Pedestals Existing and Future.

Slides:



Advertisements
Similar presentations
James J. Viau, Administrator Office of Real Estate
Advertisements

Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Industrial Boilers Steam generators Closed vessels made of steel and
Virginia Land Use Law 101 Transition Area/ Interfacility Traffic Area Committee May 2, 2013.
MultiRail Horizontal Anchorage Device
HEAT LOSS If the conservatory is not heated from the main heating system or it has an external quality door fitted i.e. double glazed patio or similar.
Planning Legislation – Prof. H. Alshuwaikhat ZONING Zoning is the division of a municipality, city or town into districts for the purpose of regulating.
Specification Discussion
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
A PRESENTATION TO THE LODI UNIFIED SCHOOL DISTRICT BOARD OF EDUCATION Prepared by Facilities and Planning August 7, 2012.
Derrick Terry Renewable Energy Specialist Derrick Terry Renewable Energy Specialist Respect, Integrity, Teamwork and.
Contributions In-Aid and Development of Fees Utility Financial Solutions Mark Beauchamp, CPA, CMA, MBA President
September 2005Urban Planning Carleton University 1 Zoning By-Laws & Land Subdivision Official plan of a city provides the basis for: –Planning public facilities.
© OnCourse Learning Chapter 25 : Land-Use Control.
Site survey (hands-on). Configuration 1 A financial institution (part 1 - Headquarters) Position - 2 C F E B C F E E F No Communications Acceptable Poor.
Real Estate Principles Tenth Edition Chapter 25 Real Estate: An Introduction to the Profession Tenth Edition Chapter 24.
1 Suitable for copper, fiber optics or hybrid outside plant applications Cross Connection Cabinets.
© 2010 by Cengage Learning Chapter 25 / Chapter 24 ________________ Zoning/ Land-Use Control.
Name ________________ Unit 6/P7 – Environmental Implications (what do developers need to take into account when building) Noise Nearby Residents Hours.
TELECOMMUNICATIONS SPACES
September 2005Urban Planning Carleton University 1 Functional Planning Standards & Guidelines __________________________.
Redevelopment in the Resort Housing District To the Sanibel- Captiva Chamber of Commerce Nov. 29, 2011 Prepared by: Planning Department.
Terminal Splitters in a Cabinet December Terminal Splitters in a Cabinet The purpose of this presentation is to share our findings around the.
Investigation into the Mounting of the 3M BRCP Splitter Blocks in the Whisper Cabinet 24 October 2008.
Bottineau Rezoning Study University Neighborhood Network Mary Kaiser, Phil Kelley, Ashley Kobberdahl.
DSLAM Configuration in a Cabinet Heat and Noise testing December 2008.
National Diploma Mechanical and Electrical Services Construction Cold Water Supplies.
Offering Hope & Delivering Help
Under floor heating Designing underfloor heating (UFH) system must always comply with the system suppliers instructions.
Sustainability Assessment of Family House - Case Study
Biomass Understand the fundamental principles and
Minimum Set of Requirements for Suppliers
Micro wind Understand the fundamental principles and
Minimum Set of Requirements for Suppliers
SCE “To-Code” Pilot Lessons Learned
Refrigeration Issues and Developments
EMERGENCY ESCAPE SLIDING CHUTE SYSTEM ( A Patented David Device )
AR-315 BUILDING CODES & BYE LAWS
PIPE SPOOL WELDING SYTEM – LIGHT VERSION
INTRODUCTION TO NETWORK CABLING
Sub-Loop Extension Service (SLES)
Geographic De-averaging
SBU Digital Infrastructures NEW LINKEO – Freestanding cabinets
CHAPTER 5 TECHNICAL ANALYSIS.
Problem Formulation Case Studies
Economic Development & Housing Committee August 21, 2017
South Carolina Perspective on Part 61 Proposed Revisions
Sub-loop Cabinet Information
City Council Meeting October 23, 2017
Industrial Boilers Steam generators Closed vessels made of steel and
Problem Formulation Case Studies
COMPLIANCE CHALLENGES FACING OWNERS OF UNDERGROUND STORAGE TANKS
ADAGIO.
2017 citywide parking study
Engineering Project Cable Management.
GENERAL CONCEPTS RELATED TO BUILDING
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Multifamily Housing Tax Exemption Program
The Acorn Medical Practice, Wood Street, Mansfield
Application for Zoning Amendment
PA LS Burnt Store Area Plan
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Clarke Street Rezoning Bylaw 3161
STATUTORY PUBLIC MEETING #1
UNIT I.
UNIT I.
North Carolina Department of Insurance Office of State Fire Marshal
In the previous chapter we studied simple straight-line motion—linear motion.
Section 8: SIGNS.
Problem Formulation Case Studies
Presentation transcript:

Pedestals Existing and Future

Pedestals – key points Chorus has pedestals, but our design will need to be reviewed in light of the recent National Environmental Standards Chorus will offer pedestal co-location services to our customers on a commercial basis Once installed, space management within a pedestal will be subject to the terms of the Sub-loop Services STD.

National Environmental Standard (NES) The National Environmental Standards for Telecommunication facilities came into force in September 2008. The regulations set out various telecommunication plant that can be installed under this umbrella if they fall within various conditions.

NES and the Cabinet(s) The regulations set the footprint a cabinet can occupy and the maximum height – i.e. 1.4m2 and 1.8m respectively for Urban residential areas. They also set noise requirements external to the cabinet. A second cabinet can be placed along the first cabinet in an urban residential area if: it can be contained within the 1.4m2 footprint; and it is no higher than 900mm from the concrete foundation plinth. The alternative is to place the second cabinet a minimum of 30 meters away from the first Note that there are other conditions that may apply depending on the area’s classification in the relevant District Plan.

Existing Pedestal The existing pedestal: 19” rack mount vertically mounted; 11RU mounting space; 450 watts heat dissipation; no local power; and all services and terminations are in the parent cabinet The cabinet does not comply with the National Environmental Standards as a second cabinet on a common site. The pedestal’s height of 1095mm exceeds the 900mm limit Note that it can still be installed either 30 metres away or apply for permission outside the NES

Proposed Pedestal Redesign Initial discussions have been held to design a pedestal which complies with the NES. With the experience of Eaton it is expected that the redesign will be very straight forward. Depending on the changes required, a new version would require about 3 months for design and prototype production. It would be another 2 months before a new pedestal would roll off the production line.