LBNF Summary of FSCF Final Design Parameters Meeting at SURF, 10 Aug 2015 Elaine McCluskey, LBNF Project Manager EFIG 19.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
DR to RTML ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Damping Rings Lattice Evaluation Mark Palmer Cornell University January 19, 2011.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February Design Brief for external design.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Specifications for Central Region Layout
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Conventional Facilities and Siting Global Group (ARCFS)
Introduction and Meeting Objectives
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
Americas KlyCluster Cost Analysis Overview
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
ILC GLOBAL SYSTEMS MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
ILC - Global Design Effort
Presentation transcript:

Tom Lackowski Revised 10/12/2011 IR Hall Overview Tom Lackowski Revised 10/12/2011 Sep. 2011 LCWS11 Global Design Effort

Design Development IR Halls Damping Rings Positron Source RTML Meeting in Orsay -May Arup Meeting in London - July Damping Rings Meeting w/ Mark Palmer at Fermilab + Webex participation w/ Susanna Guiducci May and Sept. Damping Ring Baseline Review INFN-LNF July Positron Source Meeting at Fermilab W/ Wie Gai and Wanming Liu - Aug RTML Several meetings at Fermilab W/ Nikolay Solyak Aug./Sept. Sep. 2011 LCWS11 Global Design Effort

ILC Overview Sep. 2011 LCWS11 Global Design Effort

IR Hall in context of Central Region Sep. 2011 LCWS11 Global Design Effort

Current drawing does not show all of the life safety cross connections The geometry of the IR Hall, Damping Ring, PLTR and ELTR are inter related. The plan shows an estimated 20 meters of rock between Damping Ring and IR Hall for structural considerations. Arup to verify. Rock massing for IR Hall Stability for Damping Ring Current drawing does not show all of the life safety cross connections Sep. 2011 LCWS11 Global Design Effort

Parallel Sessions - September 28 am cont. Joint Session with MDI/Detectors T Lackowski - Overview of Central Region Development J Osborne - Status of ARUP Consulting Y Sugimoto – Update on Japanese Mountain Site K Riles – R&D Update for SiD Final Focus Magnet Alignment Several Different IR Layouts are Under Consideration Regional/Local Conditions will have an Impact on IR Hall Design Americas Region IR Japanese Mountain Site IR SiD IR CLIC IR

Parallel Sessions - September 28 am cont. Joint Session with MDI/Detectors Discussion Focused on Alternative IR Layout Proposed by M Oriunno Dimensions Still Need Verification by ILD “Z” Shape for IR Hall is the Consensus Shape for European and Americas Region Shaft Number, Arrangement and Locations are Still Under Consideration Overall IR Design Still Needs Review With Respect To: Detector Assembly Methods Crane Coverage Use of Platforms Detector Maintenance SiD IR

Plan Development Drawings presented at the July Arup meeting and criteria discussed at May Orsay meeting are the basis for current plan. “L” shape provides opportunity to explore functionality and structural competency of alternate designs. Shaft costs in RDR estimate approached 50 percent of underground excavation cost. Both the shaft size and the number of shafts are cost drivers. Date Event Global Design Effort

Current layout Date Event Global Design Effort

Ø18 m Ø8.5 m July Arup Meeting

Detector Dimensions Sep. 2011 LCWS11 Global Design Effort

Vertical Hall Requirements Arup study will help determine platform height. Need to understand cryo distribution Date Event Global Design Effort

Crane Coverage Optimal crane coverage is an important feature for constructing and servicing the detectors. For top riding bridge cranes hook approach is 3.5 to 4 meter from end of runways and 1 to 1.5 meter from end of bridge. Cranes cannot reasonably or safely have over-lapping coverage. Crane and cryo distribution need to be compatible Date Event Global Design Effort

Cranes, Cryo Distribution and Rock Massing must be Compatible July Arup Meeting Sep. 2011 LCWS11 Global Design Effort