WELCOME State Road 50 (Cheney Highway) Overview and Methodology

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Silver Star Rd. (SR 438) Public Meeting Public Information Meeting Intersection Safety Improvements Silver Star Road (SR 438) at Ocoee Hills Road From.
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Miccosukee Road Resurfacing and Re-striping Public Input Requested On-Street Parking vs Bike Lanes.
Ch. 7 – Parallel Parking NY State DMV.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
STA Safety Project PID #76439 December 12, 2006.
MANATEE COUNTY TRAFFIC SIGNAL RETIMING Orange Blossom Trail (SR 500/US 441) from Oak Ridge Road to I-4 FPID Design Phase Public Information.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
City of Belmont Pavement Reconstruction Project October 15, 2014.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT.
S.R. 520 (West Merritt Island Causeway) SR 520 (West Merritt Island Causeway) From West of Myrtice Avenue to S.R. 3 Courtenay Parkway FPID
RebuildIndy Indianapolis Department of Public Works March 2011.
ROAD SAFETY BE SAFE, BE SENSIBLE AT DROP OFF AND PICK UP TIME.
WELCOME! Please sign-in at Front Desk and pick up a Project Brochure and Speaker Request Card Feel free to review project displays and discuss project.
Improvements to Stockton Street
2nd Street Drainage and Paving Improvements
Agenda Updates to Driveway and Sidewalk specifications and permits
S.R. 30A / U.S. 98 / Panama City Beach Parkway
June 5, 2017.
Sheldon (Maple to Library) Preferred Design Meeting
Drive Right Chapter 2 Unit 1
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
DISTRICT 7 DESIGN-BUILD PUSH BUTTON (FEDERAL SAFETY AND STATE FUNDS)
District 3 Complete Streets Projects
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Begin Project End Project Welcome to the SR 530/US 192 Highway Improvement Project Informational Meeting Thursday, February 8, 2007.
US1 AT CANAL STREET INTERSECTION DESIGN DEVELOPMENT
STREETS & STORMWATER DEPARTMENT
Public Information Meeting NW 100th Street Reconstruction Project
Meeting of the Hillsborough MPO Board December 5, 2017
Transportation Alternatives (TA) Set-aside
Citrus Park Drive Extension
Safe Driving Rules and Regulations
Midblock Crossings Lesson 12 Publication No. FHWA-HRT
Highway 169 Bridge Replacement & Pavement Resurfacing
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
US 75 Improvement Study Thanks for attending the Texas Department of Transportation’s first Grayson County open house for the US 75 Project from FM 1417.
FOR LOCAL AGENCY FEDERAL AID PROJECTS
SE 12th Street Roadway Improvements February 8, 2005.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Contract 60X10 Informational Meeting Weber I-55
Design Criteria CTC 440.
Meadow Lake Boulevard Street Extension Project
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
lesson 2.3 ROADWAY MARKINGS
Commissioners Presentation
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Training Session 7 Outreach Events Warm Up -Story Time
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
ADA Transition Plan – Brief Overview
Interlocal Cooperative Agreement FY 20
Buckner Road Interchange at I-65 Public Meeting
Presentation transcript:

WELCOME State Road 50 (Cheney Highway) Overview and Methodology Design outreach to gain input A previous public meeting was held on May 21, 2009 Give us your input Good Evening, I’m Jeremy Dilmore the Department’s Project Management Supervisor for this project. At this time I would like to recognize City Commissioner ____ and State Representative _______ (point). Thank you commissioner for being here tonight. This presentation is to outline the milling and resurfacing project for State Road 50 also known as Cheney Highway. We have project exhibits for you to review and FDOT staff and Engineers are available for questions. Comment forms are available for you to provide us with your input. I will give a brief overview of the project, and afterwards you are encouraged to view the exhibits, read the literature and ask questions of anyone with nametag that you see around the room. Please, if you haven’t already done so, sign in at the table near the door.

Public Meeting This meeting is being held in accordance with Chapter 23 Code of Federal Regulations, Titles Six and Eight of the Civil Rights Act and Americans with Disabilities Act. If you need additional information pertaining to the Department’s compliance with Title Six and/or Title Eight, please see one of our project team members that are working the sign-in table at the front entrance.

SR 50 Milling & Resurfacing This project is along on State Road 50/Cheney Highway in Titusville (CLICK) from I-95 to US 1.

SR 50 Milling & Resurfacing Mill & Resurface Signing & Pavement Markings to designate Bicycle Lanes ADA upgrades, curb ramps and new sidewalk construction The project includes milling and resurfacing the existing four lanes and signing and pavement markings will eliminate on-street parking and designate bicycle accomodations along both sides of the roadway.

Sidewalk SR 50 SR 405 New Sidewalk Existing Sidewalk We are adding new sidewalk to the southwest corner of the SR 50 and SR 405 intersection (CLICK) to connect to existing sidewalk along Ronald McNair Way (CLICK). SR 405 Existing Sidewalk

SR 50 Milling & Resurfacing Schedule Design Complete Spring 2011 Bid Letting Summer 2011 Construction Complete Late 2011 Construction Cost Estimate $6.7 M The design of this project will be complete spring 2011, and will be let for construction bids. Construction will be approximately six months. During construction traffic will be maintained in both directions. Lane closures during construction will be limited to non-rush hour periods. Access to businesses will be maintained. The estimated construction cost of the project is $6.7 million dollars.

SR 50 Milling & Resurfacing Fill Out Tonight… Or Take it with you and mail it in by July 13th. We encourage you to ask questions of the experts that are here tonight, take a look at the exhibits, and please fill out a comment form and drop it in the tray on the table as you leave, or mail it back to us by July 13th. Thank you. At this time please feel free to ask questions of the folks with nametags and check out the exhibits.